GPA Guarantee: Score A+ under Finals

Lecture Transcription |LMS sync |Live Tutor Q&A
50% OFFAll plan

ACCT20001 Cheatsheet · Accounting for Management Decisions

University of Melbourne · Cheatsheet for the final exam. Semester 2 examination period, 2–20 November 2026. Full ACCT20001 study guide →

A4 landscape · ~7pt body · 6 columns · closed-book memory sheet2 sides · ACCT20001 · The University of Melbourne
ACCT
20001
Accounting for Management Decisions
The University of Melbourne · Semester 2, 2026 · Undergraduate level 2
Closed-Book Memory Sheet · Side 1 of 2 · what must be in your head
ACCT20001 cheatsheet QR code – open the full ACCT20001 study guide
Full guide + ask Sia about ACCT20001
End-of-semester examination 65%Mid-semester test 25%Ongoing assessment: weekly online quizze 10%
EXAM MAP   “It will be a digital, invigilated, closed-book exam, and hand-writing responses will not be feasible.” (ACCT20001 2026 S2 Lecture 1 slide; 2026 S2 subject guide says details to follow (PDF_2026_S2_Lecture_1_Student_Copy_pdf.txt))Final: 2½ hours · problem-solving · method + judgement

1 · The Four-Move Answercourse overview · FAQ

Recite before every calculationOBJECT → METHOD → UNITS → DECISION
Name the cost object; choose and name the method; compute in the units asked; recommend and defend.

Management accounting reports inward to a decision-maker. A technically correct number left without a choice is incomplete. Keep the cost object fixed: the same supervisor salary is direct to the factory but indirect to each unit.

NAME OBJECTphysically traceable?noyesworth tracing?noINDIRECT → allocateDIRECT
Source-derived tracing gate: a “no” to either feasibility question makes the item indirect. Ch 2 fig 1
Independent testQuestionResult
AssignmentTrace exact use?Direct / indirect
BehaviourTotal as volume changes?Variable / fixed
InventoryBring stock to present location/condition?Capitalise / expense

Locate before classifying

Value chain: research and development → design → production → marketing → distribution → customer service. Classify with a reason: freight inward is production; finished goods outward is distribution. Committed-product work is design; testing an unproven technology is research.

Product costUseBoundary
InventoriableStatementsPresent location/condition.
Direct + allocatedContractAgreed allocation rule.

2 · Cost Behaviour MemoryCh 2

VARIABLE TOTALVARIABLE / UNITFIXED TOTALFIXED / UNIT
Totals and per-unit amounts move in opposite patterns; claims hold only within the relevant range. Ch 2 fig 2

3 · Allocation: Pool → Rate → ObjectCh 3

Every allocation in the subjectRate = cost pool ÷ total quantity of base
Allocated to object = rate × base used by object
Per-unit charge = object's allocation ÷ its units

POOLshared driverRATEpool ÷ baseA 50%B 30%C 20%base share = pool share
Source-derived allocation shape: the denominator uses the base consumed by every object. Ch 3 fig 1
Response to indirect costUse when
Divide by unitsEvery unit is identical.
Allocate on a baseOutputs differ; a defensible base exists.
Do not allocateNo cause-and-effect story survives.

Choose the base: cause-and-effect is preferred; ability-to-bear (sales/profit) is weaker and can penalise success. Defend with causality, measurability, materiality and behavioural consequences. A driver causes cost; a base is what the system can measure.

4 · Actual vs Normal CostingCh 4

Actual rate = actual OH ÷ actual base
Predetermined rate = budgeted OH ÷ budgeted base
Applied OH = predetermined rate × actual base

ActualNormal
Rate knownPeriod endBefore period
Direct costsActualActual
OH appliedActual ratePredetermined rate
Trade-offAccurate, lateTimely, adjust later

Job record and cost flow

materialswork in processfinishedCOGSOH CONTROLactual in · applied outcomplete → FG; sold → COGS
Indirect materials and labour detour through overhead control; the residual is cleared at period end. Ch 4 fig 2

5 · Job or Process Costing?Ch 4–5

CueJobProcess
OutputDistinct job/batch/serviceMass of identical units
AccumulationSeparate job recordDepartment-period pool
AveragingWithin jobAcross all output
SignalCustomer specificationCompletion percentages
PHYSICAL ≠ EQUIVALENT UNITSCompletedmat. 100%conv. 100%Closing WIPmat. 100%conv. 20%EU = units × input completion %
Source-derived equivalent-unit split: the same WIP can be complete for materials and partial for conversion. Ch 5 fig 1

Five steps, fixed order1 reconcile physical units → 2 equivalent units → 3 cost per EU → 4 costs to account for → 5 assign to completed + closing WIP

Weighted average: blend opening WIP and current cost. FIFO: keep opening WIP separate and price current work separately.

1units2EU3$/EU4cost in5outstep 4 total = step 5 total
The last assignment must reconcile to all costs available; a mismatch usually means a percentage hit the wrong column. Ch 5 fig 2

6 · Support DepartmentsCh 6

MethodSupport-to-support useExam move
DirectIgnore itExclude support users from denominator.
Step-downOne directionRank; allocate; close; enlarge next pool.
ReciprocalBoth directionsUnderstand simultaneous equations.
support: ITsupport: HRassemblyfinishingcontested support link
Delete support-to-support links for direct; keep one-way links for step-down; reciprocal keeps both. Ch 6 fig 1

7 · Activity Based CostingCh 7

One plant-wide base fails when the pool contains costs driven by different things. ABC follows: resources generate costs → activities consume resources → products consume activities. Create activity pools, choose a causal driver for each, calculate each rate, assign by driver use, then compare product unit costs.

ONE-RATE SYSTEMall overheadone baseABCA1A2A3D1D2D3same total cost · different product split
Source-derived comparison: separate activity pools stop one volume base from hiding complexity. Ch 7 fig 1
TRIGGER: WHAT REPEATS?UNITeach unit madeBATCHeach set-up / orderPRODUCTline kept aliveFACILITYplant/storeORGANISATION
The causal link to a product weakens up the hierarchy; facility and organisation costs may remain unallocated. Ch 7 fig 2
Single-base distortionLikely result
High-volume, standardOver-costed; price too high; volume lost.
Low-volume, complexUnder-costed; price too low; bad volume won.

Do not claim ABC creates profit. It reallocates the same total. Benefits arrive only through repricing, redesign or capacity decisions. It may not be worth building when output is uniform, overhead is small, or resource use follows volume.

Build and diagnose

  1. Identify activities and resource costs.
  2. Create homogeneous pools.
  3. Choose each activity's causal driver.
  4. Rate = pool ÷ total driver quantity.
  5. Assign from product driver use.
  6. Add direct cost, divide per unit, explain the cross-subsidy.

Redesign signals: difficult products show implausible margins; competitors undercut simple products; the firm wins complex bids and loses simple ones; staff build shadow spreadsheets.

Memory check: pool and driver must describe the same activity.

9 · CVP, Safety & High–LowCh 8

units sold$revenuetotal costfixed costbreak-evenlossprofit
Revenue starts at zero; total cost starts at fixed cost. The crossing is calculated, never read from the sketch. Ch 8 fig 1

Margin of safety = actual/planned sales − break-even sales
Operating leverage = contribution margin ÷ profit

Assumptions: price and variable rate are constant; total fixed cost is constant; sales mix is stable; units produced equal units sold; all within the relevant range. Treat the answer as a band, not certainty.

HIGH–LOW USES ACTIVITY EXTREMESlow xhigh x
Pick highest and lowest activity—not highest and lowest cost—then check the fixed amount at both points. Ch 8 fig 2

Variable rate = (cost at high activity − cost at low activity) ÷ (high activity − low activity)
Fixed cost = total cost − variable rate × activity

10 · Short-Term RelevanceCh 9

allcostsfuture?no: sunkdifferent?no: commonINopportunity cost needs no entry
Source-derived filter: relevance comes from the decision, not from a fixed/variable label. Ch 9 fig 1
QuestionDecision rule
Make or buyCompare avoidable make cost with purchase price + opportunity cost.
Special orderSpare capacity: price vs incremental cost. Tight capacity: add displaced contribution.
Product mixRank CM per unit of binding constraint, not CM per product.
Drop segmentDrop only if avoidable cost saved exceeds lost revenue.

11 · Horizon Changes the AnswerCh 9–10

Short run: incremental + opportunity cost inside capacity. Long run: capacity becomes avoidable; pricing starts from full value-chain cost.

cost committedcost incurreddesignproduce / serve
Source-derived life-cycle picture: most cost is decided in design, then spent later; long-run cost management starts early. Ch 10 fig 1

Pricing: full value-chain cost includes all six functions; inventoriable cost stops at the factory. Name the horizon and purpose.

Activity based management: attack the driver. Savings become cash only when capacity is withdrawn or redeployed.

12 · Master Budget ChainCh 11

SALES BUDGETproductioncash receiptsoperating exp.materialslabour/OHcashstatements
Source-derived dependency order: a weak sales forecast contaminates every schedule below it. Ch 11 fig 1

Production = sales + desired closing FG − opening FG
Materials purchases = usage + desired closing materials − opening materials

Check: closing above opening means production/purchases exceed demand; a rundown means they fall short. Participation improves information; evaluation creates slack risk.

13 · Flexible Budget & VariancesCh 12

STATICplan volumevolumeFLEXIBLEactual volumeprice/useACTUALresultchange volume, then rates/use
Source-derived bridge: comparing static directly with actual merges two causes and two responsibilities. Ch 12 fig 1
https://www.asksia.ai/cheatsheet/unimelb-acct20001 · Full ACCT20001 study guide →
side 1/2 · Shared by ________
Forward this to your tutorial groupv2 · 2026-10-25
Your exam is closed book: nothing printed goes in. Use this sheet to revise and self-test, not to carry.
Semester 2 examination period, 2–20 November 2026.
ACCT
20001
Accounting for Management Decisions
The University of Melbourne · Semester 2, 2026 · Undergraduate level 2
Closed-Book Memory Sheet · Side 2 of 2 · self-test drills, judgement cards, traps
ACCT20001 cheatsheet QR code – open the full ACCT20001 study guide
Full guide + ask Sia about ACCT20001
SIDE 2/2   FIVE SOURCE-NUMBER DRILLS · If-you-see-X judgement cards · method chooser · classic traps · exam-morning retrievalrevise · close · reproduce · check

14 · Drill 1: Allocate the PoolCh 3 worked · 5 marks

Data: $96,000 power + machine servicing. R: 1,600 machine hours, 8,000 units. S: 800 hours, 2,000 units.

$96,000 ÷ 2,400 HOURS = $40/HOURR · 1,600 h$64,000 total÷ 8,000 = $8S · 800 h$32,000 total÷ 2,000 = $16check: $64,000 + $32,000 = pool
Carry the calculation through line allocation to the requested per-unit charge. Ch 3 worked
  1. Total base = 1,600 + 800 = 2,400 h.
  2. Rate = 96,000 ÷ 2,400 = $40/h.
  3. R allocation = 1,600 × 40 = $64,000; unit = $8.
  4. S allocation = 800 × 40 = $32,000; unit = $16.

Why S is higher: it uses half R's hours but spreads its allocation across one-quarter of R's units. The first division assigns to a line; the second reaches a unit.

Base defence: power and servicing are consumed while machines run, so machine hours track cause. A units base could allocate all $96,000 and still misstate causality.

CheckCatches
Base shares ⅔ + ⅓Wrong denominator
Allocations = $96,000Omission/double count
Final label $/unitStopping at line total

15 · Drill 2: Normal CostingCh 4 worked · 6 marks

Data: budgeted OH $528,000; budgeted machine hours 12,000; actual OH $514,000; actual hours 11,800.

PREDICT → APPLY → CLEARrate$528k ÷ 12k = $44/happly$44 × 11.8k = $519.2kactual$514k$5.2kOVER↓ COGS
Applied exceeds actual, so production carried $5,200 too much and cost of goods sold is reduced. Ch 4 worked

Dr manufacturing overhead $5,200
Cr cost of goods sold $5,200

Why normal costing exists: actual rate needs the whole period's overhead and base, so it cannot cost a March job until year end. The prediction buys timeliness; direct costs remain actual.

ComparisonDirectionCOGS
Actual OH > applied OHUnder-allocatedIncrease
Applied OH > actual OHOver-allocatedDecrease

Job record: materials and labour trace to requisitions/time records. Applied overhead is rate × chosen base, so identical jobs can carry different overhead judgements.

16 · Drill 3: Equivalent UnitsCh 5 worked · 4 marks

Data: no opening WIP; 9,000 completed; 2,000 closing WIP; materials 100% complete; conversion 35% complete.

Materials EUConversion EU
Completed9,0009,000
Closing WIP2,000 × 100% = 2,0002,000 × 35% = 700
Total11,0009,700
2,000 PHYSICAL CLOSING UNITSMATERIALS2,000 EUCONVERSION700 EUcompletion is input-specific
Material entered at the start; conversion accumulated with work. Ch 5 worked

Answer: materials 11,000 EU; conversion 9,700 EU. Completion is assessed for each input. Transferred-in cost is always complete in the receiving department.

Cost per EU (each category) = category cost to account for ÷ category EU
Completed cost = completed units × each category $/EU
Closing WIP = closing EU × each category $/EU

Weighted average: reconcile units; compute EU; combine opening + current cost; calculate $/EU; assign to completed and closing WIP; reconcile cost out to cost in.

ErrorRepair
One WIP %Separate materials/conversion.
Physical denominatorConvert incomplete work to EU.
No reconciliationCompleted + closing WIP = cost in.

17 · Support Allocation CardCh 6 worked

Data: technology costs $600,000; 60,000 h to assembly, 20,000 to finishing, 20,000 to HR.

SAME POOL · DIFFERENT DENOMINATORDIRECT$600k ÷ 80k h= $7.50/hSTEP-DOWN$600k ÷ 100k h= $6.00/h$120k to HR → larger HR pool
Direct excludes HR usage; step-down includes it because technology is allocated first. Ch 6 worked

Totals never change. The method redistributes support cost across operating departments, affecting later product costs. Justify the sequence by service provided, not preference.

18 · Drill 4: High–LowCh 8 worked · 5 marks

Data: $47,300 at 1,900 machine hours; $32,300 at 900 hours.

Δ COST ÷ Δ ACTIVITYrate: $15k ÷ 1,000 h = $15/hhigh: $47.3k − $28.5k = $18.8klow: $32.3k − $13.5k = $18.8kcost equation: Y = $18,800 + $15X
The identical fixed component is the arithmetic check; plotting all months checks whether the two extremes are representative. Ch 8 worked
  1. Select extremes by activity.
  2. Variable rate = $15 per machine hour.
  3. Fixed cost = $18,800 per month.
  4. State limitation: two observations determine the whole line; regression uses all observations.

Forecast: substitute the expected activity into Y = $18,800 + $15X. Stay within the observed relevant range unless the question justifies extrapolation. A high-cost month is not automatically the high point; a one-off repair can raise cost while activity remains ordinary.

Method stepSelf-check
Pick observationsHighest/lowest X, not Y.
Find slopeΔcost ÷ Δactivity; label $/driver.
Find interceptBoth points return the same fixed cost.
Use equationForecast only inside relevant range.

19 · CVP Recall CardCh 8

price − VCCM/unitfixed + target÷ CM/unitrequiredunitssales $ = (F + target) ÷ CM ratio
Target profit is treated as another block to be covered by contribution.
If you see X→ do Y
Unit dataUse CM per unit.
Sales percentagesUse CM ratio.
Several productsHold sales mix constant.
Price cutRecompute CM; break-even rises.

Break-even units = F ÷ CM/unit
Break-even sales = F ÷ CM ratio
Target units = (F + target profit) ÷ CM/unit
Margin of safety = actual/planned sales − break-even sales

20 · Drill 5: Binding ConstraintCh 9 worked · 4 marks

Data: P earns $18 contribution and uses 0.5 scarce machine hour. Q earns $30 and uses 1.2 hours. Demand exceeds capacity.

RANK PER UNIT OF THE BOTTLENECKP$18 ÷ 0.5 h= $36/hQ$30 ÷ 1.2 h= $25/hP first · avoids $11/h loss
Product contribution alone selects Q incorrectly; the scarce resource is what must be rationed. Ch 9 worked
  1. Name the binding constraint: machine hours.
  2. P = $36/h; Q = $25/h.
  3. Make P until its demand is met, then Q.
  4. If there is no scarce resource, no ranking is needed; make every product with positive contribution.

Selecting Q on unit contribution sacrifices $11 per constrained hour. After P demand is met, use the next-ranked product.

21 · Pricing Horizon Mini-ExampleCh 10 worked · 5 marks

Data: inventoriable production cost $118; R&D $22; marketing/distribution $19; customer service $6; mark-up 20%.

FULL-COST BASE BEFORE MARK-UPfull chain118 + 22 + 19 + 6 = $165price$165 × 1.20 = $198factory$118×1.2 = $141.60$23.40belowfull costlong-run price uses full value chain
Factory cost plus 20% looks profitable but is $23.40 below the unit's full consumption. Ch 10 worked

Answer: indicative full-chain price = $198. Factory-only price = $141.60, below $165 full cost. Contrast with a short-run one-off order using idle capacity, where price above incremental cost can add contribution.

22 · Decision Judgement CardsCh 9–10 FAQ

If you see X→ do Y
Allocated fixed OH in make/buyAsk whether it disappears; exclude if it continues.
Spare capacityNo displaced sale; no opportunity cost.
Machine at limitAdd lost CM as opportunity cost.
Reported segment lossCompare lost revenue with avoidable cost only.
Driver fallsDo not call it cash saved until capacity moves.

23 · Budget & Variance DrillCh 11–12 worked

Production schedule

Data: sales 9,000 units; opening finished goods 1,900; desired closing 1,200.

Production = 9,000 + 1,200 − 1,900 = 8,300 units

sales9,000+closing1,200−opening1,900= 8,300 production · inventory falls by 700
Because closing stock is below opening stock, production must fall short of sales. Ch 11 worked

Sales-volume variance

Data: budget 10,000 cases; price $50; variable cost $30; fixed cost $150,000; actual sales 11,200.

CM = $50 − $30 = $20 PER CASESTATIC PROFIT10,000×20 − 150k= $50,000FLEX PROFIT11,200×20 − 150k= $74,000$24,000 F = 1,200 × budgeted CM $20
The volume variance explains extra cases only; it says nothing about actual prices, efficiency or spending. Ch 12 worked

Answer path: static profit $50,000; flexible profit $74,000; sales-volume variance $24,000 favourable. Only actual volume enters the flexible budget; price, variable rate and fixed cost remain budgeted.

Master-budget linkFormula / dependency
SalesUnits × selling price; heads the chain.
ProductionSales + closing FG − opening FG.
Materials usageUnits to produce × input per unit.
PurchasesUsage + closing materials − opening materials.
CashTiming of receipts/payments from all schedules.

Behaviour: budgets plan, coordinate, motivate and evaluate. Participation improves information but invites slack; review assumptions.

24 · Variance Direction CardCh 12

For costsFavourableUnfavourable
PriceAP < SPAP > SP
QuantityAQ < SQ allowedAQ > SQ allowed

25 · Method ChooserCh 1–12 synthesis

SCENARIO CUE → FIRST METHODExact quantity?trace; else allocateUnique output?job costingIdentical + % complete?process costingMany activities/drivers?ABCProfit at a volume?CVPAlternative choices?relevant costsACTUAL ≠ PLAN VOLUME → FLEX FIRST
Routing is the examinable skill: recognise the data pattern before touching arithmetic.
If you see X→ do Y
Budgeted OH + basePredetermined rate; apply to actual base.
Actual vs applied OHName under/over; adjust COGS.
Support units serve each otherDirect, step-down or reciprocal.
Target profitAdd target to fixed block.
Inventory formulaAdd closing; subtract opening.

26 · Classic Trap RepairsFAQ · study strategies

TrapRepair phrase
Cost object driftsWrite it above the working.
Base denominator is one productUse total base across all objects.
Line allocation given as unit costDivide once more by product units.
Fixed cost called irrelevantApply future + different tests.
ABC “saves total cost”Same total, better split; action creates value.
Flexible budget uses actual priceActual volume only; all rates budgeted.
F/U treated as verdictInvestigate linked causes and responsibility.
OBJECTMETHODNUMBERDOstate → calculate → reconcile → act
A calculation earns its last mark only when the recommendation states what the number changes.

27 · Exam-Morning Retrievalcourse study strategy

At home: close this page and reproduce: four moves; classification tests; allocation formulas; under/over direction; process steps; support methods; hierarchy; CVP/high–low; relevance; budget signs; flexible bridge; variance formulas.

https://www.asksia.ai/cheatsheet/unimelb-acct20001 · Full ACCT20001 study guide →
side 2/2 · Shared by ________
Forward this to your tutorial groupv2 · 2026-10-25
Your exam is closed book: nothing printed goes in. Use this sheet to revise and self-test, not to carry.
Semester 2 examination period, 2–20 November 2026.

Want one for YOUR exact syllabus?

Sia is your free desktop study agent. Drop your University of Melbourne ACCT20001 slides — Sia builds a sheet tailored to YOUR exam. Better than this library because it knows YOUR materials.

↓ Download Sia · Free