University of Sydney · FACULTY OF MANAGEMENT

ITLS6002 Chap.3 Advanced Inventory Decisions

- one subject, every graph, every model, every mark
6 Chapters3-page Bible
Our own words - no uploaded lecturer files
Updated for this semester
Chapter 3 of 6 · ITLS6002

Advanced Inventory Decisions

Advanced inventory planning selects a policy that matches the structure of the decision rather than forcing every case into EOQ. Quantity discounts require total landed-cost comparisons across feasible price ranges. Single-period products use an underage-versus-overage trade-off. Time-varying demand calls for lot-sizing or mixed-integer models that connect periods through inventory balance.

Multi-echelon systems add a second location question: where stock is physically held and where it should count for control. This chapter provides a model-selection routine, boundary checks and interpretation rules for comparing solutions that may be mathematically close but operationally different.

A discount solution tests a feasible EOQ or the lower breakpoint for every price bracket and includes purchase cost in the comparison. A newsvendor answer builds underage and overage costs from the case before taking the corresponding demand percentile. Dynamic lot sizing preserves product flow across time, while a binary setup variable links a fixed ordering cost to positive quantity.

Echelon analysis prevents upstream and downstream stock from being treated as unrelated buffers when they protect the same demand stream.

In this chapter

What this chapter covers

  • 01

    Quantity-discount candidate testing

  • 02

    Single-period newsvendor logic

  • 03

    Time-varying lot sizing

  • 04

    Mixed-integer inventory models

  • 05

    Echelon versus installation stock

  • 06

    Model selection and boundary checks

Worked example · free

Choosing a quantity-discount order

Q [8 marks]. The marks shown here are a study allocation and not a University marking scheme. Annual demand is 5,000 units, order cost is $80, carrying rate is 20%, and prices are $20 below 1,000 units or $19 from 1,000 units upward.
An echelon view.An echelon view. The warehouse supplies two regions and four retailers, so upstream protection reflects the demand and lead-time exposure below it.WarehouseRegion ARegion BR1R2R3R4
An echelon view. The warehouse supplies two regions and four retailers, so upstream protection reflects the demand and lead-time exposure below it.
  • 2At $20, EOQ is sqrt(2 x 5,000 x 80 / 4) = 447.21 units, which is feasible in the first bracket.
  • 2At $19, EOQ is sqrt(2 x 5,000 x 80 / 3.8) = 458.83 units, which is infeasible, so test the 1,000-unit break.
  • 2Total annual cost at 447 units is about 100,000 + 894.4 + 894 = $101,788.4.
  • 2Total annual cost at 1,000 units is 95,000 + 400 + 1,900 = $97,300.
Order 1,000 units because the purchase saving outweighs the additional holding cost.
Sia tip — Reject an infeasible EOQ immediately, but retain its bracket boundary as a total-cost candidate.
Glossary

Key terms

Critical Fractile
The target demand percentile implied by relative underage and overage costs.
Underage Cost
The marginal consequence of ordering one unit too little in a single-period setting.
Echelon Stock
Inventory at one stage plus inventory downstream that it supports.
Setup Variable
A binary model variable indicating whether ordering or production occurs in a period.
FAQ

Advanced Inventory Decisions FAQ

Why must quantity-discount breakpoints be tested?

An EOQ computed using a lower price may fall outside that price bracket. The breakpoint is the smallest feasible quantity receiving the discount, and its lower purchase cost can dominate even when it raises cycle-stock holding cost.

When is a newsvendor model inappropriate?

It is inappropriate when unsold stock carries normally into repeated replenishment cycles or when shortages are routinely backordered. The model is intended for a single selling opportunity with clearly defined overage and underage consequences.

What does a binary setup variable add to a lot-sizing model?

It connects a fixed setup cost to the decision to order or produce. A linking constraint prevents positive quantity unless the setup variable is activated, allowing the optimiser to trade larger batches against inventory carrying cost.

Which costs belong in an all-units discount comparison?

Compare annual purchase, ordering and holding costs for every feasible candidate. Holding cost changes when it is calculated as a proportion of price, and purchase cost must be included because the unit price differs across brackets. Reject any candidate that does not qualify for its assumed price.

How is the newsvendor critical fractile interpreted?

It is the cumulative demand probability where the marginal cost of ordering too little balances the combined overage and underage consequences. The resulting quantity is a percentile, not an expected demand plus an arbitrary safety percentage, so define both costs before consulting the distribution.

What is the difference between installation stock and echelon stock?

Installation stock concerns one location's own inventory. Echelon stock includes that location plus downstream inventory it supports. The distinction matters because an upstream policy based only on local stock can ignore protection already present elsewhere in the network.

Study strategy

Exam move

Build a short decision tree keyed to price breaks, product life, time-varying demand and network level. For discounts, calculate a candidate in every bracket and compare full annual cost. For single-period questions, define underage and overage costs in words before taking a percentile. For dynamic models, write the inventory-balance row for one period and explain every variable before expanding it across the horizon.

Practise identifying the model from a short business description before calculating anything. In a discount problem, mark every bracket as feasible or infeasible and keep a candidate-cost table. In a newsvendor problem, test whether changing salvage value moves the critical fractile in the expected direction.

For multi-period planning, reconcile opening stock, orders, demand and closing stock on every row, then verify the horizon total. In echelon cases, sketch the network and circle the downstream inventory counted by each control point before assigning parameters.

Working through Advanced Inventory Decisions in ITLS6002? Sia is AskSia’s AI Management tutor — ask any ITLS6002 Advanced Inventory Decisions question and get a clear, step-by-step explanation grounded in how ITLS6002 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 196 of your University of Sydney subjects - and 1,000+ Bibles across every Australian university.
Sia - your ITLS6002 tutor, unlimited, worked the way the exam marks it
The full 3-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works