Designing the process, not just the product

The second Week 2 lecture argues that processes must be designed as carefully as the products and services they deliver. Process types are set by the volume and variety of what they handle: project, jobbing, batch, line and continuous for manufacturing, and professional service, service shop and mass service for services.

No single type suits every situation.

Measuring flow

Four measures describe how units move: throughput time, throughput rate, work in process and utilisation. Required cycle time is available time divided by demand, staffing is work content divided by cycle time, and Little's law ties throughput time to work in process and cycle time.

The lecture stresses that this relationship holds however volatile conditions become.

Managing the bottleneck

Optimised production technology, drawn from Goldratt's work, focuses attention on the stage with the least capacity. Lost time there is lost for the whole system, while time saved at other stages achieves nothing.

Schedules should keep the bottleneck fully loaded and feed the rest only at its pace, and improvement should target the constraint first. After any improvement it is worth checking whether a different stage has become the slowest, as the worked example shows.

In this chapter

What this chapter covers

  • 01

    Volume and variety process types

  • 02

    Manufacturing and service process names

  • 03

    Throughput time, rate, work in process and utilisation

  • 04

    Required cycle time and staffing

  • 05

    Little's law

  • 06

    Bottlenecks and optimised production technology

Worked example · free

Find the bottleneck from minutes per bike at each repair stage

Q [6 marks]. AskSia-authored practice. A bike workshop has three stages with effective minutes per bike of 6 to inspect, 10 to repair with two mechanics and 8 to road test. With a third mechanic, repair falls to 6.67 minutes. Identify the bottleneck before and after, the hourly output in each case, and the throughput time with 30 bikes in the shop. Any marks attached here are an AskSia practice weighting and not an official University scheme.
Figure 3.1.Figure 3.1. Effective minutes per bike at each repair stage, with blue bars for two mechanics and orange bars for three; the outlined bar is the bottleneck, which moves from repair at 10 minutes to the road test at 8 minutes once the third mechanic arrives.66106.6788InspectRepairTestMinutes per bikeTwo mechanicsThree mechanics
Figure 3.1. Effective minutes per bike at each repair stage, with blue bars for two mechanics and orange bars for three; the outlined bar is the bottleneck, which moves from repair at 10 minutes to the road test at 8 minutes once the third mechanic arrives.
  • 2Before: repair at 10 minutes is the bottleneck, so output is 60 ÷ 10 = 6 bikes an hour.
  • 2After: test at 8 minutes is slowest, so output rises to 60 ÷ 8 = 7.5 bikes an hour.
  • 2Throughput time = 30 × 10 = 300 minutes before and 30 × 8 = 240 minutes after.
The third mechanic lifts output by a quarter and cuts the time a bike spends in the shop from five hours to four. The constraint now sits at the road test, so the next improvement should target testing, not repair.
Sia tip — Before adding staff anywhere, find the stage with the longest effective minutes per unit; only that change raises output.
Glossary

Key terms

Cycle Time
The average interval between successive units leaving a process; its reciprocal is the throughput rate.
Work in Process
The average number of units inside a process at any moment over a period.
Throughput Time
How long one unit takes to move through a process from entry to exit.
Mass Service
A high-volume service type with limited customer contact, customisation and staff discretion.
Optimised Production Technology
Goldratt's approach of scheduling and improving a system around its bottlenecks.
FAQ

Process Types, Flow Measures and Bottlenecks FAQ

What decides which process type an operation should use?

Volume and variety. Low-volume, high-variety work suits project or jobbing processes in manufacturing and professional services among services; repeated runs of standard items suit batch; high-volume standard output suits line or continuous processes and mass services. The lecture notes that the position influences almost every other design choice. Mismatched choices show up as high cost or poor flexibility.

How is required cycle time calculated?

Divide the productive time available in a period by the demand expected in that period. For instance, 480 minutes of working time against 160 expected orders means one order must be completed every three minutes. Dividing the work content of each unit by that cycle time then gives the number of staff or stations required.

What does Little's law say?

For a stable process, throughput time equals work in process multiplied by cycle time. More units waiting inside the process therefore means a longer wait for each one unless the cycle time falls. The lecture presents it as a dependable link between flow, time and inventory even in turbulent conditions.

Why is an hour saved at a non-bottleneck called a mirage?

Output is limited by the slowest stage. Speeding up a stage before the constraint only makes work arrive sooner and queue there, so the system produces no more and simply holds more inventory; a faster stage after it just waits longer for work. Only improvements at the bottleneck raise output.

What is a service shop?

It sits between professional and mass services, with medium customer volumes and mixed levels of contact, customisation and staff discretion. High-street banks, shops, car rental firms and hotels are typical. Its processes must handle some variety without losing the efficiency that its volume requires. Opticians and travel agents fit the same pattern.

Study strategy

Exam move

Learn the three flow relations until you can write them without hesitation: cycle time from available time and demand, staffing from work content and cycle time, and Little's law. Then invent a three-stage process of your own, give each stage a time and a number of workers, and find the bottleneck, the hourly output and the throughput time. Change one stage at a time and record whether output moves.

This drill builds the habit of locating the constraint before recommending investment, which is the reasoning the decision-making half of the module extends. For process types, write one example per type from your own experience and say which volume and variety features place it there. Close by stating the rule about non-bottleneck savings in your own words and testing it on a fresh example.

Working through Process Types, Flow Measures and Bottlenecks in 38004? Sia is AskSia’s AI Management tutor — ask any 38004 Process Types, Flow Measures and Bottlenecks question and get a clear, step-by-step explanation grounded in how 38004 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 17 of your subjects at University of Birmingham, plus 1,000+ more Bibles across the AskSia library.
Sia - your 38004 tutor, unlimited, worked the way the exam marks it
The full 4-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works
38004 · Organisational Decision Making and Operations Management - independent study guide on the AskSia Library. More University of Birmingham subjects · Microeconomics across all universities