The University of Edinburgh · FACULTY OF ENGINEERING

PGEE11213 Chap.8 Inspection Analysis and Reporting

- one subject, every graph, every model, every mark
6 Chapters4-page Bible
Our own words - no uploaded lecturer files
Updated for this semester
Chapter 8 of 8 · PGEE11213

Inspection Analysis and Reporting

Analysis must retain its reference

Colour maps, feature tables and deviation markers gain meaning from alignment, units, sign convention, filtering and tolerance. A broad green region is not a complete decision when the legend, point coverage or critical extrema are hidden.

Preserve numerical evidence at the features and locations that control acceptance.

Build the report list deliberately

A measurement file can contain setup checks, construction geometry and final characteristics. Include the features required to reconstruct the decision, order them around the inspection plan and make exceptions visible.

Excluding a failing item changes the report, not the component.

Control released versions

Dynamic report data can change when the measurement file changes. Identify the measurement-file revision, report template, software version and approval state. Regenerate and reapprove after edits to alignment, tolerances or features, and retain superseded output rather than overwriting the released record.

In this chapter

What this chapter covers

  • 01

    Deviation legends

  • 02

    Feature selection

  • 03

    Decision rules

  • 04

    Report exceptions

  • 05

    Revision control

  • 06

    Manufacturing action

Worked example · free

Summarise a mixed inspection result

Q [6 marks]. AskSia-authored practice. Seven characteristics pass and one surface profile reaches +0.34 mm against a +0.30 mm boundary. Draft the report summary and action. The marks shown are an AskSia study allocation, not an official University marking scheme.
An inspection report is the final link in a traceability chain.An inspection report is the final link in a traceability chain. Selected features, decision rules and reported claims must remain connected to the current measurement file and its documented transformations. measurement fileraw and derived feature listselected evidence decision rulelimits and risk reportauditable claim updates must preserve the evidence-to-decision chain
An inspection report is the final link in a traceability chain. Selected features, decision rules and reported claims must remain connected to the current measurement file and its documented transformations.
  • 2Name the nonconforming characteristic and 0.04 mm exceedance.
  • 2State the datum alignment, filter and feature location.
  • 2Require verification and the authorised nonconformance process.
Report that one surface-profile characteristic exceeds the positive boundary by 0.04 mm while the other seven evaluated characteristics conform. Identify alignment, filter, station and measurement-file revision. Verify the local capture and transformation, then route the confirmed exception through the authorised manufacturing process.
Sia tip — Put the exception and controlling boundary on the first page, not only in an appendix.
Glossary

Key terms

Deviation Map
A Deviation Map groups signed distances between measured and nominal geometry into a labelled colour scale.
Report List
A Report List is the controlled selection and order of features included from a measurement file.
Released Version
A Released Version is an approved immutable report tied to identified source data and configuration revisions.
FAQ

Inspection Analysis and Reporting FAQ

What must a deviation map show?

Show the numerical colour legend, units, sign convention, alignment and enough point coverage to interpret the surface. Add markers at critical locations and extrema. Colour alone should not imply conformity; connect the numerical deviations with the exact tolerance and decision rule in the accompanying table or text.

Why should failing features remain in the report list?

The report list selects which measurement-file features reach the reader. Removing a failing item changes the evidence surface and can create a false summary. Include every controlled characteristic required by the inspection plan, reconcile feature totals and make exceptions visible on the first decision page.

How should a report change after the measurement file is edited?

Regenerate the report from the controlled measurement-file revision, recheck feature totals and exceptions, obtain the required approval and issue a new report revision. Retain the superseded version. Do not silently overwrite a released PDF, because the earlier decision must remain traceable to the data and settings used.

How can a report checklist be tested?

Give the draft report and its referenced evidence to a reviewer who did not perform the measurement. The reviewer should identify the component and drawing revision, reconstruct the datum and alignment, locate raw and processed files, verify units and tolerance boundaries, reproduce each reported value and follow the decision rule to the same conclusion.

Deliberately sample one conforming and one nonconforming feature, plus any guarded or uncertain result. Record discrepancies as method failures, not editorial preferences, and correct the underlying file linkage or calculation before release. A checklist is effective only when it demonstrates reproducibility and traceability under independent use.

Study strategy

Assessment move

Take a sample inspection page and cover its legend, alignment statement and units. Explain why the remaining image cannot support a decision, then restore each item and identify its job. Build a one-page report outline from component identity through exceptions and action. Finally, simulate a changed tolerance or feature list and write the version-control steps required before releasing a corrected report.

Reconcile the number of controlled characteristics in the inspection plan, measurement file, report list and summary; a mismatch should stop approval. Select one reported value and trace it backwards through feature construction, filtering, alignment and raw capture. Next, remove one known exception from a controlled draft and confirm that the checklist detects the missing item through totals or summary status.

Restore it and recheck. Practise separating observation from cause by rewriting “tool wear caused the error” as a signed geometric finding plus tests that could distinguish tool wear, fixturing and capture artefact. Close with three ending sentences: one conforming, one nonconforming and one inconclusive. Each should name scope, controlling evidence, owner of the next action and the record that will be updated.

Add a revision exercise in which only the report template changes, then another in which the tolerance changes. Explain why the first may be editorial while the second can reverse conformity. Create an exception table with characteristic, signed result, limit, exceedance, location and verification status. Verify that every row appears in the first-page summary.

End by exporting a draft and reviewing that exported file rather than the editable source; check labels, page order, plots, appendix links and revision identity as the final reader will see them.

A+Everything unlocked
Unlocks this Bible + all 10 of your subjects at The University of Edinburgh, plus 1,000+ more Bibles across the AskSia library.
Sia - your PGEE11213 tutor, unlimited, worked the way the exam marks it
The full 4-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works