GPA Guarantee: Score A+ in Final Season

Lecture Transcribe |LMS sync |Live Tutor Q&A

Save up to $105 · All plans 50% off

50% offAll plan

Save up to $105

ACCTG 221 Cheatsheet · Cost and Management Accounting

University of Auckland · Cheatsheet for the final exam. Semester Two examination period, 29 October – 16 November 2026 (check your personal exam timetable). Full ACCTG 221 study guide →

A4 landscape · 7pt · 6 columns · two print sidesACCTG 221 · S2 2026
ACCTG 221
Cost and Management Accounting
University of Auckland · Level 2 · Semester 2, 2026
ACCTG 221 cheatsheet QR code – open the full ACCTG 221 study guide
Full guide + ask Sia
about ACCTG 221
SIDE 1/2   METHOD MAP · formulas · assumptions · decision rulesOPEN-BOOK EXAM SHEETv2 · 2026-10-24

1 · Exam map course data + final announcement

102020FINAL 50%
AssessmentWt
Turn-ins and Self-reviews10%
Assignment20%
Test20%
Final Exam50%

“Summary sheets. These must be A4 size or smaller and may be either typed or handwritten. A maximum of five double-sided sheets is permitted.” ACCTG 221 course home announcement on the final exam, Semester 2 2026 (MD_ACCTG_221_Cost_and_Management_Accounting_Home_3.md)

2 · CVP sequence Ch 1 · W1

SP − VC= CM/unitCM × Q= total CMtotal CM− FC = profitkeep unit $ separate from total $
Read every CVP question left to right; fixed cost enters after total contribution.

core formulasCM/u = selling price − variable cost/u
CM ratio = CM ÷ sales revenue
Profit = Q × CM/u − fixed cost
BE units = fixed cost ÷ CM/u
BE sales $ = fixed cost ÷ CM ratio
Target Q = (fixed cost + target profit) ÷ CM/u
Margin of safety = expected sales − BE sales

When it bites: identify whether the answer is units, sales dollars, bundles or %. Round a whole-unit target upward, then prove: rounded Q × CM − fixed cost ≥ target. Model assumes price, unit variable cost, fixed-cost pool and mix hold within the relevant range.

Sales mix

Build one composite bundle from the stated proportions. Bundle CM = Σ(product quantity × product CM). Find break-even bundles, then unpack each product quantity. A changed mix requires a new bundle; do not reuse the old weighted contribution.

Changed assumptionRebuildExpected direction, all else equal
Selling price risesCM denominatorRequired units fall
Unit variable cost risesCM denominatorRequired units rise
Fixed cost risesNumeratorRequired units rise
Sales mix changesComposite bundleDepends on weighted CM
Capacity step crossedFixed-cost pool + rangeOld linear answer invalid

Reverse questions: when volume is given, rearrange the same profit equation to solve for selling price, allowable variable cost or fixed cost. Change one assumption at a time, state the feasible capacity, and compare scenarios in both numerical and managerial language.

Interpretation check: a larger safety margin puts expected sales further above break-even, but does not prove demand or capacity. State its denominator and forecast assumption.

3 · Cost behaviour Ch 2 · W2

PatternTotalPer unit
Variablechanges with activityconstant
Fixedconstant in rangefalls as activity rises
Mixedfixed + variabledepends on volume
Stepconstant by bandjumps at capacity step

high–lowVariable rate b = (Cost at high activity − Cost at low activity) ÷ (High activity − Low activity)
Fixed cost a = Total cost − b × activity
Cost function: Y = a + bX

Select highest and lowest activity, not highest and lowest cost. Substitute into both selected observations; fixed-cost estimates should agree apart from rounding. High–low uses only two points, so flag outliers and range limits.

Evidence boundary: sketch the expected cost line before calculating. A variable-cost line begins at the origin; a fixed-total line is horizontal; a mixed line has a positive intercept. Compare a high–low result with the other observations. Regression uses all observations and can report statistical evidence about a proposed driver, but a neat line still needs causal sense and the relevant range.

4 · Support allocation Ch 2 · decision table

MethodRecognises support-to-support?Procedure
DirectNoRenormalise over operating departments only.
Step-downPartlyChoose order; allocate; close department; never receive back.
ReciprocalFullySolve simultaneous full-cost equations, then allocate outward.
People P$44,000Systems S$30,00010% P20% SP = 44,000 + .20SS = 30,000 + .10P
Mutual arrows become simultaneous equations before any operating allocation.

5 · Choose the costing system Ch 3 · W3

Distinct output?YESNOJOBtrace each orderPROCESSaverage a flow
Custom contracts and batches point to job records; homogeneous continuous output points to process averaging.
Question clueUseCentral proof
Identifiable order, batch or serviceJob costingDM + DL + applied OH = job cost
Homogeneous departmental flowProcess costingPhysical units and total cost reconcile

6 · Job costing Ch 3

rate and applicationPredetermined OH rate = budgeted OH ÷ budgeted allocation-base quantity
Applied OH = rate × actual base used by job
Total job cost = direct material + direct labour + applied OH
Unit cost = total job cost ÷ job units

A predetermined rate gives timely job costs before actual period totals are known. Label the base (machine-hour, labour-hour, etc.). At period end compare actual OH with applied OH; under/overapplication is period-wide unless instructed otherwise.

Job record receivesSource / calculation
Direct materialTrace to the identifiable job.
Direct labourTrace labour used by the job.
Applied overheadPredetermined rate × actual job base.
Unit costTotal job cost ÷ job output.

7 · Process costing Ch 3 · weighted average

  1. Physical flow: opening WIP + started = transferred + ending WIP + loss.
  2. Equivalent units: separate materials and conversion completion.
  3. Cost/EU: cost to account for ÷ equivalent units.
  4. Assign cost: transferred + ending WIP (+ separately treated loss).

8 · Spoilage schedule Ch 4 · W4

INSPECTION · 80% conv.ending WIP 50%not yet detectedgood + spoiledpassed point
The inspection point decides which units can be detected as loss and which good units bear normal spoilage.
  1. Add spoilage as a separate physical-flow line.
  2. Mark inspection point; ask which categories reached it.
  3. Read the stated normal-loss base exactly.
  4. Normal loss = rate × stated base; abnormal = detected loss − normal.
  5. Assign normal cost to qualifying good output; report abnormal cost separately.

loss splitPhysical spoilage = units to account for − good transferred − ending WIP
Abnormal units = detected spoilage − normal units

Normal does not mean desirable. It is expected under efficient conditions and absorbed by good output. Abnormal loss remains visible for investigation. Keep any disposal value or rework recovery separate unless the stated method says where it goes.

9 · ABC two-stage trace Ch 5 · W5

resource OHactivity poolsdriver ratesCustom use×rateStandard use×rate
Separate pools, calculate one rate per causal driver, then charge measured consumption.

ABCDriver rate = activity-pool cost ÷ total driver volume
Product OH = Σ(driver rate × product driver use)
ABC unit cost = direct unit cost + product OH ÷ product units

Reconcile each pool before pricing or profitability claims. ABC redistributes existing overhead; it saves cash only if an activity changes and resources are removed or redeployed. It is most useful when overhead is material, complexity differs and credible drivers can be maintained.

10 · Linked budgets Ch 7 · W8

SALES FORECASTprod./purch.cash timinginv. policyCASH + FINANCING
Demand drives operating schedules; timing and inventory policy converge in cash and financing.

inventory linksProduction = sales + desired ending FG − opening FG
Purchases = cost of sales + desired ending inventory − opening inventory
Cash ending = opening cash + receipts − payments + financing

Keep inventory schedules on a cost or unit basis; collections use sales revenue. Follow each cohort across periods and prove its percentages total the expected collection. A profitable budget can still require borrowing because cash dates differ from accrual recognition.

CheckProof
InventoryOpening + purchases/production = use + ending
CollectionsEach sales cohort is fully traced
CashOpening + net flows + finance = ending
SpreadsheetOne labelled assumption; no stale duplicate

Scenario discipline: slower collections shift cash later without immediately changing sales revenue; higher inventory policy raises near-term purchases and cash needs. Identify the maximum borrowing month and keep interest timing separate from principal.

11 · Flexible-budget bridge Ch 8 · W9

AQ × APactualAQ × SPprice resetSQ × SPflex standardPRICEEFFICIENCYadjacent gaps = total variance
Change one factor at a time: actual price first, then input quantity at standard price.

direct-input variancesAP = actual cost ÷ AQ
SQ allowed = actual output × standard input/unit
Price = AQ × (AP − SP)
Efficiency = SP × (AQ − SQ)
Total = AQ × AP − SQ × SP

12 · Relevant-cost tree Ch 9 · W10

Future amount differs?YES: cash ΔNO: sunk/com.Constraint: add best-use CM forgone
Relevance belongs to a stated alternative and horizon, not to permanent variable/fixed labels.

decision amountIncremental profit = incremental revenue − relevant variable cost − relevant fixed cost − opportunity cost
Contribution per scarce unit = product CM ÷ scarce-resource use

DecisionCompare
Special orderPrice against variable + special fixed + opportunity cost
Keep/dropLost contribution vs avoidable fixed cost + alternate use
Make/buyAvoidable internal cost vs purchase + opportunity cost
ConstraintRank by CM per bottleneck unit; respect demand limits

Allocated common cost is irrelevant if it remains. A fixed cost is relevant when avoidable. State capacity and time-horizon assumptions, then add qualitative differences: quality, reliability, customer response, skills and supplier dependence.

13 · Performance + ethics Ch 6 + 10

learningprocesscustomerfinanciallead → lag
A scorecard is a testable causal chain, not four unrelated measures.

returnsROS = operating income ÷ revenue
ROI = operating income ÷ total investment
RI = operating income − required return × investment
EVA = after-tax operating income − WACC × (total assets − current liabilities)

For each objective specify definition, owner, source and target. Pair speed with quality, sales with margin, and cost cuts with safety/service. Test timing; correlation does not prove the map.

asksia.ai/cheatsheet/auckland-acctg221
Forward this to your tutorial group · Shared by ________
ACCTG 221side 1/2 · v2 · 2026-10-24
Semester Two examination period, 29 October – 16 November 2026
(check your personal exam timetable).
ACCTG 221
Cost and Management Accounting · Worked Drills
University of Auckland · source-numbered methods · proof before interpretation
ACCTG 221 cheatsheet QR code – open the full ACCTG 221 study guide
Full guide + ask Sia
about ACCTG 221
SIDE 2/2   WORKED DRILLS · traps · fast recall · final checksOPEN-BOOK EXAM SHEETcarry every example to the proof

14 · Harbour Lamps course overview worked example

Given: selling price $58; variable cost $40 per lamp; fixed cost $72,000/month; target profit $27,000; expected sales 6,000 lamps.

StepCalculationAnswer
CM/u58 − 40$18
Break-even72,000 ÷ 184,000 lamps
Target(72,000 + 27,000) ÷ 185,500 lamps
Safety6,000 − 4,0002,000; 33.3%
revenuetotal cost4,000 lampsBE$Q
At 4,000 lamps, 4,000 × $18 contribution exactly covers $72,000 fixed cost.

proof4,000 × $18 = $72,000 → profit $0
5,500 × $18 − $72,000 = $27,000

Trap: the course chapter’s separate desk-lamp drill uses $48 selling price and $30 total variable cost, also producing $18 contribution. Do not merge inputs from different questions.

15 · Tāmaki mix Ch 1 quick drill

Bundle = 3 Standard at $12 CM + 2 Premium at $22 CM; fixed cost $160,000.

Bundle CM = 3×12 + 2×22 = $80
BE bundles = 160,000 ÷ 80 = 2,000
Units = 6,000 Standard + 4,000 Premium

Proof: 2,000 × $80 = $160,000. If bundles are fractional, round bundles up before multiplying every product quantity.

CVP trapCorrection
Revenue in denominatorUse contribution, after variable cost.
Old weighted CMRebuild bundle after mix change.
Answer outside capacityMathematically sufficient ≠ feasible plan.

CVP answer skeleton

  1. Classify selling price, unit variable costs and total fixed cost.
  2. Compute CM with its unit; for a mix, draw one composite bundle.
  3. Write profit = total CM − fixed cost and solve for the requested unknown.
  4. Round only the decision quantity, then prove the target is met.
  5. State the relevant range, capacity and stable-mix assumptions.

16 · High–low check Ch 2 practice

Given: 900 machine-hours cost $26,600; 300 hours cost $18,800.

workb = (26,600 − 18,800) ÷ (900 − 300)
= 7,800 ÷ 600 = $13/MH
a = 26,600 − 900×13 = $14,900
Y = $14,900 + $13MH

Proof pointSubstitutionCost
High14,900 + 13×900$26,600
Low14,900 + 13×300$18,800

Interpret: $13 is estimated variable cost per machine-hour; $14,900 is total fixed cost within the observed relevant range. Two-point evidence is provisional if either month is unusual.

17 · City Services reciprocal Ch 2 worked example

IT$90,000HR$60,00020% IT10% HRIT = 90,000 + .10HRHR = 60,000 + .20ITsolve totals, then allocate outward
Each equation starts with own direct cost and adds the service received from the other department.

IT = 90,000 + .10(60,000 + .20IT)
.98IT = 96,000 → IT = $97,959.18
HR = 60,000 + .20(97,959.18)
HR = $79,591.84

Allocate these full reciprocal totals using operating shares that exclude self-service. Do not mistake the sum of reciprocal totals for extra external cost: circular services have been resolved inside the equations.

Allocation trapFix
Step-down sends cost backClosed department never receives again.
Direct includes support denominatorRenormalise to operating recipients.
Equations reverse percentagesUse service received in each equation.

Method switch test

Fact in questionMethod implication
Ignore all support-to-support useDirect allocation
Recognise some service in a closure orderStep-down; state who closes first
Recognise mutual flows fullyReciprocal equations
Weak or convenient baseAllocation may not reflect causality

18 · Waitematā Foods Ch 3 quick drill

Given: 920 units transferred; 320 ending units; materials 100% complete; conversion 40% complete.

1,240 unitsto account920 transferredEU M920 · C920320 ending WIPEU M320 · C128
Physical units stay 1,240; equivalent work differs by cost category.
Cost categoryTransferredEnding WIPEU
Materials920320×100%=3201,240
Conversion920320×40%=1281,048

Physical proof: 920 + 320 = 1,240 units. The guide’s fuller Koru Drinks drill has 140 opening + 1,100 started = the same 1,240 total; keep each question’s facts separate.

19 · Manukau Mixers loss Ch 4 quick drill

Given: 4,600 good units; 300 spoiled at end; normal rate 4% of good output; $15 per EU at inspection.

unitsNormal = 4% × 4,600 = 184
Abnormal = 300 − 184 = 116

costNormal cost = 184 × $15 = $2,760 → good output
Abnormal cost = 116 × $15 = $1,740 → separate

Proof: 184 + 116 = 300 spoiled; $2,760 + $1,740 = $4,500 detected-loss cost. Apply the normal rate to the stated base, never automatically to units started.

Spoilage trapCorrection
Ending WIP before inspectionCannot yet be classified as detected spoilage.
Abnormal as another %It is the residual after normal units.
Normal = acceptableAccounting expectation, not approval of waste.

Tui Ceramics inspection drill

Given: 10,000 units started; 8,400 good transferred; 600 ending WIP at 50% conversion; inspection at 80%; normal spoilage is 8% of good units passing inspection.

Physical spoilage = 10,000 − 8,400 − 600 = 1,000 units
Ending WIP is before inspection → not detected loss
Normal = 8%×8,400 = 672 units
Abnormal = 1,000−672 = 328 units

20 · North Shore Cases ABC Ch 5 worked example

Pools: setup $360,000/120 setups; dispatch $560,000/28,000 orders. Custom: 90 setups, 8,000 orders, 10,000 units, $120 direct/u. Standard: remaining 30 setups, 20,000 orders, 20,000 units, $85 direct/u.

Setup rate$3,000/setupDispatch rate$20/orderCUSTOM270k+160k=$430kSTANDARD90k+400k=$490k$430,000 + $490,000 = $920,000 pools
Both activity pools reconcile before unit costs are interpreted.
CustomStandard
OH/unit430,000÷10,000=$43490,000÷20,000=$24.50
Direct/unit$120$85
ABC/unit$163$109.50

Decision: complexity makes Custom consume most setups. This is a cost signal, not automatic saving. A price or process recommendation must test driver causality, demand, avoidability and implementation cost.

21 · Karangahape Traders Ch 7 quick drill

Given: July sales $240,000; August $300,000; COS 60%; ending inventory 25% of next month’s COS; July opening inventory $36,000. Collections: 70% current, 30% next.

July COS = .60×240,000 = $144,000
July ending = .25×(.60×300,000) = $45,000
July purchases = 144,000 + 45,000 − 36,000
= $153,000
August collections = .70×300,000 + .30×240,000
= $282,000

70% August sales$210,00030% July sales$72,000$282,000
Collection cohorts meet in the month cash moves; inventory stays on its cost basis.
TrapWhy wrong
25% × August salesInventory policy uses next month’s cost of sales.

Aoraki Cycles linked May plan

22 · Southern Packs variance Ch 8 worked example

Given: standard 2.5 kg at $8/kg per finished unit; actual output 1,200; actual quantity 3,180 kg costing $27,030.

AQ × AP$27,0303,180×8.50AQ × SP$25,4403,180×8SQ × SP$24,0003,000×8$1,590 U$1,440 UTOTAL $3,030 U
The three amounts make the sign and reconciliation visible.

AP = 27,030 ÷ 3,180 = $8.50/kg
SQ = 1,200×2.5 = 3,000 kg
Price = 3,180×(8.50−8.00) = $1,590 U
Efficiency = 8×(3,180−3,000) = $1,440 U
Total = 27,030−24,000 = $3,030 U

Proof: 1,590 + 1,440 = 3,030 U. Standard quantity comes from actual output. Investigate only after reconciliation: price, material quality, waste, defects, delivery and downtime may interact.

23 · Fast variance extensions Ch 8 practice

Cause note: size + direction → operational hypothesis → related variance/non-financial measure → evidence required. Variances identify questions; they do not prove causes or assign blame.

Common errorRepair
Planned output in SQUse actual output × standard input relationship.
Favourable = goodCheck quality, service, safety and recurrence.
Signs memorised blindlyWrite the three dollar columns and take adjacent gaps.

Variable-overhead drill

Standard support is 1.5 hours at $13 per finished unit. Actual output 1,000 units; actual hours 1,550; actual overhead $20,460.

AR = 20,460÷1,550 = $13.20/h
SQ allowed = 1,000×1.5 = 1,500 h
Spending = 1,550×(13.20−13.00) = $310 U
Efficiency = 13×(1,550−1,500) = $650 U
Total = $960 U

Proof: actual $20,460 − flexible standard (1,500×$13 = $19,500) = $960 U. Pair spending with rate evidence and efficiency with the operational use of the allocation base; do not infer a cause from the sign alone.

24 · Waiheke special order Ch 9 worked example

Given: 1,500 jackets at $74; variable cost $52 each; setup $6,000; idle capacity 900; remaining 600 displace regular jackets contributing $28 each.

900 idle unitsno forgone CM600 displaced600×$28Order CM: 1,500×($74−$52)= $33,000Setup $6,000 + opportunity $16,800Incremental profit = $10,200
Split capacity first: only displaced units carry the $16,800 opportunity cost.
LineCalculationEffect
Revenue1,500×74+$111,000
Variable cost1,500×52−$78,000
Setupgiven−$6,000
Opportunity600×28−$16,800
Profit+$10,200

Accept on the stated financial facts before qualitative effects. The conclusion depends on the capacity fact; with 1,500 idle units opportunity cost would be zero. Check customer response, quality, workforce effects and regular-market relationships.

25 · Waitematā returns Ch 10 quick drill

Given: revenue $2,400,000; operating income $300,000; investment $1,250,000; required return 14%.

ROS = 300,000 ÷ 2,400,000 = 12.5%
ROI = 300,000 ÷ 1,250,000 = 24.0%
Charge = 14%×1,250,000 = $175,000
RI = 300,000−175,000 = $125,000

ROS 12.5%ROI 24.0%RI $125k%
ROS and ROI are percentage returns; residual income is a dollar value after the capital charge.

ROI conflict: a project returning 18% exceeds a 12% required return but lowers a division currently at 24%; RI can encourage acceptance while ROI can encourage rejection.

26 · Method chooser all chapters · fast recall

Prompt clueBuild first
Price, VC, FC, targetCM equation + answer unit
High/low activityΔcost÷Δactivity; intercept
Mutual supportFull-cost equations
Part-complete outputPhysical flow; separate EU
asksia.ai/cheatsheet/auckland-acctg221
Forward this to your tutorial group · Shared by ________
ACCTG 221side 2/2 · v2 · 2026-10-24
Semester Two examination period, 29 October – 16 November 2026
(check your personal exam timetable). Check your unit's exam rules for any limit on what may be brought in.

Want one for YOUR exact syllabus?

Sia is your free desktop study agent. Drop your University of Auckland ACCTG 221 slides — Sia builds a sheet tailored to YOUR exam. Better than this library because it knows YOUR materials.

↓ Download Sia · Free