GPA Guarantee: Score A+ under Finals

Lecture Transcription |LMS sync |Live Tutor Q&A
50% OFFAll plan

FINC5001 Cheatsheet · Foundation in Finance

University of Sydney · Cheatsheet for the final exam. Semester 2 formal examination period, from 16 November 2026 (the Exams Office publishes the exact date). Full FINC5001 study guide →

A4 landscape · two revision sides · 6 columns each · ink + yellowFINC5001 · S2 2026 · USyd
FINC5001
Foundation in Finance
The University of Sydney · Postgraduate · Semester 2, 2026
Closed-book memory sheet · formula sheet provided · Side 1 of 2
FINC5001 cheatsheet QR code – open the full FINC5001 study guide
Full guide + ask Sia
about FINC5001
SIDE 1/2   DECIDE → ALIGN TIME + RATE + RISK → CALCULATE → INTERPRET → STRESS Memory sheet · revision only what the provided formula sheet does not decide

0 · Exam Mapcourse.json · brief

510Major assignment 40%Final exam 45%
QuizzesWorkshop quizzesMajor assignmentFinal exam
5%10%40%45%

“The exam will be an in-person, closed-book assessment.” FINC5001 current Canvas Assessments Information page.

Final: supervised two-hour final examination. Closed book with a formula sheet provided by the University: nothing of your own comes in. This is for retrieval practice.

What the exam sheet gives you

A formula sheet provided by the University. Do not reproduce or predict it here. Your job is to remember the choice, timing, assumptions, interpretation and boundary around each method.

Financial decisionCash flow Opportunity costQualified decision
Source-derived C1 map: separate object, cash flow and forgone alternative before concluding.

1 · Decision LedgerC1 · C6

MoveWriteControl
1 Classifywhose decision?investment / financing / payout
2 Datevaluation date + timelinecash flow and exponent agree
3 Rateperiod + risk matchnominal ≠ effective
4 Valuevisible substitutionsign, unit, denominator
5 Judgeeconomic meaningone reversal condition

one-period NPVNPV = −C₀ + C₁/(1+r)

Boundary: an accounting entry or financing flow is not automatically an incremental project cash flow. Identify what changes because the decision is taken.

Three decisions, one value test

DecisionQuestion to answerCash-flow control
investmentwhich assets or projects should the firm take?incremental project flows and opportunity cost
financinghow should the firm fund its choices?keep financing consistent with the valuation rate
payoutwhat should be distributed?identify whose distributions and when

Opportunity cost is the value of the best forgone comparable alternative. Comparison requires a common date and a benchmark with relevant risk; a larger undated number is not enough.

2 · Rate Before ValueC2 · Financial Mathematics I

Compound rate fixes the quoted rate and compounding frequency; effective annual rate puts the economic growth on a one-year basis; present value brings a future cash flow to a stated date.

effective annual rateEAR = (1 + j/m)ᵐ − 1
j = nominal annual rate · m = compounds/year

GivenFirst moveDo not do
nominal j, mperiodic rate j/mcall j the effective rate
two rate quotesconvert to same periodcompare labels only
future cash flowmark valuation datediscount with unmatched periods
changed mrecompute EARhold EAR fixed

Boundary: a nominal rate cannot be compared with an effective rate until compounding frequency and period are aligned.

Compound ratequote j and m Effective annualrate Present valuestated date Valuation resultinterpret
Source-derived C2 figure: quote, effective rate and present value perform separate jobs before interpretation.

2b · Interpretation ChecksC2 FAQ + boundary

OutputMeaningStress
EARone-year economic growthchange compounding frequency
PVvalue at stated datechange rate or date
future valuevalue at later datecheck period count

Equal nominal percentages can have different costs because the number of compounding intervals changes the amount accumulated or discounted. State the direction and the basis of comparison, not merely the computed percentage.

Audit four things together: rate per period · number of periods · cash-flow date · valuation date. If one uses a different unit, the answer is not ready.

Single-cash-flow response

  1. Name the future cash flow and its date.
  2. Translate the quoted rate into the cash flow’s period.
  3. Move value to the requested date and label that date.
  4. Explain whether the output is a quoted rate, effective growth rate or present value.

3 · Cash-Flow ClassifierC3 · Financial Mathematics II

PatternFirst paymentHorizon / control
ordinary annuityend of first periodfinite n
annuity duetoday / period startfinite n; earlier cash flows
growing annuitydated explicitlyfinite; growth + rate
perpetuitycheck first datecontinues indefinitely
uneveneach date showndiscount separately

ordinary annuity present valuePV = PMT[1 − (1+i)⁻ⁿ]/i

Classification before formula. First payment date and horizon control the choice. An ordinary annuity, annuity due, growing annuity and perpetuity are not interchangeable.

t=0123 PMTPMTPMT ordinary: first cash flow one period after t=0
C3 timing control: ordinary-annuity payments sit at period ends, not at time zero.

3b · Method StepsC3 topic map + FAQ

  1. Draw time zero and every payment date.
  2. Mark equal versus uneven payments; finite versus indefinite horizon; constant versus growing stream.
  3. Choose the expression matching the first payment date.
  4. Use a rate with the same period as the payments.
  5. State the date of the resulting value.
If the case changes…First affected move
first payment moves to todayreclassify as annuity due
payments become unevendiscount each cash flow
finite stream becomes indefiniterecheck perpetuity assumptions
payment interval changesrealign rate period

Annuity = finite equal payments at regular intervals. Perpetuity continues indefinitely under its assumptions. Growth, timing and the discount-rate relation still require checking.

Value-date audit

Working shownWhat the marker can verify
timeline with t=0first payment and horizon
rate beside each intervalperiod alignment

4 · Bond ValuationC4 · Debt and equity valuation

Bond cash flows are coupons plus principal; yield to maturity is the discount rate that equates promised cash flows with price under stated assumptions; duration effect controls sensitivity.

bond priceP₀ = Σₜ₌₁ⁿ C/(1+y)ᵗ + F/(1+y)ⁿ

InputPlace on timelineCheck
coupon Ceach coupon daterate period matches coupon period
face value Fmaturity datedo not omit final coupon
yield ydiscount each promised flowrequired yield, not coupon rate
maturity nfinal exponentcount remaining periods

Price–yield direction: with fixed promised cash flows, a higher required yield lowers present value; a lower yield raises it.

Bond cash flowscoupons + principal Yield to maturitydiscount rate Duration effectsensitivity Bond valuequalified result
Source-derived C4 figure: cash flows, yield and duration perform separate jobs before value is interpreted.

4b · Interpret, Then QualifyC4 FAQ + boundary

ObservationSafe conclusionQualification
coupon rate > yieldprice above face value in the worked casecash flows and timing fixed
yield risesprice fallssensitivity also depends on maturity, coupons, options
computed YTMinternal rate under assumptionsnot guaranteed realised return

Boundary: yield to maturity is an internal rate under reinvestment and holding assumptions; it is not a guaranteed realised return.

List every coupon and the principal before using a shortcut. The final-period cash flow combines the last coupon and face value. State whether the price is above or below face value and connect that direction to coupon rate versus required yield.

Four-part bond explanation

  1. Write promised coupons and face value separately.
  2. Convert the yield to the coupon period when required by the case.

5 · Equity ValuationC5 · Debt and equity valuation

Dividend stream supplies expected distributions; required return discounts them; growth assumption is the control that can make a mechanical result indefensible.

Gordon growth valueP₀ = D₁/(r−g)   with r > g

QuestionUse / check
constant growth indefinitely?Gordon model only with defensible long-run growth
short-run growth differs?two-stage logic; make the transition visible
which dividend?D₁, the expected next dividend
unusual payout policy?model and horizon must match economics
small r−g spread?flag high sensitivity

Boundary: required return must exceed growth. Short-run growth cannot be extended forever by convenience.

Dividendstream Requiredreturn Growthassumption Equity value
Source-derived C5 map: distributions, discount rate and sustainable growth jointly determine value.

5b · Sensitivity LanguageC5 worked + FAQ

ChangeMechanical effectInterpretation
D₁ risesP₀ rises, other inputs fixedhigher expected distribution
r risesdenominator widens; P₀ fallshigher required return
g risesdenominator narrows; P₀ risestest sustainability
r approaches gvalue becomes very sensitivescrutinise assumptions

Finish in this order: value → dividend date → r>g check → long-run credibility → sensitivity. A positive denominator is necessary, but it does not make the growth forecast credible.

For firms with unusual payout policies or unstable growth, the source requires a model and horizon consistent with their economics. Do not force constant growth merely because it is compact.

Two-stage reasoning

6 · Capital BudgetingC6 · risk + policy

Risk-adjusted rate must be comparable to project risk; incremental cash flow captures only the change caused by the project; capital structure controls financing consistency.

net present valueNPV = −C₀ + Σₜ₌₁ⁿ CFₜ/(1+r)ᵗ

BuildQuestionFailure mode
cash flowsdoes this change if project proceeds?accounting or financing flow treated as incremental
ratedoes r match project risk?unrelated required return
financingis it embedded in valuation?same financing cost counted twice
decisiondoes NPV support acceptance?number stated without conditions
sensitivitywhat could reverse sign?varying immaterial inputs
Incremental CFRisk rateFinance fit? NPV decision then test a sign-reversing input
Source-derived C6 map: cash flows, risk and financing assumptions condition the recommendation.

6b · Decision BoundaryC6 topic map + FAQ

A positive model value is conditional. State the cash-flow, risk, tax and financing assumptions. Sensitivity should target variables capable of reversing the decision.

Financing policy enters through a risk-appropriate cost of capital and a valuation approach that treats financing consistently. Do not subtract financing cash flows and also embed the same cost in the discount rate.

Answer layerSentence stem
classification“This is a ___ cash-flow pattern / decision.”
working“At date 0, discount ___ at ___ because ___.”
interpretation“The result supports ___ for ___.”
boundary“This reverses if ___ changes enough to ___.”

Before finishing, compare prose, equations, table and diagram: direction, denominator, date, sign and unit must agree.

Net present value is discounted incremental project cash flow less the initial investment. Cost of capital is the required return appropriate to the risk and financing assumptions of the valued cash flows. These definitions must agree with the entries actually used.

https://www.asksia.ai/cheatsheet/usyd-finc5001 · Full FINC5001 study guide →
Forward this to your tutorial group · Shared by ________
FINC5001v2 · 2026-10-25 · side 1/2
Your exam is closed book with a formula sheet provided: nothing of your own goes in. Use this to revise, not to carry.
Semester 2 formal examination period, from 16 November 2026 (the Exams Office publishes the exact date).
FINC5001
Foundation in Finance · Retrieval Drills
The University of Sydney · Postgraduate · Semester 2, 2026
Closed-book memory sheet · formula sheet provided · Side 2 of 2
FINC5001 cheatsheet QR code – open the full FINC5001 study guide
Full guide + ask Sia
about FINC5001
SIDE 2/2   COVER → SOLVE → EXPLAIN → CHANGE ONE FACT → REPAIR THE FIRST AFFECTED STEP Self-test drills worked values are from the FINC5001 guide

7 · Drill 1 · Opportunity CostC1 worked 1.1

Prompt. Spend 50,000 now on a project returning 58,000 in one year, or place the funds elsewhere at 10%. Compare at the correct date.

Financial decisionCash flow Opportunity costFinancedecision
Source-derived C1 figure: separate the decision, cash flow and forgone alternative before comparing dates.

alternative at year 150,000(1.10) = 55,000

advantage at same date58,000 − 55,000 = 3,000

Conclusion. The project provides a 3,000 advantage at that comparison date before other risk and cash-flow adjustments. The decision is for the firm; the benchmark is the best forgone comparable alternative.

Transfer

Raise the alternative return to 18%: the alternative becomes 59,000, so the project no longer dominates on the stated one-year cash flows.

Common slipRepair
50,000 vs 58,000move both alternatives to year 1
ignore riskqualify before recommending
call financing incrementalask what changes because of project
Cover test → Can you state actor, comparison date, benchmark and qualifying risk without looking?

8 · Drill 2 · Effective RateC2 worked 2.1

Prompt. Nominal 12% per year, compounded monthly. Compute EAR.

periodic rate = 0.12/12 = 0.01
EAR = (1.01)¹² − 1 ≈ 0.126825
EAR ≈ 12.6825%

8b · Rate Transfer + DiagnosticsC2 changed case

Compound rate12% nominal Changed conditionmonthly → quarterly Present valuerecheck use Qualified resultEAR falls
Source-derived C2 changed-condition figure: fewer compounding intervals lower EAR at the same nominal quote.

9 · Drill 3 · Ordinary AnnuityC3 worked 3.1

Prompt. Three-year ordinary annuity; 500 at each year-end; 5% per year. Compute PV.

Annuity case500 × 3 at 5% Annuity timingfirst at year-end Perpetuity?no: finite n=3 Cash-flow valuePV at t=0
Source-derived C3 case route: timing and finite horizon control the cash-flow value.

PV = 500/1.05 + 500/1.05² + 500/1.05³
PV ≈ 1,361.62

State the valuation date and timing classification before the answer. The ordinary-annuity factor and the term-by-term discounting must agree.

9b · Annuity Transfer CardsC3 changed case + boundary

Changed factReclassify / recalculateDirection
first 500 moves to todayannuity due: add 500 now; discount remaining twoPV higher
payments no longer equaluneven stream; discount each separatelydepends on changed amounts
stream continues indefinitelyperpetuity logic; check assumptionsfinite annuity formula no longer fits
growth introducedgrowing stream; show first payment and horizondepends on growth–rate relation
Equal regular cash flows? No → unevenYes → horizon? finite: annuity∞: perpetuity
New chooser: pattern and horizon precede the valuation expression.

Explain the changed case. Moving the first payment to today changes the timing classification. Preserve the amount, rate and remaining dates; repair only the first affected step. Earlier cash flows carry less discounting, so present value rises.

Retrieval sequence: say “finite or indefinite”, “equal or uneven”, “first payment date”, “growth or no growth”, then “rate per payment period”. Only after all five are visible should you write the valuation relationship. This sequence distinguishes an ordinary annuity, annuity due, growing annuity, perpetuity and uneven stream without guessing from keywords.

10 · Drill 4 · Bond PriceC4 worked 4.1

Prompt. Two-year annual-coupon bond; face 1,000; coupon rate 6%; yield 5%.

Bond case2 years · face 1,000 Bond cash flows60; then 1,060 Yield to maturity5% discount rate Bond valueprice at t=0
Source-derived C4 case route: cash flows and yield lead to the time-zero bond value.

P₀ = 60/1.05 + 1,060/1.05²
P₀ ≈ 1,018.59

Price is above face value because the coupon rate exceeds the required yield.

10b · Bond Judgement CardsC4 changed case + FAQ

CardPrompt yourselfAnswer control
cash flowscoupon each date? principal at maturity?last cash flow includes both
rateyield period matches coupons?do not discount at coupon rate
directionwhat if yield rises?fixed-flow price falls
premiumcoupon rate versus yield?worked price above face at 6% vs 5%
meaningis YTM realised?only an internal rate under assumptions
Bond cash flowspromised, fixed Changed conditionyield 5% → 7% Duration effectprice sensitivity Qualified resultbelow face value
Source-derived C4 changed-condition figure: raising yield to 7% puts price below face value.

Changed case. Raise the yield to 7%. Discounting at 7% gives a price below face value. The price response is inverse because the promised cash flows are fixed while required return rises.

Do not overclaim. Maturity, coupon structure and embedded options affect sensitivity. “Rates up, prices down” is the starting direction, not a complete sensitivity analysis.

Bond blank-page drill

Without notes, draw t=0, year 1 and year 2; place 60 at year 1 and 1,060 at year 2; write 5% beside both discount intervals; reconstruct 1,018.59; then change only the yield to 7% and predict the direction before calculating. Finish by explaining why YTM is not a guaranteed realised return.

11 · Drill 5 · Equity ValueC5 worked 5.1

Prompt. Expected dividend next year 3; growth 4% indefinitely; required return 10%.

P₀ = 3/(0.10−0.04) = 50

CheckPass?Why
D₁ usedyes3 is next year’s dividend
r>gyes10% > 4%
spread6 percentage pointsdenominator remains positive
horizonindefiniteconstant-growth assumption must be defensible

Conclusion: value 50 under the long-run growth and required-return assumptions. A correct calculation still needs the assumption boundary.

11b · Growth Stress + NPV DrillC5 + C6 worked

Equity caseD₁=3 · r=10% Dividend streamgrowth 4% → 9% Required returnspread narrows Equity value50 → 300
Source-derived C5 case route: raising growth narrows the spread and makes value highly sensitive.

Equity transfer. Raise long-run growth to 9% while required return stays 10%: value becomes 300. The positive one-point spread passes r>g mechanically but creates extreme sensitivity; do not accept it without stronger scrutiny.

Capital-budgeting worked case

Prompt. Project costs 100,000; returns 60,000 after one year and 55,000 after two years; rate 8%.

Project case−100k; 60k; 55k Risk-adjusted rate8% then 12% Incremental CFvisible dates Recommendationsign can reverse
Source-derived C6 case route: incremental cash flows and a risk-matched rate determine the recommendation.

NPV = −100,000 + 60,000/1.08 + 55,000/1.08²
NPV ≈ 2,709.19

The positive value supports acceptance only if the cash flows are incremental and 8% matches project risk.

stress the rateat 12%, NPV ≈ −2,582.91 → decision reverses

NPV auditWorked case answer
valuation datetime zero
initial sign−100,000 outlay

12 · Method Chooserall chapters

What must be valued? One CFPV / NPV Streamannuity? BondC + F EquityD₁, r, g Every route: date → rate period + risk→ calculate → interpret → boundary
New method chooser: classify the cash-flow object before selecting a supplied relationship.
Signal in promptMethod familyMust say
nominal rate + mEARperiod alignment
equal finite streamannuityfirst payment date
coupons + face valuebond priceyield and final cash flow
D₁ + constant gGordonr>g + sustainability
initial outlay + project CFNPVincremental CF + risk rate
alternative use of fundsopportunity costcompare at same date

13 · Trap Ledgertopic boundaries + FAQ

TrapRepair sentence
formula before timeline“First payment is at ___; value is at ___.”
nominal = effective“Convert with j and m before comparing.”
ordinary = due“A payment at time zero changes classification.”
coupon rate = yield“Coupons set cash flows; yield discounts them.”
D₀ in Gordon numerator“The model uses expected D₁.”
positive NPV = unconditional“Accept only under incremental-CF and risk assumptions.”
financing counted twice“Keep financing consistent with the valuation approach.”
sensitivity without decision“Change an input capable of reversing the conclusion.”

Fast-recall definitions

TermSay it precisely
present valuevalue at a stated date of future cash flows discounted at a required return
EARone-year growth after within-year compounding
annuityfinite equal payments at regular intervals
YTMrate equating promised bond flows with price under stated assumptions
NPVdiscounted incremental project flows less initial investment
cost of capitalrequired return matched to risk and financing assumptions

14 · Exam-Morning Plancourse study strategy

RetrieveApplyChangeRepair definitions → mechanism → check → boundary record the first failed move, not the whole answer
Source study cycle: retrieval, changed-case transfer and targeted repair.
  1. Blank-page rebuild: draw the six method routes and write each boundary from memory.
  2. Recompute anchors: 12.6825%; 1,361.62; 1,018.59; 50; 2,709.19.
  3. Say the meaning: one sentence for the actor, valuation date and decision.
  4. Change one fact: m, first payment, yield, growth or project rate.
  5. Repair first failure: classification, timing, rate, cash flow, working or interpretation.
30-second verbal checkRequired words
time valuevaluation date · period · present value
annuityequal · finite · first payment
bondcoupon · principal · yield · assumptions
equityD₁ · required return · sustainable growth
projectincremental · risk-adjusted · NPV · reversal

15 · Final Answer Auditall chapters

Classification: did I name the model or cash-flow pattern?

Timeline: does each cash flow have a date and sign?

Rate: same period, appropriate risk, correct quote?

Working: visible substitution through the result?

Interpretation: whose value or decision changes?

Boundary: which assumption could reverse or weaken it?

Consistency: prose, equation, table and diagram agree on direction, denominator, date, sign and unit?

Six prompts to answer aloud

  1. What is the best forgone comparable alternative?
  2. Why can equal nominal rates produce different effective costs?
  3. What single fact distinguishes an annuity due from an ordinary annuity?
  4. Why does a higher yield lower a fixed-cash-flow bond price?
  5. Why does a narrow r−g spread demand stronger scrutiny?
https://www.asksia.ai/cheatsheet/usyd-finc5001 · Full FINC5001 study guide →
Forward this to your tutorial group · Shared by ________
FINC5001v2 · 2026-10-25 · side 2/2
Your exam is closed book with a formula sheet provided: nothing of your own goes in. Use this to revise, not to carry.
Semester 2 formal examination period, from 16 November 2026 (the Exams Office publishes the exact date).

Want one for YOUR exact syllabus?

Sia is your free desktop study agent. Drop your University of Sydney FINC5001 slides — Sia builds a sheet tailored to YOUR exam. Better than this library because it knows YOUR materials.

↓ Download Sia · Free