Chapter 8 of 10 · CIVE5172M

Risk and Value Management

Risk and Value Management covers the two weeks in which the module asks whether a plan deserves to go ahead and whether its design gives the client good value.

Risk management appears through the risk and opportunities registers introduced earlier, the reserves that fund uncertainty and the coursework requirement to evaluate external risks to the investor, client, design team and future contractor before stating an overall level of risk and a recommendation on whether to proceed.

Value management appears through Part B of the essay, which casts you as a value engineer reviewing options for the Leeds tram design and rewards a well-justified demonstration of improved value using appropriate tools.

A recurring idea from the cost lecture links the two: the ability to reduce cost is greatest early and shrinks through the lifecycle, while the cost of making a change rises, so both risk decisions and value reviews repay most when made early.

The chapter also notes how digital tools are beginning to serve both purposes, from sensor dashboards that support safety decisions to immersive design workshops reported to reduce design-change requests during value engineering, and how the Week 5 tutorial pairs decision making with risk.

In this chapter

What this chapter covers

  • 01

    Why early decisions shape cost and value

  • 02

    Risk and opportunities registers

  • 03

    External risks by party: investor, client, design team, contractor

  • 04

    Overall risk level and a proceed recommendation

  • 05

    Value management and value engineering

  • 06

    Reserves and residual risk

  • 07

    Digital tools in risk and value work

Worked example · free

Decide when a value review should happen

Q [4 marks]. A client asks whether a value engineering review of a new tram depot should be held now, at concept design, or after the main contractor is appointed. Using the relationship between the ability to reduce cost and the cost of change, advise the client. The 4-mark split is a practice weighting for this guide, not an official University scheme.
Across the project lifecycle the ability to reduce cost falls while the cost of making a change rises, which is why the shaded early window is where value revieAcross the project lifecycle the ability to reduce cost falls while the cost of making a change rises, which is why the shaded early window is where value reviews and risk decisions repay the most effort.ability to reduce costcost of making a changevalue reviewconceptdesignconstructionoperationproject lifecycle
Across the project lifecycle the ability to reduce cost falls while the cost of making a change rises, which is why the shaded early window is where value reviews and risk decisions repay the most effort.
  • 1The ability to reduce cost is greatest in the early phases and falls as the project advances.
  • 1The cost of making a change rises through design and construction, and downstream it can exceed the original cost.
  • 1A review at concept design can change scope and form cheaply, while a review after appointment mainly trades specifications under contract.
  • 1Hold the main review now and a shorter check after appointment, so that later options are tested against an agreed baseline.
Hold the main value review at concept design, where influence is high and change is cheap, and keep a smaller review after the contractor is appointed.
Sia tip — Place every value or risk proposal on the lifecycle before arguing its merits; the same idea can be cheap at concept stage and ruinous on site.
Glossary

Key terms

Opportunities register
A record of possible gains in time, cost or quality, reviewed alongside the risk register.
Value engineering
A structured review of design options aimed at improving value for the client.
Management reserve
Money set aside for unknown unknowns, future situations that cannot be predicted.
FAQ

Risk and Value Management FAQ

What must the risk section of the group presentation include?

A risk register for the Leeds tram project and an evaluation of the external risks it faces, which may bear on the investor, the client, the design team or the contractor still to be appointed. The evaluation must end with an overall level of risk and a recommendation on whether the project should proceed.

Does the value engineering task need a detailed cost estimate?

No. The brief states that detailed cost estimates and technical specifications are not required. Marks go to a well-justified demonstration of how value would be managed and improved, with key considerations and appropriate value management and value engineering tools, tailored to the proposed tram.

Why should risk and opportunity be recorded together?

Planning should acknowledge an unforeseen future, and both threats and gains need to be factored into the programme. Recording only threats hides chances to save time or cost, and a changes log linked to the risk register makes each approved change prompt a fresh look at both.

Study strategy

Assessment move

Prepare this chapter by rehearsing the two judgements the coursework asks for. For risk, choose a transport scheme you know and list external risks under four headings, one for each party that would bear them. Judge each one briefly, then write a two-sentence conclusion that states an overall level and a conditional recommendation.

Practise the conditional form, because a recommendation that names the condition for proceeding is stronger than a plain yes or no. Add a line on how residual risk is funded, separating contingency for known unknowns, which sits inside the baseline, from a management reserve for the unpredictable.

For value, take one design element, such as a stop, a depot or a bridge, and write down what the client needs it to achieve before listing alternatives. Judge each alternative on whole-life cost as well as capital cost, and say what the client would give up. Place every proposal on the lifecycle and ask whether it is still cheap to adopt.

Finally, look for overlaps: a value option that removes a risk, or a risk response that adds value, makes a strong paragraph in either the presentation or Part B of the essay.

Working through Risk and Value Management in CIVE5172M? Sia is AskSia’s AI Project Management tutor — ask any CIVE5172M Risk and Value Management question and get a clear, step-by-step explanation grounded in how CIVE5172M is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 8 of your subjects at University of Leeds, plus 1,000+ more Bibles across the AskSia library.
Sia - your CIVE5172M tutor, unlimited, worked the way the exam marks it
The full 4-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works
CIVE5172M · Project Management Tools and Techniques - independent study guide on the AskSia Library. More University of Leeds subjects · Microeconomics across all universities