Sensitivity Analysis and Monte Carlo Simulation

Beyond a single forecast

Week 3 asks how much an NPV depends on its assumptions.

The tutorial case gives sales and salvage values under three states of the economy with probabilities, and asks for the expected NPV, the effect of a higher rate for a riskier project, the value of abandoning the line after a weak first year, a one-way sensitivity of sales and salvage from 70% to 130% of their most likely values, and a two-way data table that respects the stated distributions.

From scenarios to simulation

Monte Carlo simulation, listed in the teaching plan, draws thousands of joint scenarios and reports the whole distribution of NPV.

The formula sheet gives the standard deviation of NPV for independent and for perfectly correlated cash flows, and the Week 3 materials include notes on simulating correlated normal variables. Certainty equivalents offer a second route to risk, discounting certain amounts at the risk-free rate.

In this chapter

What this chapter covers

  • 01

    Expected NPV across states of the economy

  • 02

    Option to abandon valued branch by branch

  • 03

    One-way sensitivity and break-even inputs

  • 04

    Two-way data tables that follow the stated distributions

  • 05

    Standard deviation of NPV with independent or correlated flows

  • 06

    Monte Carlo simulation and certainty equivalents

Worked example · free

Expected NPV and the chance of a loss

Q [5 marks]. A project costs $1,000 and is expected to return $600 and $700 over two years, with standard deviations of $100 and $150. At 10%, find expected NPV and its standard deviation if the cash flows are independent and if they are perfectly correlated. The marks shown are AskSia's own study weighting, not an official QUT allocation.
NPV distribution for the worked example on the next page.NPV distribution for the worked example on the next page. Expected NPV is $124 with a standard deviation of $154 when the yearly cash flows are independent, so about a fifth of the probability, shaded red, sits below zero.NPV = 0Mean 124Loss 21%-3500600NPV ($)
NPV distribution for the worked example on the next page. Expected NPV is $124 with a standard deviation of $154 when the yearly cash flows are independent, so about a fifth of the probability, shaded red, sits below zero.
  • +1Expected NPV = −1,000 + 600 ÷ 1.1 + 700 ÷ 1.21 = $123.97.
  • +1Independent: σ = √(100² ÷ 1.21 + 150² ÷ 1.4641) = √23,632.26 = $153.73.
  • +2Perfectly correlated: σ = 100 ÷ 1.1 + 150 ÷ 1.21 = $214.88.
  • +1With a normal approximation, the probability of a loss is about 21% if independent and 28% if correlated.
Expected NPV is $123.97 either way, but its standard deviation is $153.73 for independent cash flows and $214.88 for perfectly correlated ones, raising the chance of a loss from about 21% to 28%.
Sia tip — Square the discounted standard deviations before adding when cash flows are independent; add them directly only when they are perfectly correlated.
Glossary

Key terms

Expected NPV
The probability-weighted average of a project's NPV across possible outcomes.
Sensitivity analysis
Recomputing NPV while one input changes and the others stay at their most likely values.
Monte Carlo simulation
Valuing a project across many randomly drawn sets of inputs to describe the distribution of NPV.
Certainty equivalent
The certain cash amount an investor would accept in place of a risky expected cash flow.
Break-even value
The level of one input at which a project's NPV is exactly zero.
FAQ

Sensitivity Analysis and Monte Carlo Simulation FAQ

Can I average scenario cash flows before computing NPV?

Yes for a plain project, because expected NPV is linear in the cash flows. No once there is an option such as abandonment, which changes the cash flows only in some states; then each branch must be valued before averaging.

What should a sensitivity table be used to decide?

Which input deserves attention. Report the input that moves NPV most, its break-even value and how far the most likely forecast sits from it. An input whose line is nearly flat can be estimated roughly without changing the decision.

Why does correlation between years matter?

Positively correlated cash flows move together, so good and bad years cluster and the spread of NPV widens. The expected NPV is unchanged, but the probability of a loss rises, which matters to a manager worried about downside risk.

Does simulation tell me which discount rate to use?

No. Simulation describes total risk, while markets reward only risk that cannot be diversified away. Discount at the opportunity cost of capital and use the simulated distribution to understand exposure, not to set the rate.

What is a two-way data table?

An Excel table that recomputes NPV over a grid of values for two inputs at once, such as sales and salvage. The Week 3 case asks for grid values that reflect the stated probability distributions rather than arbitrary percentages.

How are certainty equivalents related to risk-adjusted discounting?

Both give the same present value. One discounts the expected cash flow at a risk-adjusted rate; the other shrinks it to a certain amount and discounts at the risk-free rate. The shrink factor falls the further away the cash flow is.

Study strategy

Exam move

Rebuild the sensitivity table for a small project, locate the break-even sales level, and add an abandonment branch. Then compute the standard deviation of NPV both ways from the formula sheet.

Working through Sensitivity Analysis and Monte Carlo Simulation in EFN507? Sia is AskSia’s AI Finance tutor — ask any EFN507 Sensitivity Analysis and Monte Carlo Simulation question and get a clear, step-by-step explanation grounded in how EFN507 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 16 of your Queensland University of Technology subjects - and 1,000+ Bibles across every Australian university.
Sia - your EFN507 tutor, unlimited, worked the way the exam marks it
The full 4-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works