ENG5096 Chap.5 Materials Selection, Process Selection and Cost
Materials Selection, Process Selection and Cost
Materials Selection, Process Selection and Cost turns design requirements into choices. Selection begins with the function, the objective, the constraints and the free variables; writing the objective as an equation and eliminating the free variable gives a material index to maximise, such as strength over density for a strong tie or the square root of modulus over density for a stiff beam.
On log-log property charts these indices become selection lines with gradients of one or two, and the chapter shows how to read and move them. The table-leg buckling problem shows how a second objective creates conflict.
Process selection then screens the routes that can make the part, and the cost model prices the survivors through three terms: material adjusted for scrap, tooling shared across its life, and shared machine time with overheads. Exchange coefficients bring several objectives into one function.
What this chapter covers
- 01
Function, objective, constraint, free variable
- 02
Indices for ties, beams and columns
- 03
Selection lines on log-log charts
- 04
Conflicting objectives and exchange coefficients
- 05
Screening processes before costing
- 06
Material, tooling and machine cost terms
- 07
Why some composite parts are expensive
Worked example · free
Machine cost per part for a tape-laying cell
- 1Write-off time is 3 × 365 × 24 = 26,280 hours.
- 1The load factor is 18/24 = 0.75.
- 1Capital charge per hour is 750,000/(0.75 × 26,280) = £38.05.
- 1Adding overheads gives £38.05 + £35 = £73.05 per hour.
- 1Dividing by 1.5 parts per hour gives £48.70 per part.
Key terms
- Selection line
- A line of constant material index drawn on a log-log property chart.
- Free variable
- A design dimension the designer may change, eliminated when deriving an index.
- Load factor
- The fraction of available time that shared equipment is actually used.
- Material index
- A grouping of properties that, when maximised, gives the best material for a stated function, objective and constraint.
- Process cost model
- An estimate of unit cost built from material, tooling and overhead terms, each scaled by batch size and production rate.
Materials Selection, Process Selection and Cost FAQ
Why does the beam index have a square root?
When section size is free, a stiffer material lets the beam be smaller, and bending stiffness depends on section size to a higher power than mass does. Eliminating the size leaves the square root of modulus over density, which plots with gradient two.
How do I move a selection line on the chart?
Keep its gradient fixed and slide it towards higher index values, usually up and to the left on a modulus against density chart, until only a few candidates remain above it. Those are the materials worth considering.
What makes a carbon bicycle frame expensive?
The prepreg in it is a small share of the price. The tutorial answer points to slow, labour-intensive manufacture, trial and error, extensive testing and overheads such as design, marketing and profit.
What steps should a selection answer follow?
State the function, the objective and the constraints, name the free variable, then eliminate it to reach the index. Draw the selection line on the chart with the correct slope, read off the candidates above it, and finish with one sentence on cost or processing that could change the choice.
Exam move
Practise derivations until the four-step method is automatic: state function, objective, constraint and free variable; write the objective as an equation; use the constraint to eliminate the free variable; read off the index. Do it for a strong tie, a stiff tie, a stiff beam and a buckling column, and check each slope by taking logarithms.
Then use the selection software to reproduce the lecture charts, because the quizzes ask for exactly that and use mid-range values. For the cost model, build a spreadsheet with one row per term and test it on the tutorial examples before the quiz, keeping the load factor as a fraction and the write-off time in hours. In written answers, separate the three cost terms and say which dominates at low and high volume.
Finally, rehearse one paragraph on conflicting objectives, using a simple weighted function of mass and cost with stated coefficients, since the course treats that idea qualitatively. Derive the tie and beam indices from scratch until the square root and the slope on a log chart feel obvious.
Then work one cost example in which tooling dominates at low volume and material dominates at high volume, and explain the crossover in words.
Working through Materials Selection, Process Selection and Cost in ENG5096? Sia is AskSia’s AI Engineering tutor — ask any ENG5096 Materials Selection, Process Selection and Cost question and get a clear, step-by-step explanation grounded in how ENG5096 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.