PMGT5891 Chap.7 Quantitative Risk Assessment and Monte Carlo Simulation

- one subject, every graph, every model, every mark
9 Chapters5-page Bible
Our own words - no uploaded lecturer files
Updated for this semester
Chapter 7 of 12 · PMGT5891

Quantitative Risk Assessment and Monte Carlo Simulation

This chapter covers the Weeks 7 to 8 material on quantitative cost risk assessment. You learn to turn a single cost or duration guess into optimistic, most likely and pessimistic values, to compute triangular and PERT means, and to choose between uniform, triangular, Trigen and betaPERT shapes.

It then walks through Monte Carlo simulation in Excel, from random sampling to a cumulative S-curve, and shows how to read P50, P80 and P90 figures as funding advice. Sensitivity analysis with tornado charts, structured scenarios, correlation between inputs and the pooling of expected monetary values complete the toolkit, with every example built on original numbers.

In this chapter

What this chapter covers

  • 01

    Quantitative cost risk assessment in Excel

  • 02

    Optimistic, most likely and pessimistic estimates

  • 03

    Triangular and PERT means, standard deviation and variance

  • 04

    Uniform, triangular, Trigen and betaPERT distributions

  • 05

    Monte Carlo steps, iterations and fixed seeds

  • 06

    Reading P50, P80 and P90 from an S-curve

  • 07

    Tornado charts and one-way sensitivity

  • 08

    Scenario analysis and correlated inputs

  • 09

    Pooling expected monetary values

Worked example · free

PERT expected duration for three sequential tasks

Q [5 marks]. An original community hall extension needs three tasks done one after another: site survey (optimistic 4, most likely 6, pessimistic 14 days), design (8, 10, 18 days) and council approvals (5, 9, 25 days). Using the PERT formulas, find the expected duration and standard deviation of the sequence and name the task that most deserves attention. (AskSia practice weighting; not an official University mark allocation.)
One-way tornado for the original cycleway estimate: each bar moves one input from its optimistic (green, left) to its pessimistic value (red, right) while the rOne-way tornado for the original cycleway estimate: each bar moves one input from its optimistic (green, left) to its pessimistic value (red, right) while the rest stay at most likely. Earthworks swings the total by $160k, more than twice any other input.Earthworks$860k$1,020kAsphaltLightingDrainageTraffic controlBase $900kTotal cost ($k)
One-way tornado for the original cycleway estimate: each bar moves one input from its optimistic (green, left) to its pessimistic value (red, right) while the rest stay at most likely. Earthworks swings the total by $160k, more than twice any other input.
  • +1PERT means use (O + 4M + P) / 6. Survey: (4 + 24 + 14) / 6 = 42 / 6 = 7.0 days. Design: (8 + 40 + 18) / 6 = 66 / 6 = 11.0 days. Approvals: (5 + 36 + 25) / 6 = 66 / 6 = 11.0 days.
  • +1Expected total = 7.0 + 11.0 + 11.0 = 29.0 days. The most likely values alone add to 6 + 10 + 9 = 25 days, so planning on them understates the sequence by 4 days.
  • +1Standard deviations use (P minus O) / 6. Survey: 10 / 6 = 1.67 days. Design: 10 / 6 = 1.67 days. Approvals: 20 / 6 = 3.33 days.
  • +1Variances are the squares: 2.78 + 2.78 + 11.11 = 16.67. Because total variance is the sum of task variances, the sequence standard deviation is the square root of 16.67, about 4.08 days.
  • +1Approvals supplies 11.11 / 16.67 = 67% of the total variance, so it is the task to treat first, for example by lodging the application early and agreeing a pre-lodgement meeting.
Expected duration 29.0 days with a standard deviation of about 4.1 days; council approvals drives two thirds of the variance.
Sia tip — Before calculating, write O, M and P as a labelled three-column line for each task so the four-times weight always lands on the most likely value.
Glossary

Key terms

Three-point estimate
A three-point estimate is a forecast given as optimistic, most likely and pessimistic values instead of one figure. It is the input for PERT and for most Monte Carlo models.
Triangular distribution
A triangular distribution is a probability shape defined by a minimum, a most likely and a maximum value. Its mean is (Min + Most likely + Max) / 3, and for costs it usually leans to the right.
Monte Carlo simulation
Monte Carlo simulation is a method that recalculates a model many times with randomly sampled inputs. The stored results form a distribution of possible totals.
P80 confidence level
The P80 confidence level is the value that 80% of simulated outcomes do not exceed. A budget set there leaves about a one-in-five chance of overrun.
Tornado chart
A tornado chart is a bar chart that ranks inputs by how strongly each one moves the output. Bars are sorted with the widest at the top, so the chart looks like a tornado.
FAQ

Quantitative Risk Assessment and Monte Carlo Simulation FAQ

How many iterations does a Monte Carlo cost model need?

Baccarini gives 1,000 to 5,000 as typical, with more needed when a model has many variables or rare events in its tails. The unit's Excel notes add that accuracy improves as calculations increase. When comparing two versions of a model, keep the seed fixed so any difference in results comes from the model change, not from a new random sequence.

When should I use a PERT mean instead of a triangular mean?

Use PERT, (O + 4M + P) / 6, when the most likely value rests on good information and the extremes are shaky; the heavy weight on M keeps an extreme maximum from dragging the mean. Use the triangular mean, (O + M + P) / 3, when you suspect estimators are understating the pessimistic case, since its fatter right tail compensates.

Why does a simulated total usually come out above the sum of most likely costs?

Cost ranges are usually skewed to the right: an item can overrun by far more than it can underrun. Each item's mean therefore sits above its most likely value, and the gaps add up across items. That is why a deterministic base estimate often lands at a low percentile of the simulated S-curve.

What happens if I ignore correlation in a Monte Carlo model?

Independent sampling lets a high draw on one item cancel a low draw on another, so the output range comes out narrower than reality and high percentiles are understated. Positive correlation, such as several items sharing a steel price, widens the spread. Baccarini cites Chapman and Ward, who hold that a strong-dependence assumption tends to match reality better than independence does.

Study strategy

Exam move

Start by making the three-point formulas automatic: compute a triangular mean, a PERT mean and a PERT standard deviation for five invented items until each takes under a minute. Then open the unit's Monte Carlo template, change one item's maximum, and watch how P50 and P80 move; write one sentence each time explaining what the shift means for a sponsor.

Practise reading a cumulative table: given a percentile list and a base estimate, state the contingency for P50, P80 and P90 and the share of runs that overrun the base. Build a small tornado by hand for a four-item estimate so you can explain why the top bar deserves treatment first.

Finally, rehearse two short critiques you can use in any answer: false precision from extensive calculation, and narrow results when correlation is ignored. Keep every calculation laid out step by step so the reasoning stays visible.

Working through Quantitative Risk Assessment and Monte Carlo Simulation in PMGT5891? Sia is AskSia’s AI Project Management tutor — ask any PMGT5891 Quantitative Risk Assessment and Monte Carlo Simulation question and get a clear, step-by-step explanation grounded in how PMGT5891 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 196 of your University of Sydney subjects - and 1,000+ Bibles across every Australian university.
Sia - your PMGT5891 tutor, unlimited, worked the way the exam marks it
The full 5-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works