University of Glasgow · FACULTY OF ACCOUNTING

ACCFIN5024 Chap.5 Initial Cost of PPE and Borrowing Costs

- one subject, every graph, every model, every mark
7 Chapters4-page Bible
Our own words - no uploaded lecturer files
Updated for this semester
Chapter 5 of 10 · ACCFIN5024

Initial Cost of PPE and Borrowing Costs

Initial Cost of PPE and Borrowing Costs covers the IAS 16 definition and recognition of property, plant and equipment and the three components of cost: purchase price less trade discounts, directly attributable costs, and dismantling at present value. A cost build-up shows which items are capitalised and which are expensed, using the include, exclude and reason routine from the tutorial solutions.

The chapter then applies IAS 23 to specific and general borrowings, the capitalisation period and later spending on components and inspections. The chapter closes with how capitalised interest changes cash flow classification and interest cover, which matters when you compare companies that build their own assets with companies that buy them ready-made.

In this chapter

What this chapter covers

  • 01

    IAS 16 definition and recognition of PPE

  • 02

    Purchase price, attributable costs and dismantling

  • 03

    Costs excluded from PPE

  • 04

    Qualifying assets and IAS 23

  • 05

    Capitalisation rate for general borrowings

  • 06

    Subsequent costs, components and major inspections

  • 07

    Capitalised interest in cash flows and interest cover

Worked example · free

Build up the IAS 16 cost of a filling machine

Q [6 marks]. A bottler buys a machine with a list price of £240,000 and a 5% trade discount. It pays import duty £9,600, refundable VAT £48,000, delivery £3,400, installation and testing £7,800, an installing engineer's salary £4,200, operator training £2,900 and a launch event £1,500. The present value of the site restoration obligation is £15,000. Find the cost. The step marks are not an official marking scheme; we set them for practice.
Starting from the list price, the trade discount is removed and each directly attributable cost and the present value of dismantling is stacked on, so the machiStarting from the list price, the trade discount is removed and each directly attributable cost and the present value of dismantling is stacked on, so the machine in the next worked example carries a cost of £268,000; costs that do not belong never enter the bars.List priceDiscountImport dutyDeliveryInstallationEngineerDismantling PVCost£268,000vertical axis starts at £200,000
Starting from the list price, the trade discount is removed and each directly attributable cost and the present value of dismantling is stacked on, so the machine in the next worked example carries a cost of £268,000; costs that do not belong never enter the bars.
  • 2Purchase price less trade discount plus import duty: 240,000 − 12,000 + 9,600 = £237,600.
  • 2Add directly attributable costs: delivery £3,400, installation £7,800 and the engineer £4,200, giving £253,000.
  • 1Add the present value of the restoration obligation, £15,000, because it arises on acquisition: cost £268,000.
  • 1Exclude refundable VAT, operator training and the launch event, which are not costs of the machine.
The machine is recognised at £268,000; VAT, training and the launch are excluded.
Sia tip — Write include or exclude beside every line before totalling, and cite the IAS 16 category that justifies it.
Glossary

Key terms

Qualifying asset
An asset that necessarily takes a substantial period to get ready for use or sale.
Capitalisation rate
The weighted average cost of general borrowings applied to spending on a qualifying asset.
Directly attributable cost
A cost without which the asset could not reach its site and working order.
Trade discount
A reduction in the list price that is deducted from the cost of an asset.
Major inspection
A periodic overhaul capitalised as a component while the previous inspection is derecognised.
FAQ

Initial Cost of PPE and Borrowing Costs FAQ

Is staff training part of the cost of a machine?

No. IAS 16 excludes training and other costs of doing business in a new way, and the tutorial solution adds that staff are not controlled by the entity. The salary of an engineer who installs the machine is different, because it is directly attributable.

When must borrowing costs be capitalised?

IAS 23 requires capitalisation of borrowing costs directly attributable to acquiring, constructing or producing a qualifying asset, one that takes a substantial period to get ready. Capitalisation starts when spending, borrowing and preparation have all begun, pauses during interruptions and stops when the asset is ready.

How is a major inspection treated?

It is capitalised as a component when the recognition criteria are met, and the carrying amount of the previous inspection is derecognised. Day-to-day servicing is expensed. Airlines treat scheduled engine overhauls this way.

Are recoverable taxes part of the cost of PPE?

No. Only non-refundable purchase taxes form part of the purchase price. A tax the business can reclaim from the tax authority, such as recoverable VAT, is a receivable rather than a cost, so it stays out of the asset.

What counts as a qualifying asset under IAS 23?

An asset that necessarily takes a substantial period of time to get ready for its intended use or sale, such as a factory under construction. Financial assets, inventories made over a short period and assets ready for use when acquired are not qualifying assets.

Should the cost of a spare part be added to the machine?

Not when the spare part meets the definition of property, plant and equipment in its own right, for example because it has its own useful life of several years. It is then recognised as a separate item and depreciated over that life, as the tutorial solution explains.

Study strategy

Exam move

Practise cost build-ups as tables: item, amount, include or exclude, and the IAS 16 reason. The course marks one such question as part of a previous exam, so aim to complete one in a few minutes. Then drill the general-borrowings calculation, weighting each payment by its months outstanding, and the specific-borrowing version that deducts investment income.

Finish with subsequent costs, distinguishing components and inspections from routine repairs. Time yourself on the borrowing cost calculation as well, because the month counting is where most slips happen: write the payment date, the months to the year end and the rate on one line for each payment.

Working through Initial Cost of PPE and Borrowing Costs in ACCFIN5024? Sia is AskSia’s AI Accounting tutor — ask any ACCFIN5024 Initial Cost of PPE and Borrowing Costs question and get a clear, step-by-step explanation grounded in how ACCFIN5024 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 26 of your subjects at University of Glasgow, plus 1,000+ more Bibles across the AskSia library.
Sia - your ACCFIN5024 tutor, unlimited, worked the way the exam marks it
The full 4-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works
ACCFIN5024 · International Financial Accounting for Multinational Corporations - independent study guide on the AskSia Library. More University of Glasgow subjects · Microeconomics across all universities