RMIT University · FACULTY OF ACCOUNTING

ACCT1054 Chap.2 Asset Measurement, Revaluation and Impairment

- one subject, every graph, every model, every mark
5 Chapters4-page Bible
Our own words - no uploaded lecturer files
Updated for this semester
Chapter 2 of 11 · ACCT1054

Asset Measurement, Revaluation and Impairment

Asset measurement follows a timeline from recognised cost through depreciation to revaluation or impairment at a later date. This chapter keeps cost, carrying amount, fair value and recoverable amount distinct. It also shows how an asset-specific revaluation surplus changes the destination of later increases or decreases and why recoverable amount uses the higher recovery route.

In this chapter

What this chapter covers

  • 01

    Directly attributable initial cost

  • 02

    Cost and revaluation models

  • 03

    Pre-event carrying amount

  • 04

    Recoverable amount and impairment loss

  • 05

    Revaluation surplus direction and reversals

Worked example · free

Build carrying amount before impairment

Q [4 marks]. A machine costs $504,000, has a six-year life and a year-end recoverable amount of $392,000. Calculate depreciation and impairment. The mark allocation used here supports revision and is not the university's published assessment scheme.
Depreciation precedes the impairment comparison.Cost of 504 thousand less 84 thousand depreciation gives 420 thousand, which falls to recoverable amount 392 thousand through a 28 thousand impairment.Cost $504k-Deprec. $84k=Before test$420kLoss $28kRA $392k
The bridge deducts $84,000 depreciation before comparing $420,000 carrying amount with $392,000 recoverable amount, producing a $28,000 impairment.
  • +1Annual depreciation is $84,000.
  • +1Pre-test carrying amount is $420,000.
  • +1Impairment loss is $28,000.
  • +1Closing carrying amount is $392,000.
Record $84,000 depreciation and a $28,000 impairment loss, leaving the machine at $392,000. Depreciation must be posted first because the recoverable-amount comparison uses the current pre-impairment carrying amount, not original cost or last year's balance. Chronology controls the measurement proof.
Sia tip — Calculate carrying amount immediately before the test; comparison with acquisition cost is usually wrong.
Glossary

Key terms

Carrying amount
Carrying amount is the recognised balance after accumulated depreciation, impairment and other adjustments.
Recoverable amount
Recoverable amount is the higher of value in use and fair value less costs of disposal.
Revaluation surplus
Revaluation surplus records qualifying upward revaluation movements through other comprehensive income.
FAQ

Asset Measurement, Revaluation and Impairment FAQ

Which recoverable amount candidate do I use?

Use the higher of value in use and fair value less costs of disposal. The entity can recover the asset through the better available route, so choosing the lower amount would overstate impairment.

Where does a revaluation decrease go?

It normally enters profit or loss, except to the extent an asset-specific revaluation surplus can absorb it. Review the asset's revaluation history before deciding the destination.

What happens after an impairment?

The asset closes at recoverable amount and future depreciation uses the revised carrying amount over the remaining useful life. Later reversals remain limited by the no-impairment carrying amount.

Study strategy

Exam move

Draw an asset timeline for every problem. Write recognised cost, depreciation to date, pre-event carrying amount, measurement comparison and closing amount in separate boxes. Keep a small revaluation-surplus ledger beside the timeline to check profit or loss versus other comprehensive income. Start revision with acquisition-cost sorting.

Take a list of expenditures and justify why each amount is directly attributable, excluded, or recognised later. Do not accept a correct total unless every inclusion has a reason. Then build three carrying-amount schedules that change only one fact at a time: useful life, residual value or acquisition date. This trains the time basis before revaluation and impairment add another layer. For revaluation, keep two linked ledgers.

The first carries the asset from opening amount to fair value; the second tracks the remaining asset-specific surplus. Work an upward movement with no prior decrease, an upward movement reversing a prior decrease, and a downward movement that exceeds the available surplus. Say the destination before writing the entry. For impairment, always write both recovery candidates and circle the higher one.

Compare it with carrying amount only after current depreciation has been recorded. Add a line explaining why the selected amount represents the better recovery route. When cash-generating units appear, define the smallest independent inflow boundary from the facts and list which assets belong inside it. Practise allocating a unit loss and apply individual asset floors rather than reducing balances mechanically.

For reversals, calculate the no-impairment carrying amount before deciding the ceiling. End every problem with two forward checks: the revised amount becomes the new depreciation base, and the remaining useful life rather than the original life controls future allocation.

Keep a mistake log organised by direction word: higher recoverable amount, asset-specific surplus, profit or loss, other comprehensive income, and reversal ceiling. Rework only the line that created each error, then redo the entire schedule without notes. Add class-wide revaluation cases so you remember that a policy applies to a class rather than a hand-picked asset.

Practise gross and net presentation methods only to the extent taught, keeping the final carrying amount identical. Work a cash-generating-unit example with goodwill and write the allocation order beside the numbers. Then reverse conditions in a later period and identify which losses can be reversed and which cannot.

Compare value-in-use assumptions with fair-value evidence and list the disclosure consequences of significant estimation uncertainty. On a blank page, reconstruct the full path from purchase price to closing carrying amount without looking at entries. If the schedule does not reconcile, locate the first date at which it diverges rather than balancing the final line.

In the final week, mix cost, revaluation and impairment facts in one timeline so you practise identifying which event controls each entry.

Working through Asset Measurement, Revaluation and Impairment in ACCT1054? Sia is AskSia’s AI Accounting tutor — ask any ACCT1054 Asset Measurement, Revaluation and Impairment question and get a clear, step-by-step explanation grounded in how ACCT1054 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 13 of your RMIT University subjects - and 1,000+ Bibles across every Australian university.
Sia - your ACCT1054 tutor, unlimited, worked the way the exam marks it
The full 4-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works
ACCT1054 · Financial Accountability and Reporting - independent study guide on the AskSia Library. More RMIT University subjects · Microeconomics across all universities