UNSW Sydney · FACULTY OF ACCOUNTING

ACCT5955 Chap.5 Enabling Performance Measurement

- one subject, every graph, every model, every mark
6 Chapters4-page Bible
Our own words - no uploaded lecturer files
Updated for this semester
Chapter 5 of 7 · ACCT5955

Enabling Performance Measurement

The captured course reading examines how employees can experience a performance-measurement system as enabling rather than primarily coercive. Its longitudinal field study finds that development based on local experience, experimentation, professionalism and transparency can make measures more useful to the people whose work is represented.

Enabling formalisation helps employees understand and improve work, while coercive formalisation focuses on compliance and senior monitoring. Performance measures remain incomplete because separate indicators may omit dependencies and trade-offs across cost, quality, responsiveness or time. The chapter therefore treats measure development as an iterative process.

Users test definitions, data and presentation, observe behaviour, expose unintended consequences and repair the system before high-stakes consequences make defects harder to correct.

In this chapter

What this chapter covers

  • 01

    Enabling and coercive formalisation as different employee experiences

  • 02

    Experience-based development using local practices and know-how

  • 03

    Experimentation with definitions, data and presentation

  • 04

    Internal transparency, global transparency, flexibility and repair

  • 05

    Performance-measure incompleteness and defensive behaviour

  • 06

    The dual role of measures in decision support and monitoring

Worked example · free

Piloting a warehouse measure before attaching bonuses

Q [5 marks]. A fictional distribution centre plans to reward pallets moved per hour. Staff respond by splitting loads and postponing difficult replenishment. Redesign the development process. The marks shown are an AskSia practice weighting, not a published university marking scheme.
Development is iterative.Development is iterative. Existing know-how becomes a prototype, use reveals defects, and review refines definitions, data and presentation.local experienceprototype measureuse and reviewEnabling resultvalid and understandablerepairable and transparentuseful to the people measured
Development is iterative. Existing know-how becomes a prototype, use reveals defects, and review refines definitions, data and presentation.
  • +1Identify movement volume as an incomplete representation of useful work.
  • +1Delay bonus consequences while the definition and behavioural response are tested.
  • +1Compare movements with fulfilled orders, damage, delay and replenishment availability.
  • +1Involve operators in defining exclusions, reviewing examples and repairing data.
  • +1Set targets only after the measure predicts useful flow without shifting cost elsewhere.
Run a transparent, non-punitive pilot that connects the measure to useful output and countervailing outcomes. Let users repair definitions before the number becomes a rewarded score.
Sia tip — Prototype the measure as information before converting it into pressure.
Glossary

Key terms

Enabling formalisation
Rules or systems experienced as helping employees understand, improve and master their work.
Coercive formalisation
Rules or systems used primarily to force compliance and monitor employee effort.
Internal transparency
Understanding of how a measure works, how it is calculated and why it exists.
Global transparency
Understanding of how local work and measures connect to the wider organisational process.
Control flexibility
Capacity for users to respond sensibly when local contingencies make a standard routine unsuitable.
System repair
The ability of users to correct or improve a defective measure, rule or reporting process.
Measure incompleteness
Failure of indicators to represent every relevant dimension, dependency or trade-off.
FAQ

Enabling Performance Measurement FAQ

What makes a performance measure enabling?

Employees can understand the measure, connect it to the wider process, use it to identify problems, exercise justified flexibility and help repair defects. Enabling quality depends on development and use, not on the metric label alone.

Why should employees help design measures?

Employees hold detailed knowledge about definitions, exceptions, data and operational trade-offs. Their involvement can improve validity and understanding, especially when the process builds on experience and permits genuine experimentation rather than ceremonial consultation.

What is performance-measure incompleteness?

It is the gap between complex organisational performance and the separate indicators used to represent it. Dependencies can disappear, so apparent improvement in one number may shift cost into quality, responsiveness, inventory or another unit.

When does a measure become coercive?

Coercive effects appear when the system primarily forces compliance, ignores contingencies, prevents challenge or attaches consequences to a defective representation of work. Defensive target negotiation, concealment and short-term gaming are warning signs.

Does enabling measurement remove accountability?

No. It seeks more valid and usable accountability. Transparent definitions, user knowledge and repair can strengthen performance review by making the number easier to understand and harder to improve through behaviour that harms the wider process.

How should a new measure be developed and reviewed?

Begin with the decision the measure must support and the local experience already used to understand that work. Write the definition, boundary, exclusions, data owner and likely trade-off. Pilot the measure without reward or punishment, show users how it is calculated and collect cases where the number conflicts with their operational knowledge.

Compare it with countervailing outcomes so apparent improvement cannot simply shift cost into quality, delay or another unit. Let employees propose repairs and record definition changes in a version ledger. Audit internal transparency, global transparency, flexibility and repair separately. Only attach targets or consequences after the measure is sufficiently stable and its behavioural effects are understood.

Continue to review defensive target negotiation, concealment, task selection and short-term decisions. A measure may remain valuable for local learning even when it is unsuitable for corporate comparison or individual reward.

Study strategy

Assessment move

Read the performance-measurement chapter as a development sequence. For any metric, write its definition, data source, intended decision, user and likely trade-off. Then design a pilot that reveals misunderstanding or gaming before consequences are attached. Audit internal transparency, global transparency, flexibility and repair separately.

Finish by stating the limits of the field evidence and the conditions under which its findings are most likely to transfer. Keep a definition ledger through every practice case. Record changes, disputed examples and breaks in comparability. Pair the headline number with one countervailing outcome and one observed behaviour.

Before recommending a target or reward, explain why the measure is stable enough for consequences and how users can challenge a defect without retaliation.

Working through Enabling Performance Measurement in ACCT5955? Sia is AskSia’s AI Accounting tutor — ask any ACCT5955 Enabling Performance Measurement question and get a clear, step-by-step explanation grounded in how ACCT5955 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 100 of your UNSW Sydney subjects - and 1,000+ Bibles across every Australian university.
Sia - your ACCT5955 tutor, unlimited, worked the way the exam marks it
The full 4-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works
ACCT5955 · Management Control Systems in Contemporary Contexts - independent study guide on the AskSia Library. More UNSW Sydney subjects · Microeconomics across all universities