ITLS6002 Cheatsheet · Supply Chain Planning and Design

University of Sydney · A4 cheat sheet for the final exam. Semester 2 formal examination period, from 16 November 2026 (the Exams Office publishes the exact date). Full ITLS6002 study guide →

A4 landscape · one sheet · both sides · 6 columns per sideITLS6002 · S2 2026
ITLS6002
Supply Chain Planning and Design
The University of Sydney · postgraduate · Semester 2 2026
ITLS6002 cheatsheet QR code – open the full ITLS6002 study guide
Full guide + ask Sia
about ITLS6002
SIDE 1/2   ONE A4 NOTE SHEET · formulas → constraints → checks → recommendationmethods + decision rulesfinal: essay + model-based questions · 35% · 2 hours

0 · Exam Mapcourse data · Canvas

Final exam 35%Computer exam 35%Group report 30%
AssessmentFormat / timingWeight
Final Exam essay and model-based questionsWritten · 2 h · formal exam period35%
Computer exam – inventory controlPractical · 2 h · Week 0835%
Group assignment ReportWritten group work · 8 pages max30%

“You can bring a double-sided A4 sheet of paper full of whatever notes you want into the exam.” (ITLS6002 Canvas final exam information, Semester 2 2026)

All material is assessable; the guide identifies particular emphasis on aggregate planning and the first network-design block. Excel is required. For every model: define the decision, keep units/time bases visible, make constraints auditable, interpret the operating consequence, then state what change would reverse the choice.

1 · Method Routertopic maps · FAQ

Case signalUseOutput
Steady repeated demand; fixed order + holding costEOQOrder size Q*
Certain lead time/demandROPTrigger, not lot size
Uncertain demand; monitored continuously(Q,R)Q* + ROP
Review every R periodsOrder-up-toTarget S; order S−IP
One selling chanceNewsvendorDemand percentile
Demand varies by periodLot-sizing / MIPQt, It, setup
Open sites + allocate flowFixed-charge MIPyi, xij
Exam Method marks begin with the policy question: how much, when, where, or through which channel? Name it before calculating.
EOQorderholdingtotal
EOQ trade-off: the minimum occurs where annual ordering and cycle-stock holding costs balance.
Trap → fix With constant price, purchase cost cannot change EOQ; when price varies, restore it and test bracket breakpoints. Apply ROP to inventory position—not shelf stock—to avoid duplicating an order in transit.

2 · EOQ + Reorder TriggerCh 1 · final model

Symbols and calculation

Dannual demand, units/yearSfixed cost/order
Cunit valueiannual carrying rate
HiC, $/unit-yeard,Ldemand/time; lead time

lot sizeQ* = √(2DS/H)
orders/year = D/Q · average cycle stock = Q/2
TRC(Q) = DS/Q + HQ/2

timingInventory position IP = on-hand + scheduled receipts − backorders
certain-demand ROP = dL
with uncertainty: ROP = mean lead-time demand + safety stock

Assumptions: constant demand; instantaneous replenishment; no stockouts; constant order and holding costs. Constant purchase cost drops from the basic objective because it cannot change Q*. It returns for quantity discounts. Lead time changes ROP, not basic EOQ.

CheckWhat failure means
At unconstrained Q*: DS/Q ≈ HQ/2Time basis, H conversion or brackets wrong
Q has units; ROP has position unitsLot size and trigger were mixed
Candidate is feasibleTest neighbouring cartons/breakpoints
All candidates use same annual basisComparison is invalid
Input changePolicy effect
S risesQ* rises through the square root; trigger unchanged if d and L do not move.
H risesQ* falls; more frequent, smaller orders.
D risesQ* rises and lead-time demand rises when d rises.
L rises, certainROP rises; basic Q* does not.

Exam Report the mathematical Q*, then compare neighbouring feasible multiples. Equality of order and holding cost need not survive a carton, capacity or discount constraint.

lead timeROPreceipttime →
Apply the trigger to inventory position; receipt occurs after the lead-time interval.

3 · Safety Stock + ReviewCh 2 · policy comparison

Protection interval is the exposure the policy must cover. Continuous review can react immediately and protects L. Periodic review waits until the next review and protects R+L. Draw the interval before choosing mean and deviation.

independent period demandExposure T: mean = μT · deviation = σ√T
SS = zσ√T

continuous reviewT=L · ROP = μL + zσ√L

periodic reviewT=R+L · order-up-to S = μ(R+L)+zσ√(R+L)
order now = S − current inventory position

QuestionCorrect response
What varies?Demand, lead time, or both; use compatible time bases.
May σ scale by √T?Only for independent, identically distributed period demands.
Cycle service or fill rate?Cycle service = no-stockout probability. Fill rate = demand supplied immediately.
Use z directly for fill rate?No: use the expected-shortage relation.
Both demand and lead time uncertain?Use the course compound variance; do not add raw SDs.

Raising the target raises z and safety stock. Price the consequence as incremental stock × annual holding cost. A service recommendation names the metric, protection, added carrying cost and assumption about demand dependence.

Policy sentence: “Review continuously and release Q when IP reaches R,” or “At each review order S−IP.” Add the units and the service metric. This prevents a correct target from becoming the wrong operational action.

safety stockmeanROP
Mean protected demand sets the centre; z × exposure deviation moves the trigger into the tail.
Exam The periodic target is not the order quantity. The action is S−IP at review, then apply rounding or capacity.

4 · Advanced InventoryCh 3 · choose structure

All-units quantity discounts

  1. For each price bracket compute H=iC and its EOQ.
  2. Retain a feasible EOQ; otherwise retain the bracket's lowest qualifying quantity.
  3. Compare full annual cost for every feasible candidate.

TAC(Q) = DC + DS/Q + iCQ/2

Reject a Q that does not qualify for its assumed price. Purchase cost and price-based holding cost both change across brackets.

Single-period newsvendor

Use only for one selling opportunity with defined underage/overage consequences—not normal carry-over or routine backorders.

Cᵤ = selling price − purchase cost
Cₒ = purchase cost − salvage value
critical fractile = Cᵤ/(Cᵤ+Cₒ)
choose first demand Q with F(Q) ≥ fractile

Time-varying lot sizing

Iₜ = Iₜ₋₁ + Qₜ − Dₜ
Qₜ ≤ capacityₜ × yₜ; yₜ ∈ {0,1}

The balance preserves flow. Binary yₜ activates the fixed setup cost and blocks positive quantity when no setup is released. Audit every period, non-negativity and the final position.

Installation stock is one location’s own inventory. Echelon stock includes that location and the downstream inventory it supports. Circle what each control point counts before assigning demand and lead-time exposure; otherwise the same protection can be treated as unrelated buffers.

SignalBoundary check
Price breakBracket feasibility + all cost components
Short-life itemCu/Co defined from the case
Seasonal demandPeriod balance; do not force EOQ
Several stagesInstallation vs echelon stock
warehouseregion Aregion BR1R2R3R4
Echelon stock at an upstream node includes the downstream inventory it supports.

5 · Aggregate Planning + S&OPCh 4 · final emphasis

Translate medium-term demand into production, workforce, overtime, subcontracting, inventory and backlog decisions. The model supplies trade-offs; S&OP reconciles demand, operations and finance and approves one feasible plan.

no-backlog material balanceending inventoryₜ = beginning inventoryₜ + regularₜ + overtimeₜ + subcontractₜ − demandₜ
beginning inventoryₜ₊₁ = ending inventoryₜ

PolicyAdjustmentWhat to expose
LevelStable capacity/workforce; inventory or backlog absorbs variationHolding, backlog, service and final stock
ChaseCapacity/workforce tracks demandHiring, firing, disruption and capacity
HybridSpreads response across leversEvery limit and category cost

Build → audit → recommend

  1. Separate forecast, capacities, costs and opening conditions from decisions.
  2. Reconcile each period before calculating cost. Keep one sign convention for inventory/backlog.
  3. Check regular/overtime/subcontract limits, non-negativity and final-balance requirement.
  4. Recompute every cost category from displayed quantities; compare plans on the same horizon, opening position, service rules and cost basis.
  5. Explain the operating pattern; test demand, capacity or cost sensitivity; state a reversal condition.
Exam A smaller total is not enough if one plan quietly permits backlog, omits a cost, or violates service/labour/supplier limits.
>demandplancapacity +inventorycost +serviceS&OP feedback
Demand commitments loop back when capacity, inventory, cost or service evidence is infeasible.
Trap → fix A Solver screenshot alone proves neither feasibility nor recommendation. Separate inputs and opening conditions from decisions; show each period balance and capacity rule; trace every objective term to displayed quantities; add scenario logic and state the operating consequence.

6 · Facility + Distribution DesignCh 5–6 · final emphasis

Fixed-charge facility model

minimise ΣᵢFᵢyᵢ + ΣᵢΣⱼcᵢⱼxᵢⱼ
serve each zone: Σᵢxᵢⱼ = dⱼ
open/capacity link: Σⱼxᵢⱼ ≤ Capᵢyᵢ
xᵢⱼ ≥ 0; yᵢ ∈ {0,1}

Fixed cost rewards consolidation; transport, handling and service may reward proximity. Verify each destination separately—a correct network total can hide one short zone and one oversupplied zone. Report opened sites, flows, utilisation and cost; test demand growth, cost change, capacity loss and service constraints.

plant Nplant Sopen DCclosedzone 1zone 2zone 3
Binary links must make positive flow through a closed site impossible.

Location estimate + channel choice

centre of gravity: x̄ = Σxⱼwⱼ/Σwⱼ · ȳ = Σyⱼwⱼ/Σwⱼ

This generates a candidate, not a decision: test discrete sites, road access, capacity, fixed cost, risk and response requirements. For distribution, compare inventory aggregation, facility expense, transport, response time, assortment, customer effort, returns and scalability.

StructureTrade-off
Direct / central parcelPooling and less duplication; longer individual transport
Local storage/deliveryFast response; fragmented stock and route economics
Pickup / storesConsolidated last mile; customer effort/local presence
HybridValid only with explicit product/customer routing rules
customer promisehome deliverypickuplocalparcelpointstore
Start with the customer promise, then choose the operating structure and test its reversal condition.
Trap → fix Do not stop at base-case cost. Pilot first; update route density, participation, failure rates and customer-response assumptions. State which product/customer segment uses each hybrid channel and why.
asksia.ai/cheatsheet/usyd-itls6002 · Full ITLS6002 study guide →
Forward this to your tutorial group · Shared by
ITLS6002v2 · 2026-10-16 · side 1/2
Your exam allows one A4 sheet of notes, both sides. Check on the LMS whether printed notes are accepted; if they must be handwritten, copy it.
Semester 2 formal examination period, from 16 November 2026 (the Exams Office publishes the exact date).
ITLS6002
Worked Drills · Traps · Fast Recall
Supply Chain Planning and Design · calculations carried to the decision
ITLS6002 cheatsheet QR code – open the full ITLS6002 study guide
Full guide + ask Sia
about ITLS6002
SIDE 2/2   5 worked drills · audit loops · traps · formula recallshow working → concludeuse the guide values · never hide infeasibility

7 · Drill 1 — EOQ + ROPCh 1 worked · 8 marks

Given: D=9,600 units/year; S=$75/order; H=$6/unit-year; L=3 weeks; 48 operating weeks/year.

StepWorkingResult
1 · lot size√(2×9,600×75/6)489.90 units
2 · feasibleround to a workable quantity490 units
3 · demand basis9,600/48200 units/week
4 · trigger200×3600 units

Decision: order about 490 units whenever inventory position reaches 600 units. The first number is how much; the second is when. At unconstrained EOQ, annual ordering and holding costs should be approximately balanced.

Trap Do not use 600 as the replenishment quantity or 490 as the trigger. A longer certain L moves the trigger but not basic EOQ.

ROP=600+490IP falls at 200/week
Worked policy: replenish 490; release when inventory position reaches 600.

7b · Feasible-Quantity CheckCh 1 decision check

For D=9,600, S=$150, C=$40 and i=25%: H=$10 and unconstrained EOQ=536.66. With cartons of 60, compare 480, 540 and 600 on annual ordering + holding cost. 540 has the smallest displayed relevant total; keep ROP as a separate timing decision.

Candidate ruleKeep?
Neighbouring feasible multiplesYes—same annual basis
Mechanically rounded integerNo if cartons constrain
Purchase costOnly if price varies

7c · EOQ Answer AuditCh 1 FAQ

Line to showError prevented
H=iC in $/unit-yearUnconverted carrying rate
D and H annualWeeks-versus-years error
IP beside ROPDuplicate order in transit

If price varies, restore purchase cost. Name any broken basic-model assumption.

8 · Drill 2 — ProtectionCh 2 worked · 8 marks

Given: weekly μ=120, σ=24 units; L=2 weeks; review R=3 weeks; z=1.645.

PolicyExposure + deviationProtection result
ContinuousT=2; 24√2=33.94SS=1.645×33.94=55.83
Continuous ROP120×2+55.83295.83 ≈ 296
PeriodicT=3+2=5; 24√5=53.67larger exposure
Order-up-to120×5+1.645×53.67688.28 ≈ 688

Decision: use ROP≈296 under continuous review, or target S≈688 at the three-week review. Periodic order quantity is 688−IP, not 688 automatically.

>continuousL=2 weeksperiodicR=3L=2protect R+L=5 weeks
The drawing decides the mean and σ term before arithmetic begins.

Checks Units → exposure → mean → deviation → z → SS → trigger/target → carrying cost. If demand is seasonal or correlated, do not scale one-period σ automatically.

8b · Service-Language TrapCh 2 clinic

PhraseModel meaning
Finish cycle without stockoutCycle service probability; z quantile
Demand supplied immediatelyFill rate; expected shortage
“Better service”Undefined until metric is named

Report both the service gain and annual carrying-cost consequence. More protection is not free.

8c · Sensitivity NarrativeCh 2 FAQ

R↑ raises periodic mean and variability exposure; z↑ raises only protection; σ↑ raises safety stock; μ↑ raises expected exposure. Continuous ROP is unchanged by R.

Before √TConfirm
PatternIndependent, identically distributed period demand
Unitsμ, σ, R and L use one time basis

9 · Drill 3 — Aggregate PlanCh 4 worked · 8 marks

Given: demand=900, 1,100, 1,300; beginning inventory=200; regular production=1,050 each period; ending inventory cost=$4/unit-period.

PeriodBalanceEnding ICost
1200+1,050−900350$1,400
2350+1,050−1,100300$1,200
3300+1,050−1,30050$200
Total ending-inventory cost700 unit-periods$2,800

Decision: the level plan is flow-feasible, finishes with 50 units and incurs $2,800 stated inventory cost before production/workforce costs. Each ending balance becomes the next opening balance.

Exam Numerical feasibility comes before the managerial recommendation. Confirm final position and capacity; then compare relevant categories on the same assumptions.

$224k$248k$211kchaselevelmixed
Source comparison: mixed is lowest at $211,000 only under the same demand, constraints and final requirement.

9b · Plan-Audit GridCh 4 FAQ

AuditQuestion to answer
Row balanceDoes opening + every supply source − demand reconcile?
CapacityAre regular, overtime and subcontract limits obeyed?
SignAre inventory and backlog conventions consistent?
HorizonDoes opening supply reconcile to demand + closing position?
ObjectiveCan each cost component be recomputed independently?
RecommendationWhich operational risk can justify a higher-cost hybrid?

9c · Compare Like with LikeCh 4 evidence

Chase=$224,000, level=$248,000 and mixed=$211,000 only under the same demand, limits and final-stock rule. Mixed wins this case, not every case.

Report beside totalMeaning
Inventory/backlog + capacity profileWhere service and disruption sit
Changed-case resultWhether the choice survives

10 · Drill 4 — Facility ChoiceCh 5 worked · 8 marks

Given: Site A fixed=$120,000, variable=$7/unit; Site B fixed=$180,000, variable=$4/unit; D=25,000 units. Both have sufficient capacity.

StepWorkingAnswer
A cost120,000+7×25,000$295,000
B cost180,000+4×25,000$280,000
Break-even120,000+7D = 180,000+4DD=20,000
Saving at forecast295,000−280,000$15,000

Decision: choose B at 25,000; A is cheaper below 20,000 under the stated assumptions. State the volume range because the recommendation changes at the threshold. Recheck capacity and service.

D=20,000A: 120k+7DB: 180k+4D
Break-even is the recommendation boundary; above 20,000 the lower variable-cost site wins.

10b · Fixed-Charge AuditCh 5 model

TestEvidence to show
DemandOne conservation rule per zone
Open linky=0 forces all linked x=0
Capacityassigned flow ≤ available capacity
Fixed costcharged once per selected site
Utilisationflow/capacity and spare capacity
Stress testdemand growth, capacity loss, costs, service

Two close-cost networks can differ sharply in resilience. A base-case optimum is not automatically implementable.

>supplyopen sitezone dflow ≤ capacity×yserve each zone exactly
Read each algebraic constraint aloud as a physical network rule.

10c · Recommendation Stress TestCh 5 FAQ

Change demand, cost, capacity loss or service; then compare sites, flows, utilisation and cost. A small base saving may conceal disruption exposure.

OutcomeInterpretation
Flow shifts; sites stayAllocation/capacity is the margin
Site set changesName the reversal threshold

11 · Drill 5 — Last MileCh 6 worked · 8 marks

Given: local delivery route=$360/day+$3/stop; parcel carrier=$15/order; one order per stop; sufficient route capacity.

StepWorking
Local cost360+3N
Parcel cost15N
Equalise360+3N=15N → 12N=360
ThresholdN=30 orders/day

Decision: above 30 daily orders the local route has lower stated cost; below 30 the parcel carrier does. Add capacity, geography and service-quality checks.

customer promisehome deliverypickup/storedensity + serviceeffort + returns
Channel selection begins with the customer promise, then tests cost, density, service and reverse flow.
CriterionCentral/directLocal/store
Inventoryaggregation; less duplicationfragmented; faster availability
Transportindividual longer parcelsroute density matters
Responsegenerally slowerfaster if stocked
Returnscollection/inspection flowlocal consolidation possible
pickuplocal routecentralstoresfacility cost →faster ↑
No network wins every dimension: response, facilities, inventory and transport move together.

Trap A hybrid is defensible only when the routing rule by product/customer is explicit and the information system can support it.

11b · Segment the ChannelCh 6 application

SignalDesign pressure
Slow mover / varied rangeCentralise for pooling
Urgent / high volumePosition nearer demand
High stop densityLocal route gains
High returnsDesign reverse flow too

Monitor density, participation, failure, response and return cost; name the switch value.

12 · Model Chooser + Trapsall chapters · final recall

If the case changes…First place affectedExpected direction/check
Ordering cost S ↑EOQQ* rises; ROP unchanged if d,L unchanged
Certain lead time L ↑ROPTrigger rises; EOQ unchanged
Review interval R ↑Periodic SMean and variability exposure rise
Salvage value ↑CoCo falls; fractile and percentile rise
Facility fixed cost ↑site choiceConsolidation pressure rises
Demand/capacity shockbalances + linksRe-solve; inspect utilisation

High-frequency failure modes

  • Using on-hand stock rather than inventory position for ROP.
  • Combining raw deviations or mixing weeks with years.
  • Calling cycle service and fill rate the same measure.
  • Accepting an EOQ outside its price bracket or omitting discount purchase cost.
  • Allowing flow when its setup/opening binary is zero.
  • Ranking plans with different backlog, horizon or final rules.
  • Giving a network winner without a reversal condition.
>recommend+ boundaryinputslimitsoutputsstress
Every final answer closes the loop: verified inputs and constraints → outputs → sensitivity → conditional recommendation.

13 · Two-Sentence Finishreporting rule

Sentence 1: choose the option, give its quantities/flows/cost and comparator. Sentence 2: state the operating reason and reversal condition.

Before submittingTick
Units/time basis shown□
Balances/constraints reconciled□
Feasible candidate selected□
Service/resilience interpreted□
Reversal condition stated□
Exam Model → check → interpret → recommend.
asksia.ai/cheatsheet/usyd-itls6002 · Full ITLS6002 study guide →
Forward this to your tutorial group · Shared by
ITLS6002v2 · 2026-10-16 · side 2/2
Your exam allows one A4 sheet of notes, both sides. Check on the LMS whether printed notes are accepted; if they must be handwritten, copy it.
Semester 2 formal examination period, from 16 November 2026 (the Exams Office publishes the exact date).

Want one for YOUR exact syllabus?

Sia is your free desktop study agent. Drop your University of Sydney ITLS6002 slides — Sia builds a sheet tailored to YOUR exam. Better than this library because it knows YOUR materials.

↓ Download Sia · Free