The calculations follow: Little's law linking work in process, throughput and lead time; takt time from available time and demand; the minimum number of operators and the stations each step needs, with and without availability losses; kanban card counts with a safety factor; and Kingman's approximation, which shows queue time multiplying as utilisation approaches one and shrinking as variability falls.
The chapter ends with release control by kanban, CONWIP, drum-buffer-rope and POLCA, and with the factory physics benchmarks that compare a line with its best and practical worst cases.
What this chapter covers
- 01
The Toyota Production System house
- 02
Push and pull release
- 03
The eight wastes
- 04
Little's law
- 05
Takt time and station counts
- 06
Kanban sizing
- 07
Kingman's approximation and release control
Worked example · free
Size a kanban loop and check its lead time
- 1Demand during the loop time is 180 × 0.4 = 72 housings.
- 1With the safety factor, 72 × 1.10 = 79.2 housings.
- 1Cards needed are ⌈79.2/15⌉ = ⌈5.28⌉ = 6, authorising 90 housings.
- 1At a throughput of 180 per day, 90 housings represent 90/180 = 0.5 day of lead time.
- 1That is an upper bound: average stock in the loop is usually lower than the authorised maximum.
Key terms
- Jidoka
- Building in quality by stopping a process automatically or manually when an abnormality appears.
- CONWIP
- A release rule that holds total work in process on a line at a fixed level.
- Coefficient of variation
- Standard deviation divided by mean, used for arrival and service variability.
- Takt time
- Available working time divided by customer demand over the same period, the pace at which finished units are needed.
- Little's law
- Average work in process equals average throughput multiplied by average flow time, for any stable system.
Lean Flow, Pull and Takt Time FAQ
Is takt time the same as cycle time?
No. Takt is a demand rate, how often the customer needs one unit. Cycle time in factory physics is how long a unit spends in the system. Little's law links lead time to work in process, not to takt.
Why do queues grow so quickly near full utilisation?
Queue time scales with u/(1 − u). At 80 per cent the factor is four, at 90 per cent nine and at 95 per cent nineteen, so the last few points of utilisation cost far more waiting than the first.
Which waste matters most?
The slides single out overproduction, because making more than needed creates other wastes: extra inventory to move, store, count and possibly scrap. Removing it often removes several others at once.
How do I use Little's law in a numerical question?
Identify two of the three quantities and solve for the third, keeping the units consistent. If the line holds 120 parts and completes 40 an hour, a part spends three hours inside on average. The law needs only stability, so it applies even when the arrival and service patterns are unknown.
Exam move
Learn the four quantities first, process time, lead time, takt and throughput, and never let them blur; the lecture's own list of common mistakes starts there. Then practise the equations in a fixed order: Little's law, takt, minimum operators, stations per step with utilisation, stations with availability, kanban cards and Kingman queue time. Do each with your own numbers and write the units beside every line.
Next, practise the qualitative items: name the waste in a short scenario, classify a system as push or pull, and say which release method suits a given shop. Finally, rework the integrated problem from the lecture without notes, because it chains several equations together exactly as an exam question would, and finish with a sentence on what the numbers mean for the line.
The quiz on Lectures 1 to 5 covers this material, so rehearse it before the quiz window closes. Work the takt time, Little's law and Kingman calculations on the same small line so you see how they connect. Then change utilisation in steps towards one and tabulate the queue time, because the shape of that table is the main argument for buffers and variability reduction.
Working through Lean Flow, Pull and Takt Time in ENG5096? Sia is AskSia’s AI Engineering tutor — ask any ENG5096 Lean Flow, Pull and Takt Time question and get a clear, step-by-step explanation grounded in how ENG5096 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.