about FNCE90047
0 · Exam Mapcourse.json · brief
4,000-word Group Assignment 30% · End-of-semester Examination 70% · three hours during the examination period.
Permitted materials: not confirmed for this offering in the course materials we hold — check the exam instructions on the LMS.
| Answer move | What earns meaning |
|---|---|
| Define | Object, claim, unit, date |
| Compute | Symbols, signs, denominator |
| Decide | Mechanism + comparison |
| Qualify | Boundary that could reverse result |
1 · System → JudgementCH1 · FIG1
Balance-sheet leverage · exam bite: scale loss absorptionL = Total assets / Equity
Financial system = markets, intermediaries, instruments and infrastructure coordinating saving, investment and risk. Systemic risk = distress or disruption that impairs broad system function. Regulatory perimeter = boundary of specified oversight.
Limit: formal compliance does not establish economic resilience or fair outcomes. Leverage alone is not failure probability; inspect asset volatility, liquidity, funding and loss absorption.
2 · Capital RaisingCH2 · FIG1
Offer discount · exam bite: issue-price comparisonDiscount = (V − Pₒffₑᵣ) / V
Primary market: issuers sell newly created securities. Private placement: issuance to a limited investor group under applicable rules. Underpricing: positive initial market return relative to offer price.
3 · Orders & LiquidityCH3 · FIG1
Proportional bid–ask spread · exam bite: quoted costs = (Ask − Bid) / [(Ask + Bid)/2]
| Order | Gains | Gives up |
|---|---|---|
| Limit | Specified price or better | Execution certainty |
| Market | Prompt execution | Price certainty |
Market liquidity means trading desired quantity promptly with limited price impact and cost. Trap: quoted spread omits impact, latency, fees and non-execution.
4 · Funds & NAVCH4 · FIG1
Net asset value · exam bite: per-unit accounting valueNAV = (Assets − Liabilities) / Units
Managed fund pools capital under a mandate and fee structure; a benchmark is the reference portfolio or index used to interpret mandate and performance.
| Check | Question |
|---|---|
| Exposure | What claim and risk does the mandate create? |
| Price | Which valuation point and adjustments? |
| Evidence | Return versus matched benchmark and period? |
| Governance | Fees, liquidity, oversight, incentives? |
Limit: past return and a familiar label establish neither skill, suitability nor liquidity.
5 · Active, Index, ETFCH5 · FIG1
Tracking difference · exam bite: matched-period relative returnTD = Rfund − Rindex
| Product | Core test | Residual issue |
|---|---|---|
| Active | After-cost outperformance? | Active risk; evidence window |
| Index | Tracks declared methodology? | Fee, tax, cash, sampling |
6 · Fixed IncomeCH6 · FIG1
Fixed-income security = debt claim with contractual payment rules, maturity and priority. Yield to maturity = single rate equating price to promised cash flows under model assumptions.
Duration approximation · exam bite: small yield shockΔP/P ≈ −Dmod × Δy
Direction + units
- Convert percentage-point yield change to decimal before multiplying.
- Yield ↑ ⇒ price ↓ under the local duration approximation; sign is negative.
- State: small, parallel yield change; convexity and spread changes omitted.
| If asked… | Use… | Then qualify… |
|---|---|---|
| Price sensitivity | Modified duration | Local first order |
| Promised-return rate | YTM | Cash flow, reinvestment, default assumptions |
| Scenario value | Reprice cash flows | Curve + spread path |
Boundary: duration is not a full scenario valuation. A large/non-parallel move, changing cash flows or spread movement can break the shortcut.
Method CheckCH1–6
Yield-Risk BoundaryCH6 limit
7 · Banking & RunsCH7 · FIG1–2
Intermediation transforms funding claims, information, liquidity and risk between savers and borrowers. Bank run = rapid withdrawal or non-renewal driven by liquidity need or confidence loss.
Liquidity coverage ratio · exam bite: stressed 30-day outflowsLCR = High-quality liquid assets / 30-day net cash outflows
| Constraint | Question | Failure channel |
|---|---|---|
| Liquidity | Can cash be paid now? | Run, frozen funding, forced sale |
| Capital | Can losses be absorbed? | Asset loss erodes equity |
Do not merge them: capital and liquidity are related but distinct. Audit eligible liquid assets, stress horizon and outflow model.
8 · Mortgages → TranchesCH8 · FIG2
Mortgage = property-secured loan with contractual repayment and default terms. Securitisation pools and finances receivables through securities backed by their cash flows. A tranche sets priority in losses and distributions.
Pool loss rate · exam bite: pool credit lossLoss rate = (Defaulted balance × LGD) / Initial pool balance
Waterfall method
- State pool balance and realised loss.
- Read contractual first-loss priority.
- Allocate until that layer is exhausted.
- Move residual loss upward; report remaining protection.
Limit: pooling and credit enhancement redistribute risk; they do not eliminate it. Prepayment changes timing; default changes amount; priority changes who bears loss.
9 · FX & Capital FlowsCH9 · FIG1
Spot rate = current price of one currency in units of another. Forward rate = contracted future-delivery rate. Capital flow = cross-border acquisition or disposal of financial claims.
Covered-interest parity · exam bite: parity forward benchmarkFUSD/AUD = SUSD/AUD × (1 + rUSD)/(1 + rAUD)
| Step | Non-negotiable check |
|---|---|
| 1 Quote | Write “USD per AUD” beside every rate. |
| 2 Match | Same horizon and compounding. |
| 3 Place | Quoted-currency rate in numerator. |
| 4 Qualify | Executable dealing and funding rates. |
Trap: parity is a no-arbitrage benchmark under assumptions, not a forecast of future spot.
10 · Derivatives & HedgeCH10 · FIG1
Derivative links value to an underlying price, rate, event or index. A hedge offsets a defined exposure under stated conditions. Basis risk remains when hedge and exposure do not move identically.
Index futures hedge · exam bite: beta-neutral contract countN* = β × VP / VF
| Exposure | Adverse move | Hedge direction |
|---|---|---|
| Long equity portfolio | Market falls | Short index futures |
| Foreign receipt | Foreign currency falls | Sell foreign forward |
| Foreign payment | Foreign currency rises | Buy foreign forward |
Residual: basis, liquidity, counterparty, model and operational risk. Contract rounding and beta drift also change the result.
11 · Insurance & CDSCH11 · FIG1–2
Insurance premium prices defined protection. A credit default swap exchanges periodic premium for defined credit-event protection. Moral hazard is behaviour or care changing after risk is partly transferred or obscured.
Expected credit loss · exam bite: loss benchmarkECL = EAD × PD × LGD
| Contract check | Question |
|---|---|
| Trigger | Which insured loss or credit event? |
| Cash flows | Premium timing; protection payment? |
| Exposure | Notional, EAD, recovery / LGD? |
| Residual | Basis, legal, counterparty, incentives? |
Do not price from ECL alone: a market premium can also reflect timing, capital, liquidity and risk pricing.
Integrated Method ChooserCH1–11
| See this | Use this |
|---|---|
| Balance-sheet scale | Leverage + funding/liquidity map |
| Issue price versus value | Offer discount + route comparison |
| Quote / order book | Midpoint + proportional spread |
| Fund per-unit value | NAV; state valuation point |
| Bond yield shock | Duration, decimal Δy, negative sign |
| Currency hedge | Write quote units; parity / forward direction |
| Portfolio market risk | β-adjusted futures count |
| Credit protection | ECL benchmark + contract residuals |
One sensitivity after every baseline: change the input most connected to the mechanism, hold the remaining assumptions fixed, recompute only affected steps, and explain whether the movement matches the theory. This exposes the assumption controlling the conclusion.
Sia → The recurring answer route is: map issuer, investor, intermediary and claim → trace funding / risk transfer → apply a transparent metric → stress rates, liquidity, default, incentives and regulation.