Side 1 · rules + methods
Scheduled final · 40%
about FIT2001
01 · Exam mapCOURSE · BRIEF
| Component | Weight |
|---|---|
| Tutorial participation + pre-class activities | 16% |
| Assignment 1 / 2 / 3 | 7% / 23% / 14% |
| Scheduled final assessment | 40% |
Permitted materials: not confirmed for this offering in the course materials we hold — check the exam instructions on the LMS.
| Final-answer move | What earns the line |
|---|---|
| Define | Give the term its distinct analytical job. |
| Apply | Use named actors, conditions, rules and evidence from the case. |
| Connect | Show what the artefact supplies to the next artefact. |
| Qualify | Test an alternate, misuse, failure or change condition. |
| Conclude | State the justified decision in case language. |
Priority Earn marks by linking evidence → requirement/model → design choice → verification; lists without a changed conclusion are weak.
02 · Problem + boundaryC1
System boundary = explicit division between what the proposed system controls and what remains environment or external actor. Stakeholder = person, group or organisation affected by or able to affect the system and outcomes. Systems development = coordinated analysis, design, implementation and change work solving an organisational problem through an information system.
| Ask | Checkable answer |
|---|---|
| Who/why? | Affected actors, goals, conflicts |
| Where? | Inside/outside boundary; dependencies |
| Evidence? | Current process, causes, constraints |
| Success? | Measures independent of one interface |
Boundary audit
03 · Lifecycle choiceC2
Predictive lifecycle plans and baselines substantial scope before later construction and release. Iterative development uses repeated cycles to refine understanding and solution through feedback. Method fit aligns the approach with uncertainty, risk, governance, team and stakeholder conditions.
| If the case stresses… | Response |
|---|---|
| Stable scope, fixed compliance/interface | Baseline and staged controls |
| Unclear workflow, feedback need | Iterate with representative users |
| Both | Hybrid: control fixed risks; iterate uncertainty |
Compare consequences, not labels. Name what is baselined, what is iterated and which risk each choice controls.
Trap Calling a process agile does not remove governance, architecture or documentation needs.
04 · Elicit evidenceC3
Elicitation purposefully discovers needs, rules, constraints and disagreement through stakeholder and artefact evidence. A functional requirement states capability or behaviour under stated conditions; a non-functional requirement states a quality, constraint or operating condition such as security, performance, accessibility or reliability.
| Technique | Best evidence / risk |
|---|---|
| Interview | Goals, rationale / self-report |
| Observation | Actual steps, exceptions / observer effect |
| Documents + records | Rules, transactions / may be stale |
| Workshop | Conflict + agreement / power effects |
05 · Story ↔ activityC4
User story connects role, desired capability and value; acceptance criteria make satisfactory behaviour observable; an activity diagram exposes actions, decisions, concurrency and process flow. Each checks a different gap.
Given [state], when [event], then [observable result].
| Diagram mark | Meaning to state |
|---|---|
| Action / arrow | Work / control flow |
| Decision + guards | Mutually meaningful branch conditions |
| Fork / join | Concurrency begins / synchronises |
| Start / end | Process scope and termination |
Three-way consistency
| Story says… | Criteria must… | Activity must… |
|---|---|---|
| Role + value | Observe value-producing behaviour | Show that role's path |
| Capability | Set success and boundary conditions | Show actions and decisions |
| Exception implied | Name acceptable result | Expose alternate/recovery path |
Every criterion should map to an activity state, action or guarded outcome; every material branch should be covered or marked unresolved.
Trap A story card without conditions and alternate paths is not a complete specification.
06 · Use-case contractC5
Use case = goal-oriented actor–system interactions under stated preconditions. The main success scenario achieves the goal normally; an alternate flow is a valid deviation, exception or failure tied to a main-flow step.
| Write in this order | Marker checks |
|---|---|
| Actor, goal, trigger | Business goal, not screen task |
| Preconditions | True before interaction starts |
| Main steps | Actor intention ↔ system response |
| Alternates | Attach to exact numbered step |
07 · Domain model + rulesC6
Domain model represents important real-world classes, attributes, associations and multiplicities. Multiplicity constrains instance counts at an association end. A business rule constrains or derives behaviour, structure or decisions independently of screen layout.
| Question | Model move |
|---|---|
| Thing with identity? | Candidate class |
| One value owned by one instance? | Attribute on that class |
| Relationship has status/date? | Association class |
| How many can relate? | Multiplicity at both ends |
| What must never/always occur? | Explicit rule/constraint |
Model validation
Read each association both ways and test both end counts. A per-relationship value belongs on the relationship concept.
| Rule form | Model consequence |
|---|---|
| “Each X must have…” | Minimum multiplicity or required relation |
| “At most one active…” | Maximum/uniqueness constraint |
| “Status depends on…” | Derived value or decision rule |
| “Only role R may…” | Behaviour/access constraint |
Trap Copying screens or tables can omit real business meaning.
08 · Prototype to decideC7
Prototype = deliberately incomplete representation used to learn about requirements, interaction or feasibility. Design constraint limits acceptable choices. Feedback loop converts observation into a revised requirement or design decision.
| Uncertainty | Prototype focus |
|---|---|
| Language/process | Low fidelity; sequence + exceptions |
| Interaction | Task flow, feedback, recovery |
| Technical feasibility | Targeted executable spike |
| Before session | Name question, users, evidence, decision |
09 · HCI judgementC8
Usability asks whether specified users achieve goals effectively, efficiently and satisfactorily in context. Accessibility enables varied abilities and assistive technologies to perceive and operate. Interaction feedback communicates status, result, error and recovery.
| If you see… | Do / test |
|---|---|
| Invalid input | Specific nearby message; preserve valid work |
| Long operation | Status, progress, completion/failure |
| Keyboard/screen reader | Focus order, labels, announced errors |
| Destructive action | Prevent, confirm where needed, recover |
State the user, task and context; the success, error or recovery evidence; keyboard/assistive paths; and the decision that changes if evidence fails. Name the observation, not merely the intended interface feature. Tie each observation to a revision.
Trap Familiar visual style does not prove usability or accessibility.
10 · Realise the use caseC9
Use-case realisation describes collaborating objects/components performing a flow. A responsibility is a coherent obligation assigned without unrelated concerns. A sequence interaction orders messages to reason about control and data.
| Check | Why it bites |
|---|---|
| Start from preconditions + alternatives | Preserves requirements intent |
| Assign policy/state ownership | Avoids bloated controller |
11 · Security + test evidenceC10
Threat scenario names an actor, capability and action that could violate a protected property. A test oracle defines the expected outcome for judging observed behaviour. A traceability matrix maps requirements, design elements and verification evidence.
| Trace row | Required content |
|---|---|
| Need/risk | Stakeholder evidence or threat |
| Requirement | Observable protected behaviour |
| Design | Control/component responsibility |
| Verification | Case, oracle, result, residual risk |
Coverage follows risk. State misuse actor/capability, control, adversarial case, oracle and residual risk.
Trap Test count and code coverage do not prove important behaviour or threat resistance.
12 · Release + future changeC11
Deployment is controlled release into an operating environment. Maintenance includes corrective, adaptive, perfective and preventive change. Technical debt is future cost or constraint created by a current shortcut or deferred quality work.
| Plan before release | Evidence |
|---|---|
| Dependencies + migration | Reconciliation and interface checks |
| Pilot + rollback criteria | Named thresholds, not date alone |
| Monitoring + support owner | Signals, response and escalation |
| Deferred work | Debt, consequence, trigger, owner |
| Maintenance | Question |
|---|---|
| Corrective | What fault is repaired? |
| Adaptive | What environment or rule changed? |