0 · Exam Mapcourse.json · brief
| Component | Weight |
|---|---|
| Early Feedback Quiz | 5% |
| Mid Semester Exam | 20% |
| Major Group Assignment | 25% |
| Final Exam | 50% |
Permitted materials: not confirmed for this offering in the course materials we hold — check the exam instructions on the LMS. Source: BRIEF.md; course.json
The final is listed in the formal examination period: two hours, problem-solving and short-answer questions across the course. Prioritise set-up, calculation, direction check, interpretation.
1 · Finance DecisionsCh 1 · classify + explain
| Decision | Question | Answer cue |
|---|---|---|
| Investment | Which real asset? | Future cash flows; value created |
| Financing | Which claim funds it? | Debt, equity, retained cash |
| Payout | Distribute or retain? | Cash to owners vs future use |
Shareholder wealth is a residual-cash-flow objective, not a short-run price target. Link stakeholder facts through contracts, regulation, reputation or durable operating cash flow.
Agency diagnosisdecision right → private incentive → shareholder consequence → targeted control → control cost
Agency cost = monitoring cost + bonding cost + residual loss. Boards, disclosure, monitoring and incentive pay can align choices, but each may be costly or create a new short-term or manipulation incentive.
1b · Linked-Decision ScriptCh 1 worked example
Case: a company buys a $14m automated warehouse, funds $9m with bonds and reduces its planned dividend to preserve cash.
2 · Time Value CoreCh 2 · calculation
single sumFVₜ = PV(1+r)ᵗ
PV = FVₜ/(1+r)ᵗ
project decisionNPV = −cost₀ + Σ CFₜ/(1+r)ᵗ
accept if NPV > 0 under the forecast and required-return assumptions
Cash flows at different dates cannot be added directly. Set one focal date, match r to each interval, count gaps rather than year labels, retain at least four decimals, then round the final answer.
| Change | PV direction | Why |
|---|---|---|
| r rises | Falls | Heavier discount |
| Receipt later | Falls | More intervals |
| CF rises | Rises | More value at same date |
Equivalent-value test
Two streams are equivalent only if they have equal value on the same date at the same rate. A different focal date should give the same decision after moving every cash flow consistently.
2b · Timing ControlsCh 2 · trap check
| Pattern | Formula locates value |
|---|---|
| Ordinary annuity | One period before first payment |
| Annuity due | Ordinary value × (1+r) |
| Perpetuity | One period before next C |
| Irregular stream | Each CF separately, or genuine blocks |
Never average an uneven stream. Value each genuine block at its natural date; only then move block values to the common comparison date.
2c · Valuation Answer PathCh 2 study method
- Draw: show t=0, every payment date and sign.
- Name: single sum, finite level stream, perpetual stream, growing stream or irregular blocks.
- Locate: write where the chosen formula places its answer.
- Move: compound or discount that local value to the requested date.
- Interpret: state currency, date and decision.
3 · Streams & RatesCh 2–3 · formula choice
level streamsPVann = C[1−(1+r)⁻ⁿ]/r
PVperp = C/r
PVgrowing perp = C₁/(r−g), with r > g
| Cash-flow shape | Use | Control |
|---|---|---|
| One amount | Single sum | Count intervals |
| Equal, finite | Annuity | First-payment date |
| Equal, forever | Perpetuity | Use next payment |
| Constant growth | Growing perpetuity | r > g |
| Changing/uneven | Stages or separate PVs | Common date |
A delayed annuity takes two moves: value the level stream one period before its first payment, then discount that local value to the required date. An annuity due receives every amount one period earlier, so its value is higher when r > 0.
4 · Convert RatesCh 3 · recurring set-up
rate coreperiodic rate = APR/m
EAR = (1+APR/m)ᵐ−1
continuous growth factor = eʳᵗ
| Given | Needed | Move |
|---|---|---|
| APR, m | period rate | divide by m |
| APR, m | EAR | compound m periods |
| EAR | monthly rate | (1+EAR)¹⁄¹²−1 |
APR annualises without the within-year interest-on-interest effect; EAR measures actual one-year growth. For m > 1 and positive rates, EAR normally exceeds the quoted APR. Compare products on a common effective horizon.
4b · Rate & Uneven-Flow AuditCh 3 drill
Quick conversion: 7.2% APR compounded quarterly gives rq=7.2%/4=1.8% and EAR=1.018⁴−1=7.3967%. It exceeds 7.30% effective annually on the common one-year basis.
5 · LoansCh 3 · solve + reconcile
level-payment loanPayment = PV × r/[1−(1+r)⁻ⁿ]
Interestₜ = opening balance × r
Principalₜ = payment − interestₜ
Closing = opening + interest − payment
| Step | Write before calculating |
|---|---|
| 1 | Advance date and amount |
| 2 | Periodic rate and payment count |
| 3 | First-payment timing / payment mode |
| 4 | Balance roll-forward |
For a normal amortising loan, the outstanding balance falls. Interest on the smaller balance falls; therefore more of the same fixed payment reduces principal. A deferred payment or balloon amount needs a dated timeline rather than a stretched annuity formula.
Prospective balance: PV of payments still due immediately after the balance date. Retrospective balance: accumulated advance less accumulated payments. The two routes should agree apart from displayed rounding.
6 · Bond ValuationCh 4 · price + classify
bond corePrice = C[1−(1+y)⁻ᴺ]/y + F/(1+y)ᴺ
C, y are per-period; N is payment periods.
| Coupon rate vs yield | Price |
|---|---|
| coupon > yield | premium: P > F |
| coupon = yield | par: P = F |
| coupon < yield | discount: P < F |
Semiannual audit: coupon = F × annual coupon rate ÷ 2; y = quoted APR yield ÷ 2; N = years × 2. A market-yield change alters the discount rate, not the contractual coupon.
Yield ↑ → price ↓. Holding features constant, longer maturity and lower coupons place more value in distant cash flows and make price more sensitive. The captured material supports this qualitative relation; do not introduce a formal duration calculation.
Credit spread = risky yield − comparable benchmark yield. Match maturity, currency, date and convention; interpret as extra required return, not a direct default probability.
7 · Equity ValuationCh 5 · choose the path
equity coreHolding return = (D₁ + P₁ − P₀)/P₀
No-growth P₀ = D/r
Constant-growth P₀ = D₁/(r−g), r > g
One period: P₀ = (D₁+P₁)/(1+r)
| Given | Required timing move |
|---|---|
| Dividend just paid | Label D₀; grow once for D₁ |
| Temporary high growth | Forecast each dividend explicitly |
| Stable growth starts with Dₙ₊₁ | Place terminal value at n |
Terminal value sits one period before the first dividend it contains. Discount explicit dividends and terminal value to today. If terminal value dominates estimated price, stress the required return and perpetual growth separately.
Required return can be written as dividend yield + expected capital-gain yield for the same holding period. A higher credible dividend forecast raises value; a higher required return lowers it; perpetual growth close to r makes the estimate highly sensitive.
7b · Markets & GrowthCh 5 · short answer
| Market | Cash / claim |
|---|---|
| Primary | New security; funds go to company |
| Secondary | Existing claim trades between investors; price discovery + liquidity |
Retention supports growth only when reinvestment earns an adequate return. A market-price comparison remains conditional on operating cash generation, payout, growth horizon and risk assumptions.
7c · Return & Value ChecksCh 5 drills
Holding-return check: buy at $28.40, receive $0.90 and sell at $31.10:
HPR = (0.90 + 31.10 − 28.40)/28.40 = 12.6761%
dividend yield = 0.90/28.40 · capital-gain yield = 2.70/28.40
| Model | What must remain visible |
|---|---|
| No growth | Constant dividend forever; P=D/r |
| Constant growth | Next dividend D₁; credible g; r>g |
8 · Dividend PolicyCh 6 · three lenses
| Lens | Question to answer |
|---|---|
| Investment | Is payout genuine surplus or does it sacrifice a positive-NPV project? |
| Information | Regular, sustainable signal or temporary special distribution? |
| Tax | What tax rate and franking proportion are stated? |
Under the idealised irrelevance baseline, payout alone does not create value when investment policy is fixed, markets are frictionless and investors can create homemade dividends. Real-world taxes, transaction costs, information and agency conflicts can matter.
Smoothing: managers respond to persistent expected profit and resist cutting a regular payout once investors treat it as sustainable. A dividend increase may signal confidence; moving cash itself is not automatic wealth creation.
imputation coreFranking credit = cash dividend × tax rate/(1−tax rate)
Grossed-up dividend = cash dividend + franking credit
Keep cash, the attached amount and grossed-up income in separate rows. Reverse-check a fully franked result by applying the stated company tax rate to grossed-up income.
9 · Risk & DiversificationCh 7 · calculation + explain
return + risk coreE(R) = ΣpᵢRᵢ · σ² = Σpᵢ[Rᵢ−E(R)]² · σ = √σ²
E(Rp)=wA E(RA)+wB E(RB)
σp²=wA²σA²+wB²σB²+2wAwBρABσAσB
| Input changes | Expected return | Risk |
|---|---|---|
| ρ only falls | Unchanged | Falls |
| weight changes | Changes linearly | Changes non-linearly |
| company-specific shock diversified | — | Reducible |
| broad market shock | — | Systematic; remains |