University College London · FACULTY OF ENVIRONMENTAL SCIENCE

BENV0140 Chap.4 Heating, Cooling and Retrofit

- one subject, every graph, every model, every mark
6 Chapters4-page Bible
Our own words - no uploaded lecturer files
Updated for this semester
Chapter 4 of 9 · BENV0140

Heating, Cooling and Retrofit

Heating, Cooling and Retrofit combines building load, plant performance, sensible heat storage and real-world delivery. Fabric and ventilation set part of the useful heating or cooling need; gains, controls and plant efficiency change delivered energy. Thermal mass stores sensible heat as material temperature changes and can shift demand when control and comfort permit.

Retrofit should follow diagnosis, because expected and actual performance can diverge through survey error, construction, commissioning, operation or maintenance. Coordinated sequencing reduces load, protects indoor conditions, sizes plant for the revised building and verifies the outcome after occupation. The useful load, the energy entering plant and the energy purchased at the meter are related but not interchangeable.

Each boundary needs its own efficiency or coefficient and a stated time period. Retrofit choices interact: fabric measures can reduce required output, ventilation changes can affect health and moisture, and altered controls can expose or conceal a performance gap. Thermal mass provides capacity only within acceptable temperature limits and only when heat can be charged and released at useful times.

A credible plan establishes a baseline, prioritises dependencies, commissions the combined system and measures post-occupancy results against weather, use and comfort conditions.

In this chapter

What this chapter covers

  • 01

    Heating and cooling load

  • 02

    Plant efficiency

  • 03

    Sensible heat storage

  • 04

    Thermal mass

  • 05

    Retrofit sequencing

  • 06

    Performance gap

Worked example · free

Estimate accessible sensible heat

Q [6 marks]. Marks used here guide this fresh calculation and are not a university assessment scheme. An 18 m³ slab has volumetric heat capacity 2.0 MJ/m³K and a 2.5 K usable swing. Find stored heat and a 60% accessible share.
This illustrative waterfall starts from a modelled energy index of 100 and adds fabric, control and operating effects to reach an observed index of 130, making This illustrative waterfall starts from a modelled energy index of 100 and adds fabric, control and operating effects to reach an observed index of 130, making the diagnostic gap explicit.model 100fabric +12controls +10operation +8actual 130illustrative energy index
This illustrative waterfall starts from a modelled energy index of 100 and adds fabric, control and operating effects to reach an observed index of 130, making the diagnostic gap explicit.
  • 2Multiply 2.0 by 18 by 2.5 to obtain 90 MJ.
  • 2Divide by 3.6 to convert 90 MJ into 25.0 kWh.
  • 1Multiply by 60% to obtain 15.0 kWh accessible energy.
  • 1Distinguish this energy capacity from discharge power and comfort limits.
The slab stores 25.0 kWh over the stated swing, with 15.0 kWh accessible under the scenario. The weighting is original practice guidance.
Sia tip — Never turn thermal capacity into a power claim without a discharge duration and heat-transfer limit.
Glossary

Key terms

Coefficient of performance
Useful heat moved divided by the input energy used by a heat pump.
Sensible heat
Thermal energy stored or released through a temperature change without phase change.
Performance gap
The difference between expected building performance and observed operation.
FAQ

Heating, Cooling and Retrofit FAQ

Why should retrofit start with diagnosis?

Different causes can produce the same high bill or comfort complaint. Envelope loss, leakage, poor controls, plant operation, occupancy and measurement all need testing. Choosing a measure first risks treating a symptom, oversizing equipment or weakening ventilation and indoor conditions.

How does thermal mass affect demand?

Thermal mass slows temperature change by absorbing and releasing sensible heat. With suitable control, it can move heating or cooling demand across time. Its usefulness depends on accessible mass, temperature limits, heat-transfer rate and a path for later charging or discharge.

What creates a building performance gap?

Possible causes arise in modelling, survey inputs, construction, commissioning, operation and maintenance. Measurement uncertainty can also matter. A credible explanation compares aligned boundaries and conditions, then uses monitoring or testing to distinguish the strongest competing mechanisms.

Study strategy

Exam move

Build a retrofit decision tree rather than memorising measures. Start with the required service and the observed problem. Separate transmission, ventilation, gains, plant and controls, then write which measurement tests each branch. Revisit the heat-loss relations before adding plant efficiency so useful and delivered energy remain distinct.

For sensible storage, calculate energy capacity, convert units and then state the discharge duration needed to infer power. Practise comparing lightweight and heavyweight materials under the same volume and temperature swing. Sequence interventions: reduce avoidable load, maintain healthy ventilation, resize or retune plant, commission controls and verify actual operation.

Consider moisture, overheating, embodied impact, disruption, maintenance and skills before recommending fabric work. Keep predicted and measured boundaries aligned when discussing the performance gap. Record errors under untested cause, capacity-power confusion, omitted service constraint or missing verification.

Strong answers explain why a measure addresses the dominant mechanism, how it interacts with the rest of the building and what evidence would cause the plan to change. Create a performance-gap worksheet with columns for design assumption, observed condition, possible mechanism and discriminating test. Populate it with envelope continuity, infiltration, ventilation control, plant temperature, schedule, occupancy and weather.

Do not choose the cause until evidence separates the alternatives. Next, take one retrofit package and reorder it three ways. Calculate how fabric improvement changes plant sizing, how shading changes cooling need and how airtightness changes the ventilation design. Explain the cost of doing those actions in the wrong order. For thermal mass, pair every capacity calculation with a charging and discharge story.

State the heat source, allowable temperature swing, useful release period and service protected. Compare a large energy capacity with a slow heat-transfer rate so you do not treat stored energy as instantly available power. Review plant performance at different operating conditions rather than carrying one efficiency figure across a season. Add controls, cycling and auxiliary consumption to the explanation.

Finish with a post-occupancy plan that names temperatures, energy, airflow, faults and occupant feedback. The completed answer should show how design intent becomes commissioned operation, not stop at the specification of components.

A+Everything unlocked
Unlocks this Bible + all 32 of your subjects at University College London, plus 1,000+ more Bibles across the AskSia library.
Sia - your BENV0140 tutor, unlimited, worked the way the exam marks it
The full 4-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works
BENV0140 · Fundamentals of Smart Energy and the Built Environment - independent study guide on the AskSia Library. More University College London subjects · Microeconomics across all universities