The University of Edinburgh · FACULTY OF ENGINEERING

PGEE11213 Chap.2 Error, Uncertainty and Measurement Decisions

- one subject, every graph, every model, every mark
6 Chapters4-page Bible
Our own words - no uploaded lecturer files
Updated for this semester
Chapter 2 of 8 · PGEE11213

Error, Uncertainty and Measurement Decisions

Keep error, correction and uncertainty separate

Error is the difference between an indication and a reference value, although the exact error is generally unknown. A correction compensates for a recognised systematic effect. Uncertainty describes the dispersion of values reasonably attributable to the measurand.

These ideas require different actions, so using one word for all three hides the measurement model.

Combine standard contributions through the model

Express each contribution as a standard uncertainty, apply its sensitivity coefficient and include covariance when inputs are dependent. Independent terms combine by root-sum-square. Expanded uncertainty multiplies the combined value by a stated coverage factor.

The budget should reveal which contribution dominates and where process improvement will matter.

Make the conformity rule explicit

Tolerance limits describe acceptable product geometry, while the uncertainty interval qualifies knowledge of the result. When that interval crosses a specification limit, the central estimate cannot settle conformity by itself.

Apply an agreed decision rule or guard band and state the resulting risk rather than silently ignoring uncertainty.

In this chapter

What this chapter covers

  • 01

    Error and correction

  • 02

    Type A evaluation

  • 03

    Type B evaluation

  • 04

    Sensitivity coefficients

  • 05

    Combined uncertainty

  • 06

    Conformity decisions

Worked example · free

Combine an uncertainty budget

Q [6 marks]. AskSia-authored practice. Standard uncertainties are 0.012 mm, 0.008 mm and 0.005 mm and may be treated as independent. Find combined standard uncertainty and expanded uncertainty for coverage factor 2. The marks shown are an AskSia study allocation, not an official University marking scheme.
Uncertainty belongs to the reported result, while limits belong to the specification.Uncertainty belongs to the reported result, while limits belong to the specification. The central estimate and its interval must be compared with both acceptance boundaries before a decision is made. reported intervalestimate ± expanded uncertainty lower limitupper limit the interval and tolerance answer different questions
Uncertainty belongs to the reported result, while limits belong to the specification. The central estimate and its interval must be compared with both acceptance boundaries before a decision is made.
  • 2Square the three standard contributions and add them.
  • 2Take the square root to obtain 0.0153 mm combined uncertainty.
  • 2Multiply by 2 and report expanded uncertainty as 0.031 mm.
u_c = √(0.012² + 0.008² + 0.005²) = 0.0153 mm. With k = 2, U = 0.0306 mm, reported as 0.031 mm. The 0.012 mm contribution has the largest squared influence and is the first candidate for improvement.
Sia tip — Standardise every contribution before combining and keep the coverage factor outside the root-sum-square.
Glossary

Key terms

Correction
A Correction is an estimated adjustment applied to compensate for a recognised systematic effect.
Combined Uncertainty
Combined Uncertainty propagates standard contributions through the measurement model into one standard uncertainty.
Guard Band
A Guard Band narrows an acceptance region to control decision risk when measurement uncertainty is material.
FAQ

Error, Uncertainty and Measurement Decisions FAQ

Why are independent uncertainties combined by root-sum-square?

Independent standard contributions represent dispersion from separate mechanisms, so their variances add through the measurement model. Taking the square root returns the result to the unit of the measurand. Direct addition is a different conservative rule and should not be used without stating why it fits the decision.

What should happen when an uncertainty interval crosses a limit?

Report the estimate and expanded uncertainty, then apply the agreed conformity rule. The next action may be a guard band, improved measurement, rework or documented risk decision. Repeating the same setup only helps when short-term scatter is important; it does not remove calibration, alignment or model uncertainty.

How can an uncertainty budget improve a process?

Compare the squared contribution of each standard term to the total and target the mechanism with the largest leverage. Recompute the budget after a realistic improvement to estimate benefit. Reducing an already small term may be easy but will barely change the combined result or the conformity decision.

Why must the coverage factor be reported?

Expanded uncertainty cannot be interpreted from the numerical width alone because the coverage factor links the combined standard uncertainty to an intended level of coverage. A statement such as U = 0.12 mm is incomplete if it omits the factor, assumptions and units. Record the combined standard uncertainty, selected coverage factor, resulting expanded uncertainty and the confidence convention or distribution basis.

When effective degrees of freedom or a non-normal model changes the factor, preserve that calculation too. This lets a reviewer compare results consistently and prevents the expanded interval from being mistaken for a guaranteed error bound.

Study strategy

Assessment move

Rebuild one uncertainty budget without a spreadsheet. Write the measurement model, convert each input to a standard uncertainty, apply sensitivity coefficients and combine the terms. Then halve the dominant contribution and recompute the result. Finish with a conformity case whose uncertainty interval crosses a limit, and write the exact decision rule needed rather than declaring a pass or fail from the central estimate.

Make a source column for every contribution and state why its distribution and divisor apply. Change one rectangular contribution to a normal contribution with the same quoted half-width and observe how the budget changes; this exposes why a memorised divisor is unsafe. Work another example with a sensitivity coefficient that carries units, then check dimensional consistency before calculating.

Create three conformity diagrams: an interval fully inside limits, one crossing a limit and one fully outside. For each, write the action under a conservative rule and explain the producer or consumer risk. Finally, choose the largest squared contribution and propose a physical experiment that separates its likely causes. Update the budget only after the experiment produces evidence.

Keep the original and revised versions together so the claimed improvement can be reconstructed rather than inferred from a smaller final number. Extend the model with two correlated inputs and explain why adding their variances as independent terms can understate or overstate the result. You do not need a complex covariance example to learn the principle: identify the shared physical cause and predict the sign of association.

Next, audit rounding by reporting the uncertainty with sensible significant figures and matching the estimate decimal place. Compare that result with a version rounded at every intermediate step. Finish by explaining the budget aloud without reading labels. If you cannot identify the physical mechanism behind a row, the row is not yet understood well enough to defend in coursework or process review.

A+Everything unlocked
Unlocks this Bible + all 10 of your subjects at The University of Edinburgh, plus 1,000+ more Bibles across the AskSia library.
Sia - your PGEE11213 tutor, unlimited, worked the way the exam marks it
The full 4-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works