about MGMT90280
0 · Exam Map course.json · brief
| Assessment | Weight · format |
|---|---|
| Assignment 1 | 20% · timed Respondus quiz, semi-open-book |
| Assignment 2 | 25% · group analytics report/project |
| Class presentation | 5% · group oral presentation of A2 |
| Final exam | 50% · individual; 5 compulsory short/long-answer questions |
“Unlimited printed or handwritten resources (No digital resources permitted)” (MGMT90280 exam permitted-materials list, 2026 subject materials). Paper notes are allowed: print this sheet and bring it.
Pace: 120 writing minutes ÷ 100 marks = 1.2 min/mark; a 20-mark question ≈ 24 min. Use reading time to label the method, inputs, requested decision and units.
2 · Linear Programming CH1 · optimisation
Use when objective and constraints are linear and variables may be continuous. Define units; then:
general formMax/Min Z = Σ cⱼxⱼ
s.t. Σ aᵢⱼxⱼ {≤, =, ≥} bᵢ; xⱼ ≥ 0
Four marked parts: decision variables; objective; one row per constraint; non-negativity. In Solver use Simplex LP.
Linearise percentage rules
For non-negative totals, multiply out before Solver. Example:
A ≥ 0.40(A + B)
A − 0.40A − 0.40B ≥ 0
0.60A − 0.40B ≥ 0
Corner rule: a linear objective over a polygon reaches an optimum at a feasible vertex; evaluate all corners for a two-variable hand solve.
3 · Integer & Binary LP CH2 · optimisation
Use when decisions must be whole units or yes/no. Pure ILP: all integer; MILP: some; binary: xⱼ∈{0,1}. Use Simplex LP with integer/binary constraints and Integer Optimality 0%.
relaxation boundMax: z*LP ≥ z*ILP (upper bound)
Min: z*LP ≤ z*ILP (lower bound)
Never round a fractional relaxation: rounding may violate a row or miss a better integer point. If relaxation is already integral, it also solves the ILP.
| English rule | Binary row |
|---|---|
| At most k | Σxⱼ ≤ k |
| At least / exactly k | Σxⱼ ≥ k / = k |
| j only if i | xⱼ ≤ xᵢ |
| Not both i,j | xᵢ+xⱼ ≤ 1 |
| Both or neither | xᵢ = xⱼ |
3b · ILP Finish CH2
Translate one sentence → one row, test each row with 0/1 substitution, then state chosen projects and unused budget. Standard LP sensitivity does not apply cleanly after integrality: discrete changes can jump the solution, so re-solve.
3c · Binary Formulation Checklist CH2 · marks
Capital budgeting: let xⱼ=1 when project j is funded. Maximise total NPV ΣNPVⱼxⱼ subject to ΣCostⱼxⱼ≤budget, then add every logical rule separately. Keep dollar units consistent—if inputs are in $000, the objective and budget are also in $000.
Truth-test “j only if i”: xⱼ≤xᵢ permits (i,j)=(0,0),(1,0),(1,1) but forbids (0,1). Reversing the row encodes the reverse implication. For “at least one”, use Σx≥1; “exactly one”, Σx=1; “at most one”, Σx≤1.
4 · Nonlinear Programming CH3 · final Q1
Cue: squares, products or ratios in objective/constraints. Profit questions begin with Profit = Revenue − Cost. Use GRG Nonlinear for smooth models.
by-hand workflow1 Write Z and constraints
2 Solve ∂Z/∂qᵢ = 0
3 Check feasibility
4 If infeasible, bind the active row, substitute, re-optimise
5 Check d²Z/dq² < 0 / concavity; state plan + profit
GRG is a hill-climber: on non-concave surfaces try several starts. A concave objective over a convex region has one peak, so its local maximum is global.
5 · Probability Chooser CH4
| Model | Signature · core facts |
|---|---|
| Binomial(n,p) | n independent trials, constant p; E=np; Var=np(1−p) |
| Poisson(μ) | Count per interval, constant rate; E=Var=μ |
| Uniform(a,b) | Equal density; E=(a + b)/2; Var=(b−a)²/12 |
| Normal(μ,σ) | Bell; z=(x−μ)/σ |
| Exponential | Time between events; mean μ, Excel rate=1/μ |
BINOM.DIST(x,n,p,FALSE)=P(X=x)
TRUE=P(X≤x); upper tail=1−cdf
NORM.INV(probability,μ,σ)=percentile
6 · Monte Carlo Simulation CH5 · final Q2
Use when uncertain inputs drive an output distribution. Loop: model → assign distributions → sample → recalculate → repeat → report risk and decision. Use ≥1,000 iterations for a stable estimate.
inverse transformRN = RAND() ~ Uniform(0,1)
Uniform: x=a + (b−a)RN
Normal: x=NORM.INV(RN,μ,σ)
Discrete: RN∈[F(xₖ₋₁),F(xₖ)) → xₖ
Intervals are cumulative and half-open: the lower bound belongs; the upper bound moves to the next outcome. Simulation enables risk analysis but does not guarantee an optimum.
6b · Single-Server Queue CH5
Arrivalᵢ = cumulative IATᵢ
Startᵢ = max(Arrivalᵢ, Departureᵢ₋₁)
Departureᵢ = Startᵢ + Serviceᵢ
Waitᵢ = Startᵢ − Arrivalᵢ
Idleᵢ = max(0, Arrivalᵢ−Departureᵢ₋₁)
IAT ≠ arrival time: cumulate first. A customer either waits or the server is idle, never both. Compare mean wait or risk of exceeding threshold with the stated staffing rule.
6c · Simulation Output → Decision CH5
Monte Carlo produces an output distribution. Report mean, spread and the tail probability tied to the threshold, e.g. P(wait>4). More runs reduce sampling noise, not model error.
7 · Clustering CH6 · descriptive mining
Unsupervised: no outcome label; group similar records. Standardise numeric features before distances so units do not dominate.
z=(x−x̄)/s · d(u,v)=√Σ(uⱼ−vⱼ)²
| Method | Rule |
|---|---|
| Matching | (1–1 + 0–0 matches)/all binary fields |
| Jaccard | 1–1 / (1–1 + mismatches); ignores joint 0–0 |
| Single linkage | Minimum pairwise distance |
| Complete linkage | Maximum pairwise distance |
| k-means | Assign nearest centroid → recompute means → repeat |
Cut a dendrogram horizontally: lines crossed = clusters. For a new record, use the same training means/SDs, then assign the nearest centroid.
8 · Association Rules CH7
Support(A→C)=count(A∪C)/N
Confidence=count(A∪C)/count(A)=P(C|A)
Lift=Confidence ÷ [count(C)/N]
Decision: lift >1 useful positive association; =1 independent; <1 worse than random. Confidence is directional; lift is symmetric. A common consequent can create high confidence but weak lift—check lift last.
9 · Regression CH8 · final analytics
ŷ=b₀+b₁x₁+…+bₚxₚ; e=y−ŷ
b₁=Σ(x−x̄)(y−ȳ)/Σ(x−x̄)²; b₀=ȳ−b₁x̄
SST=SSR+SSE; R²=SSR/SST
Adj R²=1−(1−R²)(n−1)/(n−p−1)
Slope: expected change in mean y for +1 x, holding other predictors fixed. Compare models with adjusted R², not raw R².
| Question | Test and decision |
|---|---|
| Any predictor useful? | Overall F=MSR/MSE; df (p,n−p−1); upper-tail |
| One βₖ useful? | t=bₖ/SE(bₖ); df n−p−1; two-tail |
| Reject | p-value < α; 95% CI excluding 0 agrees |
k categories need k−1 dummies; omitted category is baseline. Interaction means one predictor’s effect depends on another. Predictor |r|>0.7 warns of multicollinearity: inflated SEs can give significant F but weak individual t-tests.
10 · Forecasting CH9
| Pattern | Method |
|---|---|
| Horizontal | Moving average or exponential smoothing |
| Trend | Regression with time t |
| Seasonal | k−1 seasonal dummies |
| Cyclical | Multi-year, no fixed period; hardest |
eₜ=yₜ−ŷₜ; MAE=Σ|e|/(n−k); MSE=Σe²/(n−k)
MAPE=Σ|e/y|/(n−k)×100; MFE=Σe/(n−k)
Fₜ₊₁=αyₜ+(1−α)Fₜ; set F₂=y₁
MFE is bias, not accuracy: negative = over-forecast. Pick lower error, significant trend and higher adjusted R².
11 · Classification CH10 · final Q5
Train builds; validation tunes/prunes; test gives one final unbiased score. Low train error with higher validation error = overfitting.