Control Charts for Variables and Attributes

Control Charts for Variables and Attributes explains how a process is watched once it is running. Mean charts track the centre and range or standard deviation charts track the spread, with lines three standard errors from the target. The zones between the lines carry expected proportions, so a run of points in an outer zone, a trend, a shift or alternating points can signal a cause long before a point crosses a line.

The chapter ranks the variables charts, explains when attribute data are unavoidable and sets lines for p, np, c and u charts using the Poisson and binomial spreads. A Poisson calculation shows why one high count proves little and why attribute charts detect change slowly. Short-run methods, recalculating tighter lines from in-control data, and the difference between control lines and tolerance limits complete the chapter.

In this chapter

What this chapter covers

  • 01

    Mean, range and standard deviation charts

  • 02

    Zones and expected proportions

  • 03

    Patterns and likely causes

  • 04

    Variable or attribute data

  • 05

    Lines for p, np, c and u charts

  • 06

    Poisson odds for small counts

  • 07

    Short runs and recalculated lines

Worked example · free

Lines for a c chart of paint flaws

Q [4 marks]. Car panels are inspected for paint flaws, and the long-run average is 4.0 flaws per panel. Set the c chart lines and find the probability that an unchanged process gives a panel with no flaws. Any mark allocation on this item is a practice estimate, not a published one.
Bars give the Poisson probability of each count when the true mean is two defectives per batch; the orange bars show that two or more defectives happen in aboutBars give the Poisson probability of each count when the true mean is two defectives per batch; the orange bars show that two or more defectives happen in about 59% of batches from an unchanged process.012345600.2defectives found in one batchmean m = 2.0orange: two or more
Bars give the Poisson probability of each count when the true mean is two defectives per batch; the orange bars show that two or more defectives happen in about 59% of batches from an unchanged process.
  • 1The centre line is the average count, 4.0 flaws per panel.
  • 1The spread of a Poisson count is the square root of its mean, 2.0, so the lines are 4.0 ± 3 × 2.0.
  • 1The upper line is 10.0 and the lower value is negative, so the lower line is drawn at zero.
  • 1P(0) = e^(−4) = 0.0183, so a flawless panel is unusual but not a signal on its own.
Centre 4.0, upper line 10.0 and lower line 0; a panel with no flaws has a probability of about 0.018.
Sia tip — Count flaws for c and u charts and failed units for p and np charts; choosing the wrong count type changes the spread formula.
Glossary

Key terms

Control line
A line on a control chart set from process performance, not from the design tolerance.
Attribute data
Counts of defective units or defects rather than measured values.
Run rule
A pattern of points, such as six rising in a row, that signals a likely change.
Subgroup
A small sample taken together at one time, whose mean and range are plotted as a single point on the chart.
Poisson distribution
The model for counts of defects when they occur independently at a steady average rate, used for c and u charts.
FAQ

Control Charts for Variables and Attributes FAQ

Why prefer variables charts to attribute charts?

A measurement says how far from target a part is, while a pass or fail does not. Attribute charts therefore need many more samples, and more defective output, before a change becomes clear, which is why the revision answers say to avoid them when measurement is possible.

Is the term control limit wrong?

The course prefers control line but does not mark control limit wrong. Keep the word tolerance for the design values, so that UCL and LCL belong to the chart and UTL and LTL to the drawing.

What should I do when a point signals?

Investigate before adjusting. Adjusting after every sample feeds noise back into the process and can create the very alternating pattern the chart is meant to detect.

How large should a subgroup be?

Small enough that the parts inside it are made under almost the same conditions, so that within-group scatter reflects common causes only, and large enough to give a stable mean. Groups of four or five are typical for variables charts, while attribute charts usually need much larger samples.

Study strategy

Exam move

Memorise the zone proportions and the main run rules with a likely physical cause for each, because the 2025 revision session works through a chart that signalled through zones before any point crossed a line.

Then practise the formulas: mean-chart lines from a study mean and standard deviation, and attribute lines for each of p, np, c and u, choosing the chart from two questions, units or flaws, and fixed or varying sample size. Do a Poisson calculation for one batch and for several consecutive batches to see how slowly evidence accumulates.

Keep the table-constant method in mind but use whatever constants the paper prints rather than values from memory. Finally, write two or three short diagnoses in full, signal, likely cause, check before restarting, because a good answer explains the chart rather than circling points. Calculate the lines for a mean and range chart from a short data set, then plot it and apply the run rules point by point.

Afterwards, work one attribute chart, either p or c, from raw counts and explain in a sentence why its lines move when the sample size changes. Finish by linking each signal you find to a likely physical cause on the shop floor.

Working through Control Charts for Variables and Attributes in ENG5096? Sia is AskSia’s AI Engineering tutor — ask any ENG5096 Control Charts for Variables and Attributes question and get a clear, step-by-step explanation grounded in how ENG5096 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 26 of your subjects at University of Glasgow, plus 1,000+ more Bibles across the AskSia library.
Sia - your ENG5096 tutor, unlimited, worked the way the exam marks it
The full 5-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works