about ITLS6002
0 · Exam Mapcourse data · Canvas
| Assessment | Format / timing | Weight |
|---|---|---|
| Final Exam essay and model-based questions | Written · 2 h · formal exam period | 35% |
| Computer exam – inventory control | Practical · 2 h · Week 08 | 35% |
| Group assignment Report | Written group work · 8 pages max | 30% |
“You can bring a double-sided A4 sheet of paper full of whatever notes you want into the exam.” (ITLS6002 Canvas final exam information, Semester 2 2026)
All material is assessable; the guide identifies particular emphasis on aggregate planning and the first network-design block. Excel is required. For every model: define the decision, keep units/time bases visible, make constraints auditable, interpret the operating consequence, then state what change would reverse the choice.
1 · Method Routertopic maps · FAQ
| Case signal | Use | Output |
|---|---|---|
| Steady repeated demand; fixed order + holding cost | EOQ | Order size Q* |
| Certain lead time/demand | ROP | Trigger, not lot size |
| Uncertain demand; monitored continuously | (Q,R) | Q* + ROP |
| Review every R periods | Order-up-to | Target S; order S−IP |
| One selling chance | Newsvendor | Demand percentile |
| Demand varies by period | Lot-sizing / MIP | Qt, It, setup |
| Open sites + allocate flow | Fixed-charge MIP | yi, xij |
2 · EOQ + Reorder TriggerCh 1 · final model
Symbols and calculation
| D | annual demand, units/year | S | fixed cost/order |
|---|---|---|---|
| C | unit value | i | annual carrying rate |
| H | iC, $/unit-year | d,L | demand/time; lead time |
lot sizeQ* = √(2DS/H)
orders/year = D/Q · average cycle stock = Q/2
TRC(Q) = DS/Q + HQ/2
timingInventory position IP = on-hand + scheduled receipts − backorders
certain-demand ROP = dL
with uncertainty: ROP = mean lead-time demand + safety stock
Assumptions: constant demand; instantaneous replenishment; no stockouts; constant order and holding costs. Constant purchase cost drops from the basic objective because it cannot change Q*. It returns for quantity discounts. Lead time changes ROP, not basic EOQ.
| Check | What failure means |
|---|---|
| At unconstrained Q*: DS/Q ≈ HQ/2 | Time basis, H conversion or brackets wrong |
| Q has units; ROP has position units | Lot size and trigger were mixed |
| Candidate is feasible | Test neighbouring cartons/breakpoints |
| All candidates use same annual basis | Comparison is invalid |
| Input change | Policy effect |
|---|---|
| S rises | Q* rises through the square root; trigger unchanged if d and L do not move. |
| H rises | Q* falls; more frequent, smaller orders. |
| D rises | Q* rises and lead-time demand rises when d rises. |
| L rises, certain | ROP rises; basic Q* does not. |
Exam Report the mathematical Q*, then compare neighbouring feasible multiples. Equality of order and holding cost need not survive a carton, capacity or discount constraint.
3 · Safety Stock + ReviewCh 2 · policy comparison
Protection interval is the exposure the policy must cover. Continuous review can react immediately and protects L. Periodic review waits until the next review and protects R+L. Draw the interval before choosing mean and deviation.
independent period demandExposure T: mean = μT · deviation = σ√T
SS = zσ√T
continuous reviewT=L · ROP = μL + zσ√L
periodic reviewT=R+L · order-up-to S = μ(R+L)+zσ√(R+L)
order now = S − current inventory position
| Question | Correct response |
|---|---|
| What varies? | Demand, lead time, or both; use compatible time bases. |
| May σ scale by √T? | Only for independent, identically distributed period demands. |
| Cycle service or fill rate? | Cycle service = no-stockout probability. Fill rate = demand supplied immediately. |
| Use z directly for fill rate? | No: use the expected-shortage relation. |
| Both demand and lead time uncertain? | Use the course compound variance; do not add raw SDs. |
Raising the target raises z and safety stock. Price the consequence as incremental stock × annual holding cost. A service recommendation names the metric, protection, added carrying cost and assumption about demand dependence.
Policy sentence: “Review continuously and release Q when IP reaches R,” or “At each review order S−IP.” Add the units and the service metric. This prevents a correct target from becoming the wrong operational action.
4 · Advanced InventoryCh 3 · choose structure
All-units quantity discounts
- For each price bracket compute H=iC and its EOQ.
- Retain a feasible EOQ; otherwise retain the bracket's lowest qualifying quantity.
- Compare full annual cost for every feasible candidate.
TAC(Q) = DC + DS/Q + iCQ/2
Reject a Q that does not qualify for its assumed price. Purchase cost and price-based holding cost both change across brackets.
Single-period newsvendor
Use only for one selling opportunity with defined underage/overage consequences—not normal carry-over or routine backorders.
Cᵤ = selling price − purchase cost
Cₒ = purchase cost − salvage value
critical fractile = Cᵤ/(Cᵤ+Cₒ)
choose first demand Q with F(Q) ≥ fractile
Time-varying lot sizing
Iₜ = Iₜ₋₁ + Qₜ − Dₜ
Qₜ ≤ capacityₜ × yₜ; yₜ ∈ {0,1}
The balance preserves flow. Binary yₜ activates the fixed setup cost and blocks positive quantity when no setup is released. Audit every period, non-negativity and the final position.
Installation stock is one location’s own inventory. Echelon stock includes that location and the downstream inventory it supports. Circle what each control point counts before assigning demand and lead-time exposure; otherwise the same protection can be treated as unrelated buffers.
| Signal | Boundary check |
|---|---|
| Price break | Bracket feasibility + all cost components |
| Short-life item | Cu/Co defined from the case |
| Seasonal demand | Period balance; do not force EOQ |
| Several stages | Installation vs echelon stock |
5 · Aggregate Planning + S&OPCh 4 · final emphasis
Translate medium-term demand into production, workforce, overtime, subcontracting, inventory and backlog decisions. The model supplies trade-offs; S&OP reconciles demand, operations and finance and approves one feasible plan.
no-backlog material balanceending inventoryₜ = beginning inventoryₜ + regularₜ + overtimeₜ + subcontractₜ − demandₜ
beginning inventoryₜ₊₁ = ending inventoryₜ
| Policy | Adjustment | What to expose |
|---|---|---|
| Level | Stable capacity/workforce; inventory or backlog absorbs variation | Holding, backlog, service and final stock |
| Chase | Capacity/workforce tracks demand | Hiring, firing, disruption and capacity |
| Hybrid | Spreads response across levers | Every limit and category cost |
Build → audit → recommend
- Separate forecast, capacities, costs and opening conditions from decisions.
- Reconcile each period before calculating cost. Keep one sign convention for inventory/backlog.
- Check regular/overtime/subcontract limits, non-negativity and final-balance requirement.
- Recompute every cost category from displayed quantities; compare plans on the same horizon, opening position, service rules and cost basis.
- Explain the operating pattern; test demand, capacity or cost sensitivity; state a reversal condition.
6 · Facility + Distribution DesignCh 5–6 · final emphasis
Fixed-charge facility model
minimise ΣᵢFᵢyᵢ + ΣᵢΣⱼcᵢⱼxᵢⱼ
serve each zone: Σᵢxᵢⱼ = dⱼ
open/capacity link: Σⱼxᵢⱼ ≤ Capᵢyᵢ
xᵢⱼ ≥ 0; yᵢ ∈ {0,1}
Fixed cost rewards consolidation; transport, handling and service may reward proximity. Verify each destination separately—a correct network total can hide one short zone and one oversupplied zone. Report opened sites, flows, utilisation and cost; test demand growth, cost change, capacity loss and service constraints.
Location estimate + channel choice
centre of gravity: x̄ = Σxⱼwⱼ/Σwⱼ · ȳ = Σyⱼwⱼ/Σwⱼ
This generates a candidate, not a decision: test discrete sites, road access, capacity, fixed cost, risk and response requirements. For distribution, compare inventory aggregation, facility expense, transport, response time, assortment, customer effort, returns and scalability.
| Structure | Trade-off |
|---|---|
| Direct / central parcel | Pooling and less duplication; longer individual transport |
| Local storage/delivery | Fast response; fragmented stock and route economics |
| Pickup / stores | Consolidated last mile; customer effort/local presence |
| Hybrid | Valid only with explicit product/customer routing rules |