about BISM1201
0 · Exam map course.json · brief
| Assessment | Weight | Format |
|---|---|---|
| Information Systems Analysis Report | 30% | Individual analysis report, due Week 6 |
| Excel Workbook | 30% | Workbook + tutorial participation/progress |
| Final Exam | 40% | Identity verified; in person; end-of-semester period |
Permitted materials: not confirmed for this offering in the course materials we hold — check the exam instructions on the LMS.
The final rewards a retrievable chain: define → apply to facts → show logic → control/consequence → evidence limit. Do not substitute a technology label for analysis.
1 · Diagnose the whole system C1 overview · FAQ
| Data | Recorded observations. |
|---|---|
| Information | Data organised with definition, timing and context for a purpose. |
| Decision | A choice using evidence, criteria and accountable action. |
| Boundary | People, activities, data and technologies included in the analysis. |
Decision-first chainsymptom → process cause → information need → capability → control → outcome measure
Information quality: accuracy, completeness, timeliness, consistency and relevant detail. Name the data owner: accountable for definition, quality, access and disputed values. Name an exception control for cases outside the normal path.
Boundary and quality audit
| Element | Question to answer |
|---|---|
| People | Who creates, corrects, approves and uses the record? |
| Process | What trigger, rules, hand-offs and exceptions transform the input? |
| Technology | What capability captures, stores, transfers or displays? |
2 · Value → strategy → system C2 overview · FAQ
Value testcapability → changed process → measurable outcome
Test benefit, implementation/operating cost, risk and trade-offs; do not double-count one effect.
| Pressure | Evidence signal | Question |
|---|---|---|
| Rivalry | Strong competitors; rapid imitation | What defensible difference or cost position? |
| New entrants | Lower entry barriers | What scale, relationship or coordination raises resistance? |
| Substitutes | Need solved another way | Why choose this value proposition? |
| Buyer power | Easy comparison/switching; concentrated demand | How improve fit, trust or switching value? |
| Supplier power | Few alternatives; costly switching; asymmetry | How improve visibility or coordination? |
| Response | Operational meaning | Fit check |
|---|---|---|
| Cost leadership | Lower sustainable cost structure | Not a one-off cut |
| Differentiation | Valued distinctiveness delivered consistently | Customer recognises value |
| Niche focus | Specific segment needs | Capability fits segment |
| Customer/supplier intimacy | Relationship knowledge + coordinated service | Trust/retention or partner coordination |
Coherence rule: evidence identifies the strongest pressure; strategy responds to it; capability changes the process; controls protect delivery; measures test the intended outcome. Include one plausible alternative and say what missing fact would reverse the choice.
Value-realisation ledger
| Write | Purpose |
|---|---|
| Baseline | Current outcome before the change; prevents ungrounded improvement claims. |
3 · Process before automation C3–4 FAQ · WEX
| Find | Evidence | Repair |
|---|---|---|
| Waiting | Queue between roles | Information/capacity at constraint |
| Rework | Reopened or corrected cases | Fix rule or source quality |
| Duplicate capture | Same fact re-entered | Capture once; reuse controlled record |
| Ambiguous gateway | Same case routed differently | Explicit test + owner |
| Bottleneck | Work accumulates; throughput constrained | Improve constraint, not merely upstream speed |
Process answertrigger → issue → cause → redesign → exception/control → end-to-end measure + balancing quality/risk measure
Redesign moves: remove work only if it adds neither customer value nor necessary control; simplify/standardise an ambiguous rule; automate a stable justified step; predict the next queue; add training, role clarity and feedback. Adoption is part of the system.
4 · Integrate the shared core C4 overview
| ERP | Internal resources/transactions: procurement, operations, inventory, finance. |
|---|---|
| CRM | Customer history/interactions: acquisition, sales, service, retention. |
| SCM | Demand, supply, inventory, partners and logistics across a value network. |
Standardise where common definitions, control or coordination create value. Preserve local variation where regulation, customers or operating conditions differ; connect only the information other processes need.
5 · Choose the development method C5 FAQ
| Condition | Predictive emphasis | Iterative emphasis |
|---|---|---|
| Requirements | Stable; baseline useful | Evolving/uncertain |
| Feedback | Formal stage validation | Frequent stakeholder evidence |
| Late change | Expensive; visible approval | Smaller increments lower learning cost |
| Risk/traceability | Formal approval/material controls | Expose uncertainty early |
| Best proof | Requirement traced to design, test, approval | Usable increment changes the backlog |
| Scrum element | Rule |
|---|---|
| Product owner | Accountable for product value, goal and backlog ordering. |
| Developers | Own delivery of the increment. |
| Scrum Master | Supports effective framework use and improvement; does not choose product value. |
| Acceptance criteria | Item-specific conditions. |
| Definition of done | Shared quality standard across increments: review, tests, security, documentation, readiness. |
Hybrid rule: baseline stable security, legal, identity, capacity or data requirements; iterate uncertain user workflow. Justify the combination by risk and learning, then include training, support, monitoring and operational ownership.
6 · Sustainable process evidence C6 overview
Indicator contractresource + formula + unit/denominator + process boundary + timing/period + source + owner + target/action
7 · Excel: structure → logic → audit C7 overview · WEX
| Question | Function/rule | Trap |
|---|---|---|
| Scale | SUM; COUNT/COUNTA | COUNT excludes text; define blanks |
| Centre | AVERAGE vs MEDIAN | Mean is pulled by extremes |
| Position | MIN, MAX, LARGE, SMALL, RANK | State which position answers the question |
| Choice | IF(test,true,false) | Order thresholds; final catch-all |
| All / any | AND / OR | Do not reverse policy words |
| Expected error | IFERROR | Do not hide every error as zero |
Reference ruleA1 moves row and column · $A$1 locks both · $A1 locks column · A$1 locks row
Predict the copied formula at all corners before trusting output.
Ticket-priority rule
8 · Lookup and report chooser C8 overview · FAQ
Lookup checkExact match: validate key type, spaces and uniqueness; show an explicit missing result. Approximate match: sort thresholds, draw each interval and test below, at and above every boundary. Clear the spill range; keep one maintained formula.
9 · ERD rules you can test C9 overview · FAQ
| Entity | Distinct concept with multiple identifiable instances and facts to store. |
|---|---|
| PK | Uniquely identifies each record; cannot be missing. |
| FK | References a related PK; makes the relationship operational. |
| Cardinality | How many related instances are allowed. |
| Modality | Whether participation is optional or mandatory. |
Normalise repeated facts into stable homes, preserving links through keys. Test for: update anomaly (same fact changed in many places), insertion anomaly (cannot store one fact without another), deletion anomaly (removing a row destroys a needed fact).
Relationship event questions: can the parent exist first; can the child move; may several links exist now or over time; and would deletion remove evidence that must be retained? These tests reveal modality, cardinality and history needs.
Exam cue State each relationship in both directions before drawing marks. Populate sample records; attempt invalid FK, duplicate link and deletion of needed history.
10 · BI + responsible AI C10 overview
Metric contractdefinition + formula + unit + period + source + refresh + owner + comparison/threshold + intended action
Process mining reconstructs actual paths from event logs. Verify case identifier, activity meaning and timestamp completeness before claiming delay, variants or rework. Difference from the designed process is evidence to investigate, not automatic failure.
| Responsible use | Operating control |
|---|---|
| Decision + boundary | State supported choice; document data limits |