Value Stream Mapping and Kaizen

Value Stream Mapping and Kaizen shows how to see a whole process on one page and then improve it. A map follows a product family from supplier to customer: process and data boxes, inventory triangles, push arrows, information flows and the lead-time ladder that separates waiting from working.

The chapter turns piles into minutes through takt, adds processing time to get lead time, and divides value-adding time by lead time to get process cycle efficiency, which is usually a few per cent. It then measures each step's real capacity with set-up and availability, finds the constraint and designs a future state with levelled pacing and kanban loops.

Improvement tools follow: PDCA, the three Ms of waste, unevenness and overburden, the 4M fishbone, five whys, 5S and quick changeover, with the smallest workable batch calculated from the capacity inequality.

In this chapter

What this chapter covers

  • 01

    Product families and the gemba walk

  • 02

    Symbols of a value stream map

  • 03

    Lead time and process cycle efficiency

  • 04

    Effective capacity with set-up and availability

  • 05

    Designing the future state

  • 06

    PDCA, 3M, 4M and 5S

  • 07

    Quick changeover and smallest batch

Worked example · free

Lead time and efficiency from a three-step map

Q [5 marks]. A line with takt 2.0 min has piles of 80, 120 and 40 units before three steps of 1.8, 2.4 and 1.5 min. Of the 5.7 processing minutes, 4.9 add value. Find lead time, process cycle efficiency and mean work in process. This mark allocation reflects our estimate of the work involved, not any published assessment scheme.
A lead-time ladder for three steps: long red waits on the upper rungs dwarf the short blue processing times on the lower rungs, which is why lead time is mostlyA lead-time ladder for three steps: long red waits on the upper rungs dwarf the short blue processing times on the lower rungs, which is why lead time is mostly queue.225 min2.5135 min3.090 min3.5red waiting, blue processing
A lead-time ladder for three steps: long red waits on the upper rungs dwarf the short blue processing times on the lower rungs, which is why lead time is mostly queue.
  • 1Convert piles to waiting time with takt: 80 × 2.0 + 120 × 2.0 + 40 × 2.0 = 160 + 240 + 80 = 480 min.
  • 1Lead time is 480 + 5.7 = 485.7 min.
  • 1Process cycle efficiency is 4.9/485.7 = 1.01%.
  • 1Throughput is 1/2.0 = 0.5 units per minute, so mean work in process is 0.5 × 485.7 = 242.9 units.
  • 1Of that, 240 are queued and about 2.9 are being processed.
Lead time is about 486 min, efficiency about 1.0% and mean work in process about 243 units.
Sia tip — Report the processing share and the strict efficiency separately: the first counts all processing minutes, the second only the value-adding ones.
Glossary

Key terms

Process cycle efficiency
Value-adding time divided by total lead time for one unit.
Gemba
The shop floor itself, visited to watch and time each step at first hand.
Internal set-up
Changeover work that can only be done while the machine is stopped.
Value stream map
A one-page picture of material and information flow for a product family, with times and stock levels at each step.
Kaizen burst
A marker placed on a future-state map to show where a specific improvement event is planned.
FAQ

Value Stream Mapping and Kaizen FAQ

Why start the gemba walk at the customer?

Walking upstream from shipping follows customer demand back through the process and makes the queues between steps visible in the order they affect the customer. Timing the steps yourself avoids trusting standards that may no longer be true.

Does kanban shrink inventory piles by itself?

No. The cards cap the stock a loop may hold, but the cap depends on loop time. Shortening replenishment through smaller batches and faster changeovers is what lets the card count, and the piles, fall.

Why must the smallest batch be rounded up?

The batch must satisfy the capacity inequality. Rounding down would leave set-up time eating into capacity so that the step falls short of demand, which is the failure the calculation exists to prevent.

What numbers belong on a current-state map?

For each process box record cycle time, changeover time, uptime and the number of operators, and between boxes record the stock held. Convert each stock into days of demand so the lead time ladder can be added up and compared with the total processing time.

Study strategy

Exam move

Practise drawing a small map by hand with the standard symbols, then compute everything a map should show: waits from piles and takt, lead time, processing share, strict efficiency and work in process, checking that work in process equals throughput times lead time. Next, drill effective capacity, because most capacity mistakes come from forgetting set-up or availability, or from counting set-up twice.

For each step, compute effective time, stations needed, capacity and load, and identify the constraint. Then rehearse the improvement tools as short definitions with an example each: PDCA on a slow step, 5S on a messy cell, quick changeover moving internal work to external.

Finally, rework the housing cell exercise without notes, since the lecture flags it as exam style, and close each answer with the change you would make first and the number that justifies it. Draw a current-state map for a simple three-step process from memory, add the timeline and compute process cycle efficiency. Then mark two improvement points on a future-state version and estimate how much each would shorten lead time.

Working through Value Stream Mapping and Kaizen in ENG5096? Sia is AskSia’s AI Engineering tutor — ask any ENG5096 Value Stream Mapping and Kaizen question and get a clear, step-by-step explanation grounded in how ENG5096 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 26 of your subjects at University of Glasgow, plus 1,000+ more Bibles across the AskSia library.
Sia - your ENG5096 tutor, unlimited, worked the way the exam marks it
The full 4-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works