Resource Loading and Levelling

Make the schedule feasible under capacity

Dependency logic shows when work could occur if resources were available. Resource loading compares scheduled demand with actual capacity by period. Levelling moves work to resolve overallocation, using float where possible and changing the finish only when the constraint cannot otherwise be satisfied.

The revised schedule must be recalculated because consumed float and moved work can create a new critical path and shift the time-phased budget.

Measure the resource that actually constrains flow

Headcount can hide a specialist, machine, facility or calendar constraint. Build loading by the required capability and include part-time availability, leave and switching time.

When work moves, report which activity changed, why it was chosen, how much float remains and whether cost or completion changed. Shared bottlenecks need portfolio authority because individual project managers cannot all assign themselves first priority. The final loading chart should prove feasibility, while the decision record explains the accepted trade.

In this chapter

What this chapter covers

  • 01

    Resource demand by activity and period

  • 02

    Loading charts and capacity lines

  • 03

    Float as scheduling flexibility

  • 04

    Resource levelling priorities

  • 05

    Multitasking and switching cost

  • 06

    Multiproject bottlenecks and portfolio authority

Worked example · free

Use float to remove an overallocation

Q [6 marks]. AskSia-authored practice. Critical activity A and non-critical B need the only designer in the same week. B has three weeks of float. Resolve the conflict. The marks shown are an AskSia study allocation, not a University marking scheme.
The histogram makes the hidden constraint visible.The histogram makes the hidden constraint visible. Demand in weeks two and three exceeds the four-person capacity, so a logic-feasible schedule is not yet resource-feasible.capacity 4W1W2W3W4W5
The histogram makes the hidden constraint visible. Demand in weeks two and three exceeds the four-person capacity, so a logic-feasible schedule is not yet resource-feasible.
  • 2Identify the binding resource and critical commitment.
  • 2Move B within available float.
  • 2Recalculate float, paths and budget timing.
Keep A in place and move B one week later if its dependencies permit. The move consumes one week of B's float and leaves two. Update the loading chart, network and time-phased budget before treating the plan as controlled.
Sia tip — Report how much float remains after every levelling move.
Glossary

Key terms

Resource Loading
The amount of a named resource required by scheduled work in each time period.
Overallocation
A condition where scheduled resource demand exceeds available capacity.
Resource Levelling
Changing activity timing to produce a resource-feasible schedule.
Resource Smoothing
Adjusting work within available float while preserving a fixed completion date.
Bottleneck
A constrained resource whose limited capacity governs the flow of project work.
FAQ

Resource Loading and Levelling FAQ

What evidence proves that a levelled schedule is feasible?

Provide before-and-after demand, capacity, overload, moved activity, remaining float and revised finish by period, then reconcile those values to the network. Name the constrained capability rather than relying on total headcount. Finally identify who bears the consequence of the move, because resolving an overload is also a governance choice about priorities, benefits and delay.

Why can a logic-feasible schedule still fail?

Network logic assumes resources are available whenever dependencies permit work to start. If two activities need the same scarce person or machine at once, the dates cannot both be achieved. Loading and levelling reveal and resolve that hidden constraint.

What should move first during resource levelling?

Protect dependency logic and critical commitments, then compare movable activities by float, priority, switching cost and downstream effect. The shortest activity is not automatically the right choice, and every move requires recalculation.

Why is multitasking a resource problem?

Starting many tasks does not increase scarce capacity. It creates switching and longer queues, so elapsed completion can worsen while utilisation appears high. Limiting work in progress and sequencing bottleneck tasks often improves completed flow.

Study strategy

Assessment move

Take a dependency-feasible network and assign named resource types to every activity. Replace broad headcount with the actual skill or machine needed, because four staff do not create four units of a specialist capability. Build a loading table by period and convert it into a histogram with a visible capacity line. Mark each overload and identify the activities that create it.

For every candidate move, record total float, latest finish, strategic priority, switching cost and downstream dependency effect. Protect critical commitments, move one eligible activity and rerun the schedule rather than assuming the histogram alone proves feasibility. Record the new critical path, remaining float and any change to the finish. Then update the time-phased budget to match the resource-feasible baseline.

Practise a case where no movement within float resolves the conflict. Compare delaying completion, changing scope, securing capacity and changing sequencing, and state which authority must approve the trade. Extend the same exercise across three projects competing for one bottleneck. Use enterprise priorities and consequences rather than letting the resource choose which manager to disappoint. Finally, test multitasking.

Compare a schedule where the bottleneck switches among partially finished tasks with one where it completes a valuable batch before taking the next. Measure completed flow and queue time, not only utilisation. A finished answer should name the constrained resource, the work moved, why it moved, how much float remains and whether schedule or cost changed. Those details turn levelling into an auditable planning decision.

Working through Resource Loading and Levelling in CDT505? Sia is AskSia’s AI Project Management tutor — ask any CDT505 Resource Loading and Levelling question and get a clear, step-by-step explanation grounded in how CDT505 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 11 of your Lingnan University subjects - and 1,000+ Bibles across every Australian university.
Sia - your CDT505 tutor, unlimited, worked the way the exam marks it
The full 3-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works
CDT505 · Project Management: Concepts and Tools - independent study guide on the AskSia Library. More Lingnan University subjects · Microeconomics across all universities