about MGMT10002
0 · Exam Mapcourse data · brief
Official exam rule: “2-hour (closed book) exam: 4 short essay questions” — MGMT10002 2026 Lecture 1 deck; BRIEF.md
The reusable five-move answerFRAME decision + stakeholder → DIAGNOSE with case evidence → EXPLAIN mechanism → RECOMMEND owner + sequence + conditions → EVALUATE trade-off + residual risk + review trigger.
Recall check Can you write the five verbs, then make every sentence earn one of them?
1 · Management as a SystemCH 1 · high transfer
Management coordinates people, information, resources and relationships to achieve collective purposes responsibly. PLOC is a feedback system, not four isolated or fixed stages.
| Function | Case question | Failure signal |
|---|---|---|
| Plan | Outcome, horizon, assumptions? | Forecast treated as certainty |
| Organise | Roles, authority, resources? | Unowned hand-off |
| Lead | Influence, voice, cooperation? | Compliance without learning |
| Control | Standard, measure, response? | Metric drives gaming |
Control sequence: standard → actual evidence → compare variance → investigate cause → correct, learn or revise the standard. “Monitor performance” is incomplete without measure, timing, tolerance, owner and response.
2 · Performance TestCH 1 · compare
3 · Perception → BehaviourCH 2 · diagnosis
Self-awareness = accurate, revisable understanding of patterns, emotions, limits and impact. Separate observation from interpretation: silence is observable; “low commitment” is an attribution.
| Concept | Case move |
|---|---|
| Attitude | Check cognition, affect, tendency—and context |
| Perception | Ask what selective attention filtered out |
| Attribution | Test person claim against situational evidence |
| Regulation | Choose expression; do not merely suppress |
Emotional intelligence: recognise → understand → regulate emotion in self/relationships. It supports judgement but cannot replace expertise, ethics or structural repair.
4 · Motivation DiagnosisCH 3 · core chain
Motivation = direction, intensity and persistence of effort. Diagnose needs, process and job conditions before prescribing pay.
Expectancy logicExpectancy × instrumentality × valence: training/resources repair E; credible reward practice repairs I; a valued outcome repairs V.
Equity: perceived fairness of contributions/outcomes, voice and process. Goals: specific, challenging but credible, accepted and supported; add quality, ethics and workload guardrails against displacement.
5 · Leadership: Fit, Not StyleCH 4 · decision rule
Leadership = influence toward legitimate purpose, with or without formal authority. Task behaviour clarifies roles, standards and sequence; relationship behaviour listens, supports, involves and develops. Both can be high.
| Condition | Behaviour | Risk |
|---|---|---|
| Urgent/unclear/safety | Direct + escalate | Silenced expertise |
| Experts + ambiguity | Frame + integrate | No decision right |
| Capability proven | Delegate + review | No authority |
Transactional = clear exchange; transformational = purpose, challenge, development. Power: authority, expertise, relationships, information or resources; can dissent alter choice?
6 · Teams, Difference, ConflictCH 5 · classify first
A team has interdependence, shared purpose, complementary contribution and shared accountability. Diversity expands potential information, not guaranteed influence. Psychological safety protects questions/mistakes; pair with standards.
| Conflict | Object → response |
|---|---|
| Task | Ideas → criteria + safe debate |
| Process | Who/how → roles + rule |
7 · Communication = MeaningCH 6 · channel fit
8 · Opportunity + EthicsCH 7 · boundary
Idea = possibility. Opportunity = evidenced need + feasible delivery + viable, legitimate model. Stage commitment behind evidence.
| Lens | Ask → control |
|---|---|
| Consequences | Who gains/loses? → harm evidence |
| Rights/duties | Non-tradeable? → boundary/remedy |
| Justice | Who bears risk? → voice/process |
| Conflict | Distorted judgement? → disclose/control |
Sustainability: social + environmental + economic effects within a boundary/time. Mission drift: growth displaces purpose; protect voice + impact floor.
9 · Structure = Divide + ReconnectCH 8 · fit
Structure divides via specialisation, grouping, hierarchy, span, centralisation and formalisation; reconnects via authority, information and coordination. Trace decision flow.
| Choice | Fit | Repair risk |
|---|---|---|
| Centralise | Consistency, scarce expertise | Bound local authority |
| Decentralise | Local knowledge/speed | Thresholds + audit |
| Formalise | Routine/high consequence | Exception route |
| Matrix | Dual integration | Escalation/resource rules |
10 · Culture: Infer, Don’t QuoteCH 9 · layers
11 · Environment → DecisionCH 10 · filter
Scan economic, technological, political/legal, social/demographic and ecological conditions. Link one to demand, capability, cost, legitimacy or risk. No decision change = background.
Stakeholders: stake, power, legitimacy, urgency, dependence, impact; protect low-power/high-impact voice.
Make the scan decideTrend → mechanism + response. Uncertainty → scenarios + robust action + trigger. Forecast → estimate + assumptions.
12 · Planning + MBOCH 11 · alignment
Mission = purpose/boundary; vision = direction; goals prioritise; plans translate contribution. Align across levels/units.
SMART specifies, not validates. Add owner, horizon, guards. MBO = negotiated objectives + support + review.
UncertaintyAssumptions → scenarios → robust action → contingency trigger → rolling review. Leading signals prompt action; lagging results confirm.
13 · Strategy + DecisionsCH 12 · choose
14 · Value, Flow, ServiceCH 13 · system view
Value comes from a connected activity system. Map verbs, hand-offs, waits, queues, rework, information and decision rights. A linkage means one activity changes another’s cost, quality or effectiveness.
Bottleneck = resource/rule limiting throughput. Verify with completion, queue, blocked time, rework and availability; reduce its loss; test throughput; reassess as the constraint moves. Faster non-constraint work may enlarge inventory.
| Resilience | Gain | Cost |
|---|---|---|
| Buffer | Absorb variation | Resources; hides failure |
| Redundancy | Backup capacity | Cost/coordination |
| Flexibility | Adapt method | Skill/information |
| Visibility | Earlier response | Data/governance |
Service quality: outcome + process + reliability/responsiveness + accessible recovery. Dashboard = flow signal + outcome + guardrail; inspect distributions. Recovery remedies now and reduces recurrence.
15 · Innovation + ChangeCH 14 · guarded scale
Invention creates novelty; innovation implements novelty for stakeholder value. State reference point, adoption and outcome. Move problem → hypothesis → experiment → selection → implementation/diffusion through evidence gates.
Change diagnosis: content (what), process (how), context (history, readiness, power, workload). Resistance may carry identity, loss, risk or ethical evidence. Redesign a specific driving/restraining force.
Change sequenceOutcome → voice → capability/resources → pilot → outcome + guardrails → scale/adapt/stop → align routines, roles, measures, rewards.