Technology Leadership, Testing and Contracting

Testing, buying and leading

Week 10 covers technology leadership, test management, and technology selection and contracting.

This chapter explains test levels and the V-model, which pairs each design level with the test that checks it.

Suppliers and teams

It walks through selecting a supplier and choosing between fixed-price and time-and-materials contracts, and closes with leadership as network building, drawing on the readings on project networks and owner capabilities.

One theme across three topics

Testing, contracting and leadership share a theme: they are where accountability is tested in practice.

Exit criteria decide whether a system is ready, contract terms decide who bears which risk, and leadership decides whether problems surface early. In each case the owner, not the supplier or the test team, carries the final business decision.

Common errors on this topic

Students often describe testing as a single phase at the end, rather than a set of levels planned alongside design.

In contracting, a frequent slip is choosing a fixed price for uncertain work. In leadership questions, answers that describe personal qualities without any action on people, priorities or relationships tend to score poorly.

In this chapter

What this chapter covers

  • 01

    Unit, integration, system and acceptance testing

  • 02

    The V-model

  • 03

    Test plans and exit criteria

  • 04

    Technology selection steps

  • 05

    Fixed price versus time and materials

  • 06

    Relational capability with suppliers

  • 07

    Leadership as network building

Worked example · free

Set exit criteria for a go-live decision

Q [4 marks]. AskSia-authored practice. A council's new rates system is due to go live in two weeks. Propose three exit criteria for testing and say who should make the go-live call. The marks shown are an AskSia study allocation, not an official University marking scheme.
In the V-model each design level on the left is paired with a test level on the right: integration tests check the detailed design, system tests check the systeIn the V-model each design level on the left is paired with a test level on the right: integration tests check the detailed design, system tests check the system design, and acceptance tests check the original requirements.RequirementsSystem designDetailed designAcceptance testSystem testIntegration testBuild and unit testeach test checksthe design opposite
In the V-model each design level on the left is paired with a test level on the right: integration tests check the detailed design, system tests check the system design, and acceptance tests check the original requirements.
  • 1No open critical or high-severity defects, with workarounds agreed for any lower-severity ones.
  • 1All user acceptance scenarios for billing, payments and notices passed by finance staff.
  • 1A successful rehearsal of data migration and of rollback to the old system.
  • 1The go-live decision sits with the project owner and steering committee, advised by the test manager.
Three measurable criteria covering defects, acceptance and migration give an objective basis for the decision. The owner makes the call, because go-live risk is a business risk, not only a technical one.
Sia tip — Write exit criteria that someone else could check as pass or fail; a feeling of readiness is not a criterion.
Glossary

Key terms

User Acceptance Testing
Testing in which the business confirms a system meets its needs before go-live.
V-Model
A testing model that pairs each design level with the test level that verifies it.
Exit Criteria
The conditions that must be met before a test phase is declared finished.
Fixed-Price Contract
A contract in which the supplier delivers agreed scope for an agreed price, bearing cost risk.
FAQ

Technology Leadership, Testing and Contracting FAQ

What is the V-model in testing?

It pairs each design level with the test that checks it: unit tests with components, integration tests with detailed design, system tests with system design and acceptance tests with requirements. Tests are planned when the matching design is written.

When should a buyer choose time and materials over a fixed price?

When requirements are uncertain or likely to evolve. A fixed price on unclear work tends to be padded or disputed, while time and materials keeps flexibility, with the buyer carrying cost risk.

Can an organisation outsource accountability for results?

No. Zwikael and Meredith warn that contracts usually cover outputs only, so the buying organisation keeps accountability for the benefits the technology was bought to deliver.

What should a test plan contain?

Scope, approach, environments, test data, roles and exit criteria, the conditions under which testing is finished, such as no open critical defects. Defects are logged, prioritised, fixed and retested against those criteria.

How should technology suppliers be selected?

Define the need from the business case, package the work sensibly, invite proposals against published criteria, verify claims through demonstrations on your own scenarios and reference checks, then negotiate a contract type that fits the uncertainty.

What is relational capability in contracting?

The ability to build working relationships with suppliers alongside the formal contract. Winch and Leiringer note that owners choose a mix of formal control and trust within procurement rules, and good relationships surface problems earlier than contract reporting does.

Why is late testing costly?

Defects found late have already been built into designs and code that depend on them, so they take longer to fix. Dvir and Lechler cite a finding that 43% of defects in research and development projects were not found until after testing.

Study strategy

Exam move

Draw the V-model from memory, then practise choosing a contract type for three different requirement situations and justifying each in two sentences. Prepare one example of a go-live decision and say who should make it and on what evidence.

Working through Technology Leadership, Testing and Contracting in MGMT7020? Sia is AskSia’s AI Project Management tutor — ask any MGMT7020 Technology Leadership, Testing and Contracting question and get a clear, step-by-step explanation grounded in how MGMT7020 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 48 of your Australian National University subjects - and 1,000+ Bibles across every Australian university.
Sia - your MGMT7020 tutor, unlimited, worked the way the exam marks it
The full 3-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works