GPA Guarantee: Score A+ under Finals

Lecture Transcription |LMS sync |Live Tutor Q&A
50% OFFAll plan

FNCE10002 Cheatsheet · Principles of Finance

University of Melbourne · Cheatsheet for the final exam. Semester 2 examination period, 2–20 November 2026. Full FNCE10002 study guide →

A4 landscape · two-side revision sheet · 6 columns per sideFNCE10002 · Semester 2, 2026
FNCE10002
Principles of Finance
Faculty of Business and Economics · The University of Melbourne · EXAM REVISION SHEET · Semester 2, 2026
FNCE10002 cheatsheet QR code – open the full FNCE10002 study guide
Full guide + ask Sia about FNCE10002
SIDE 1/2   WHAT THE FINAL REWARDS · definitions → formula → decision rule → assumption check EXAM REVISION SHEET Final Examination · 60% · 120 minutes · in person

1 · Exam map COURSE.JSON · BRIEF

15%25%FINAL 60%
AssessmentWeight / format
Four peer-reviewed tasks15%; three highest of four count
Mid-semester Examination25%; 60-minute in-person MCQ
Final Examination60%; 120-minute in-person examination

Permitted materials: not confirmed for this offering in the course materials we hold — check the exam instructions on the LMS.

Source: Semester 2, 2026 course and assessment materials held; operational instructions remain authoritative.

2 · Universal finance method ALL CHAPTERS

Finance answer workflow1 DATEcash flows2 MATCHrate / period3 VALUEshow steps4 JUDGElimits
Guide-wide route: common date → matched units → calculation → conditional decision.
If asked to…Lead with…Finish with…
move one cash flowPV / FVvaluation date
price promised cash flowsdiscount each flowyield + risk assumptions
value equityexpected dividendsgrowth/return sensitivity
rank projectsincremental NPVmatched project risk
draw optionspayoff firstpremium → profit

Exam cue A calculator output is not a method. Make variables, units, signs, denominator and comparison reconstructable.

3 · Time value of money CH 1

Time value of money: cash at different dates has different value because of opportunity cost and risk. FV compounds a present amount forward; PV discounts a future amount to its current equivalent.

Single-sum valuePV = FV ÷ (1 + r)ⁿ
FV = PV × (1 + r)ⁿ
SymbolMeaningCheck
PV / FVvalue at stated datecurrency + date
rrate per perioddecimal; same unit
nnumber of periodsmatches r and flows

Controlling limit: rate, period count and cash-flow frequency must use the same time unit. Predict direction: positive r makes PV below FV for a positive future receipt.

4 · Annuities, loans, bonds CH 2

Annuity = finite sequence of equal cash flows at regular intervals. Amortisation allocates each payment between interest and principal. Bond yield is the rate equating promised cash flows with current price under stated assumptions.

Bond cash-flow layerst=0CCC+FDISCOUNT EACH FLOWat matched yield y
Redrawn guide figure: coupons recur; face value arrives with the final coupon.
Coupon-bond priceP = Σⁿₜ₌₁ C ÷ (1 + y)ᵗ + F ÷ (1 + y)ⁿ
ObjectSetupWhat can break
Annuityequal amount + regular intervaltiming/frequency mismatch
Loanpayment = interest + principalconfusing balance with payment
Bondcoupon stream + face valuequoted yield convention

Bond decision language

  • Write the actual dated cash flows before naming premium or discount.
  • If coupon rate is below required yield, the worked guide case prices below face value.
  • Price is conditional on promised cash flows and the yield; default and reinvestment risk remain.

Exam cue Convert quoted yields and payment frequency consistently. Never discount a semiannual or monthly flow with an unconverted annual rate.

5 · Debt checklist CH 2 FAQ

TranslateList every coupon and maturity principal on one timeline.
CalculateDiscount each flow using yield per matching period.
InterpretCompare computed price with face value; state assumptions.
StressChange yield or timing; ask whether the price label reverses.
Loan scheduleSplit each payment between interest and principal; track the remaining balance.
Direction checkPredict the result before arithmetic; test a limiting case or independent calculation.
BoundaryConvert quoted yield and payment frequency consistently; default and reinvestment risk remain.

Remember: the promised coupon is not the required yield. The yield is the discount rate that reconciles price and the full cash-flow stream.

6 · Equity valuation CH 3

Ordinary share = residual ownership claim with uncertain distributions and terminal value. The dividend discount model values equity as the PV of expected future dividends. Market information changes expectations and prices with varying speed and quality.

Dividend valuation decision treeExpected dividendsconstant g?use D₁/(r−g)assumption shifts?stress P₀
Redrawn guide figure: dividend inputs lead to a conditional value, not a certainty.
Constant-growth equityP₀ = D₁ ÷ (r − g)   only when r > g
InputMeaning / directionTrap
D₁next-period dividend; ↑ raises P₀using current dividend
rrequired return; ↑ lowers P₀calling it realised return
gsustainable growth; ↑ raises P₀allowing g ≥ r
r−gassumption gapsmall gap makes value sensitive

Controlling limit: a small change in long-run growth or required return can dominate the estimate. Report the assumptions with the value; do not present a point estimate as unconditional.

Market-information judgement

Information matters through expected dividends, growth and required return. When a fact changes, identify which input moves, predict the direction of price, then recalculate only the affected lines.

Exam cue “P₀ = $X, conditional on D₁, sustainable g, required r and r > g.” This closes both the arithmetic and the interpretation.

7 · Valuation comparison CH 1–3

ClaimCash flowKey uncertainty
Single sumone dated FVrate / horizon
Bondcoupons + faceyield, default, reinvestment
Ordinary shareexpected dividendsgrowth + required return
Constant-growth shareexpected D₁ and perpetual ga narrow r−g gap amplifies sensitivity
Information shockrevise affected D₁, g or rpredict direction, then recalculate

Across all three, value at one date is the organising idea. Timing and risk belong in the setup, not as an afterthought.

8 · Risk, return, diversification CH 4

Expected return = probability-weighted average of possible returns. Variance = expected squared deviation from the mean. Covariance = how two security returns move together. Diversification is therefore about co-movement, not merely the number of securities.

Portfolio return and risk inputsweightsΣw=1componentreturnsco-movementcovariancereturn = weightedrisk needs covariance
Redrawn guide figure: expected return is linear; risk also needs co-movement.
Portfolio expected returnE(Rₚ) = Σᵢ wᵢE(Rᵢ), with Σᵢwᵢ = 1
QuestionRequired informationSafe conclusion
Expected return?weights + component expected returnsweighted average
Portfolio risk?volatilities + covariance/correlationnot a weighted average
Diversification?pattern of co-movementdepends on covariance

Boundary checks

  • Weights should sum to one for the stated portfolio.
  • Expected return should lie consistently with the weights and component returns in the guide's long-only example.
  • Do not infer variance from expected return alone.
  • Historical estimates may not represent future distributions or extreme dependence.

Exam cue State the missing information. “10.4% expected return” does not answer a risk question without volatilities and co-movement.

9 · Risk vocabulary CH 4–5

Total uncertaintyReturn distribution, not merely its mean.
Diversifiable componentReduced through combining assets whose returns do not move identically.
Systematic riskMarket-related risk remaining after broad diversification.
BetaSensitivity to market-return movements under the fitted model.

Sequence: describe expected return → quantify co-movement → identify what diversification removes → price remaining systematic exposure with CAPM.

10 · CAPM and asset pricing CH 5

Systematic risk is market-related risk remaining after broad diversification. Beta measures an asset return's sensitivity to market-return movements under the fitted model. CAPM links required return to the risk-free return and beta-scaled market premium.

CAPM constructionR_fbaseβ × premiumsystematic riskE(Rᵢ)required return+=
Redrawn guide figure: CAPM adds a beta-scaled market premium to the risk-free rate.
Capital asset pricing modelE(Rᵢ) = R_f + βᵢ[E(Rₘ) − R_f]
LineOperationInterpretation
1E(Rₘ) − R_fmarket premium
2βᵢ × premiumcompensation for exposure
3+ R_fmodel-required return

Labels matter: expected, required and realised return are different. A CAPM output is a model-based opportunity cost for stated systematic exposure, not a guaranteed forecast.

Limit: beta and the market premium are estimates, and CAPM omits other possible priced risks. When beta or the premium changes, predict the direction before calculating.

11 · Capital budgeting + WACC CH 6

Incremental cash flow changes because the project is undertaken. NPV is PV of those project cash flows less the initial investment. WACC is the market-value weighted required return on debt and equity under stated tax and risk conditions.

NPV decision inputsNPV decisionincremental CFmatched WACC
Redrawn guide figure: NPV combines only incremental flows with a risk-matched rate.
Net present valueNPV = −I₀ + Σⁿₜ₌₁ CFₜ ÷ (1 + r)ᵗ
NPVDecision within assumptionsWhat to say
> 0adds value at stated raccept if risk/flows fit
= 0boundaryinspect assumptions
< 0does not meet stated rreject within setup

Exam cue Corporate WACC or financing weights may be inappropriate for a project with different risk. Near-zero NPV calls for sensitivity analysis, not false precision.

12 · Leverage + payout CH 7

Financial leverage uses fixed-claim financing and changes risk and return borne by equity holders. Capital structure is the debt/equity/other financing mix. Payout policy chooses dividends, repurchases and retention.

Leverage judgement ladderspreadriskdistresstaxagencyflexibilityconditionalfinancingdecision
Redrawn guide figure: a positive spread is only the first step in a leverage judgement.
Levered equity return relationR_E = R_A + (R_A − R_D)(D ÷ E)
ObservationValid inferenceInvalid shortcut
R_A > R_D in expectationleverage can raise expected R_E“value must rise”
more fixed claimsequity distribution is magnifiedonly the mean rises
higher EPS mechanicallyrecheck risk and financing effectshigher firm value proven

Carry default, taxes, agency effects and financial flexibility into the conclusion. Payout also trades current distribution against retained investment needs; the accounting label alone does not settle value.

13 · Options + basic hedging CH 8

Call = right, not obligation, to buy at strike K by/at expiry. Put = right, not obligation, to sell. Payoff is contract value at exercise before premium or costs.

Option decision treeoption positioncall / putrightpayoffmax(·,0)profit± premium
Redrawn from options-and-basic-risk-management--fig1: position → payoff → profit.
Expiry payoffsC_T = max(S_T − K, 0)
P_T = max(K − S_T, 0)
PositionPayoff stepProfit step
Long callmax(S_T−K,0)subtract premium
Long putmax(K−S_T,0)subtract premium

14 · Final answer audit GUIDE STRATEGY

TranslationDates, signs, units, observed vs derived values.
CalculationFormula named; substitutions visible; magnitude plausible.
InterpretationDecision answers the question and names assumptions.
Counter-caseIdentify the input or limit that could reverse it.
asksia.ai/cheatsheet/unimelb-fnce10002 · Full FNCE10002 study guide →
Forward this to your tutorial group
AskSiaShared by ________
v2 · 2026-10-25 · Semester 2 examination period, 2–20 November 2026.
Check your exam instructions on the LMS for what you may bring; use this sheet to revise and self-test.
FNCE10002
Principles of Finance · Self-test drills
Faculty of Business and Economics · The University of Melbourne · EXAM REVISION SHEET · Semester 2, 2026
FNCE10002 cheatsheet QR code – open the full FNCE10002 study guide
Full guide + ask Sia about FNCE10002
SIDE 2/2   FIVE WORKED DRILLS · judgement cards · classic traps · exam-morning plan SELF-TEST: COVER THE ANSWER Inputs → formula → arithmetic → interpretation → counter-case

15 · Method chooser TOPIC MAPS

Method chooserdated valuesecuritypricerequiredreturnproject /optionmethod
Redrawn from front--fig1: classify the unknown before choosing the formula.
If you see…Do thisMust say
one future paymentPV = FV/(1+r)ⁿvaluation date
coupons + face valuediscount every flowyield period matched
D₁, r and gD₁/(r−g)r>g; sensitivity
weights + expected returnsΣwE(R)risk needs covariance
R_f, E(Rₘ), βCAPMrequired, not guaranteed
project cash flowsincremental NPVrisk-matched rate
S_T, K, premiumpayoff then profitsubtract premium

16 · “If X → Y” cards CH 1–8 FAQ

Units conflictStop; convert rate, periods and cash-flow frequency.
Calculator-only answerExpose formula, substitution, units and decision.
Point value givenStress the assumption most able to reverse it.
Near-zero NPVInspect cash-flow and rate assumptions.
Higher EPSDo not infer higher firm value.
Option diagramMark K; draw payoff; then account for premium.

Self-test Cover the right column. Explain the mechanism aloud, not just the named formula.

17 · Retrieval loop PRACTICE FIG 13

Retrieval loopretrievetransfercounter-caserevise
Redrawn guide figure: retrieve → transfer → counter-case → revise.

Record the first failed move: translation, calculation or interpretation. Repair that line before attempting another changed case.

TranslationRemap cash flows, symbols, dates and units.
CalculationRewrite the first divergent line; use a limiting case or independent check.
InterpretationAnswer the decision asked and attach the controlling limitation.

18 · Drill 1 · single payment CH 1 WORKED

Q [3]. $5,000 is due in three years; annual discount rate = 6%. Find PV.

Single payment timelinet=0123FV = $5,000discount at 6%
Guide timeline: one future receipt moves back three matching annual periods.
  1. Map: FV = 5,000; r = 0.06 per year; n = 3; valuation date t=0.
  2. Formula: PV = 5,000 ÷ (1.06)³.
  3. Arithmetic: PV = $4,198.10.
  4. Interpret: current equivalent at year 0, assuming annual compounding and a constant 6% rate.
Answer path5,000 ÷ 1.191016 = 4,198.10
TrapRepair
multiply instead of discountPV of positive FV must be lower when r>0
6 instead of 0.06convert percentage to decimal
no date on answerwrite “at year 0”

Changed case If r rises with FV and n fixed, denominator rises and PV falls. Explain before recalculating.

19 · Drill 2 · coupon bond CH 2 WORKED

Q [3]. Two-year bond: $50 annual coupon; $1,000 face paid at maturity; required yield 6% annually. Find price.

Bond worked cash flows0: price1: $502: $1,050discount both at 6% p.a.
Guide bond drill: separate the first coupon from coupon plus face value at maturity.
  1. Cash flows: $50 at t=1; $1,050 at t=2.
  2. P = 50/1.06 + 1,050/(1.06)².
  3. P = 47.17 + 934.50 = $981.67.
  4. Coupon rate is below required yield, so price is below $1,000 face value under the assumptions.
CheckQuestion
CompletenessDid maturity include both coupon and principal?
FrequencyDo yield and coupon periods match?
LanguageDid price come before “discount to par”?
LimitsDid you retain default and reinvestment risk?

20 · Drill 3 · constant growth CH 3 WORKED

Q [4]. Expected dividend next year D₁ = $2.10; perpetual growth g = 3%; required return r = 9%. Estimate value.

Constant growth input funnelD₁ = 2.10r = 9%g = 3%P₀ = 2.10/(.09−.03)= $35
Guide valuation funnel: D₁ enters the numerator; r−g is the assumption gap.
  1. Timing: confirm the stated dividend is next-period D₁.
  2. Validity: 9% > 3%, so r > g.
  3. Compute: 2.10 ÷ (0.09−0.03) = 2.10 ÷ 0.06 = $35.
  4. Qualify: conditional on perpetual 3% growth and 9% required return.
ChangeImmediate directionWhy
D₁ ↑P₀ ↑larger numerator
r ↑P₀ ↓wider denominator
g ↑, still <rP₀ ↑narrower denominator
g ≥ rmodel invalid hererequired condition fails

Classic trap Do not use a current dividend as D₁ unless it is first moved to the next period under the stated growth assumption.

21 · Equity judgement cards CH 3 FAQ

Price movesName the channel: expected dividends, growth or required return.
Estimate looks hugeInspect the width of r−g; small gaps amplify sensitivity.
Market information arrivesRevise the affected input, predict direction, then recompute.
One value reportedAdd its assumptions and the input most able to reverse it.

22 · Fast valuation contrasts CH 1–3

Valuation contrastssingle FVbondpromised flowsshareexpected flows
Redrawn from front--fig1: all use PV, but the cash-flow claim differs.

For any valuation, circle the date of the answer, underline the rate per period, and box the cash flows that are assumptions rather than observed amounts.

23 · Drill 4 · portfolio return CH 4 WORKED

Q [3]. Portfolio: 60% in an asset with E(R)=8%; 40% in one with E(R)=14%. Find E(Rₚ); explain why risk needs more information.

Portfolio return and risk routeweightsΣw=1expectedreturnvariance +covarianceportfoliodecision
Redrawn from risk-return-and-diversification--fig1: return then co-movement.
  1. Check weights: 0.60 + 0.40 = 1.
  2. Contributions: 0.60×8% = 4.8%; 0.40×14% = 5.6%.
  3. E(Rₚ) = 4.8% + 5.6% = 10.4%.
  4. Risk cannot be inferred: it also requires volatilities and covariance or correlation.
StatementVerdict
“Return is the weighted average.”Yes, for expected return here.
“Risk is the weighted average.”No; co-movement is missing.
“More securities always settles risk.”No; dependence matters.
“Historical covariance is certain.”No; future/extreme dependence may differ.

24 · CAPM rapid check CH 5 WORKED

Given: R_f=3%, E(Rₘ)=9%, β=1.2. Market premium = 6%; beta-scaled premium = 7.2%; CAPM required return = 10.2%.

CAPM concept routesystematicriskbetaCAPMformularequiredreturn
Redrawn from capm-and-asset-pricing--fig1: systematic risk → beta → CAPM.
If β risesRequired return rises when the market premium is positive.
If β=0The formula returns R_f.
After calculationSay “model-based opportunity cost”, not guaranteed realised return.
Stress testBeta and market premium are estimates; CAPM may omit other priced risks.
Label disciplineKeep expected, required and realised return as three different claims.
Market premiumCompute E(Rₘ)−R_f first; scale that premium by β before adding R_f.
Risk scopeβ is fitted sensitivity to market-return movements; it is not total uncertainty.
InterpretReport opportunity cost, not a guaranteed forecast.

25 · Drill 5 · compare projects COURSE WORKED

Q [5]. Both projects cost $10,000 now. A pays $6,000 at years 1 and 2. B pays $13,000 at year 2. At 8% annually, compare NPVs and state the boundary.

Project cash-flow comparisonAB012−10,000+6,000+6,000−10,000+13,0008% p.a.
Guide project comparison: same t=0 cost; timing differs, so discount each dated flow.
  1. A: −10,000 + 6,000/1.08 + 6,000/(1.08)² = $699.59.
  2. B: −10,000 + 13,000/(1.08)² = $1,145.40.
  3. Rank: B has the higher NPV at the same 8% opportunity cost.
  4. Boundary: recommendation assumes equal risk and scale; changed timing risk or discount rate may alter it.
Project questionRequired move
Cash flow relevant?Include only if it changes because the project proceeds.
Different dates?Move all flows to the same valuation date.
Mutually exclusive?Compare NPVs on the same scale and assumptions.
Close to zero?Stress cash-flow and rate estimates.
Different project risk?Do not apply an unmatched corporate WACC mechanically.

Accuracy check The displayed NPVs are recomputed directly from the supplied cash flows and 8% rate.

26 · NPV sign + sensitivity CH 6 FAQ

NPV and WACC relationshipincremental CF→ NPV signmatched WACC→ conditional
Redrawn from capital-budgeting-and-wacc--fig2: NPV and matched WACC interact.

*“Accept” and “reject” remain conditional on incremental cash-flow estimates, project risk and the matched discount rate.

27 · Leverage judgement CH 7 WORKED

Wrong9%−5%=4%, therefore leverage certainly adds value.
RightThe spread is favourable in expectation; value depends on the full risk and financing effects.
Payout trapHigher EPS after a financing change does not prove higher firm value.

28 · Options self-test CH 8 WORKED

Guide case: call strike K=$50, premium=$4, expiry share price S_T=$62.

Long call payoff and profit$S_TK=50payoffprofit (−$4)BE=54
Guide call figure: profit is the payoff line shifted down by the $4 premium.
Compute in this orderPayoff = max(62−50,0) = $12
Profit = 12−4 = $8 per share
Break-even = 50+4 = $54
At expiryLong callLong put
S_T below Kpayoff 0payoff K−S_T
S_T equal Kpayoff 0payoff 0
S_T above Kpayoff S_T−Kpayoff 0
Profitlong payoff minus premium/costs

Draw without memorising

  1. Mark strike K on the horizontal S_T axis.
  2. Evaluate the max expression on each side of K.
  3. Join the two regions at the kink.
  4. For a short position, reverse the long payoff.
  5. For profit, account for premium; label break-even separately.

Hedge limit A hedge can introduce premium, basis and exercise-style effects. “Protected” is not the same as costless or risk-free.

29 · Classic traps wall ALL LIMITS

TrapCorrection
Mix annual rate with monthly/half-year flowsconvert to one period convention first
Use calculator output as reasoningshow formula, substitution and meaning
Treat yield as couponyield discounts the entire promised stream
Let g approach/exceed r silentlytest r>g and denominator sensitivity
Average risk by weightsinclude covariance/correlation information
Call CAPM return guaranteedlabel it model-required return

30 · Exam-morning plan PRACTICE FIG 14

Exam morning revision sequenceverifymechanismboundaryaction
Redrawn guide figure: verify → mechanism → boundary → action.
    asksia.ai/cheatsheet/unimelb-fnce10002 · Full FNCE10002 study guide →
    Forward this to your tutorial group
    AskSiaShared by ________
    v2 · 2026-10-25 · Semester 2 examination period, 2–20 November 2026.
    Check your exam instructions on the LMS for what you may bring; use this sheet to revise and self-test.

    Want one for YOUR exact syllabus?

    Sia is your free desktop study agent. Drop your University of Melbourne FNCE10002 slides — Sia builds a sheet tailored to YOUR exam. Better than this library because it knows YOUR materials.

    ↓ Download Sia · Free