Line of Balance and PERT

Line-of-balance charts represent repeated work across locations or units and make production rate, buffer and interference visible. PERT addresses a different scheduling problem: uncertain activity time. It uses optimistic, most likely and pessimistic estimates to derive an expected duration and variance. Both methods retain structure that a single deterministic bar chart hides.

In this chapter

What this chapter covers

  • 01

    Read line slope as a repeated-work production rate

  • 02

    Use start buffers to prevent activity interference

  • 03

    Distinguish a shifted start from a changed production rate

  • 04

    Calculate a PERT expected duration from three estimates

  • 05

    Calculate activity and path variance with correct units

  • 06

    Recognise independence and normal-approximation limits

Worked example · free

Calculate a PERT activity mean and variance

Q [4 marks]. An inspection package has optimistic time three days, most likely time five days and pessimistic time nine days. Find expected duration, variance and standard deviation. (4 marks) The weighting is local to this new revision problem and is not an official university assessment scheme.
Parallel production lines remain separated only when the following activity starts with enough buffer and progresses at a compatible rate; a flatter line signalParallel production lines remain separated only when the following activity starts with enough buffer and progresses at a compatible rate; a flatter line signals interference risk.excavatepipeslow pipe risktimelocation or unit
Parallel production lines remain separated only when the following activity starts with enough buffer and progresses at a compatible rate; a flatter line signals interference risk.
  • +1Expected duration is (3+4×5+9)/6=32/6=5.33 days.
  • +1The duration range used for standard deviation is 9-3=6 days.
  • +1Standard deviation is 6/6=1 day.
  • +1Variance is the square, 1 day squared, ready to add with independent path variances.
Expected duration is 5.33 days, variance is 1 day squared and standard deviation is 1 day. Means and variances, not standard deviations, are added along an independent path.
Sia tip — Write variance with squared-time units. That small notation check prevents adding a variance directly to a mean.
Glossary

Key terms

Line of balance
A time-location chart representing production progress for repeated activities across units or work areas.
Production buffer
The planned separation between predecessor and follower work that prevents spatial or temporal interference.
Optimistic time
The activity duration expected when conditions proceed well, distinct from a deliberately crashed duration.
Most likely time
The modal activity duration judged most plausible under the stated working method and conditions.
PERT variance
The squared uncertainty measure derived from the pessimistic and optimistic duration range.
FAQ

Line of Balance and PERT FAQ

What does a crossing line mean in line of balance?

It signals that one activity catches another across time or location, creating interference or an impossible sequence. Change the start buffer, production rate, crew arrangement or method so the follower remains safely separated.

Is the PERT optimistic time a crash time?

No. It is a plausible duration when the activity proceeds well under the defined method. Crash time belongs to an accelerated method with its own resource and cost assumptions. Mixing them understates uncertainty and confuses two different models.

Why are path variances added instead of standard deviations?

Under the independence assumption, variances of activity durations add along a path. The path standard deviation is the square root of that total variance. Adding standard deviations directly overstates or misstates dispersion.

Where should a line-of-balance buffer be checked?

Check separation at the first unit, last unit and every production-rate change. Converging activity lines may begin safely yet create a later workface conflict between crews.

Study strategy

Exam move

For line of balance, sketch axes first and label which direction represents time and which represents location or units. Draw two activities with the same slope and a safe buffer, then change the follower slope until the lines cross. Explain whether the problem comes from start timing or production rate. For PERT, memorise the mean and variance formulas through repeated calculation rather than isolated recall.

Build small paths, add expected durations and variances, then convert a deadline into a standard score only after checking the assumptions. Keep optimistic time separate from crash time. Revise the limitations: activity dependence, competing paths and too few summed durations can weaken the simple normal approximation.

In a written answer, state both the numerical result and which project assumption is most likely to determine whether that result is credible. Create a time-location dataset for six repeated units and calculate the production rate of each trade from the line slope. Identify the minimum separation needed for access, curing or safety, then test the buffer at both the first and last unit.

Parallel lines preserve separation; converging lines predict a future clash even when the first unit appears safe. Compare three remedies: delay the follower, change crew productivity or divide the work into zones. State how each affects continuity and completion. For PERT, build a calculation table with optimistic, most likely and pessimistic times, expected duration, standard deviation and variance.

Add expected durations and variances along the selected path, not standard deviations. Convert the deadline to a standard score using the path mean and square root of total variance, then describe the probability in words. Test a second near-critical path rather than assuming one path always controls. Ask whether activity durations share weather or access drivers, because dependence weakens simple addition.

Explain that an optimistic estimate is a plausible low duration under favourable conditions, not a crash duration purchased through extra resources. Finish by stating the approximation limits and one better next step, such as simulation when paths compete or distributions are materially skewed.

A+Everything unlocked
Unlocks this Bible + all 103 of your UNSW Sydney subjects - and 1,000+ Bibles across every Australian university.
Sia - your CVEN9702 tutor, unlimited, worked the way the exam marks it
The full 3-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works
CVEN9702 · Project Planning and Control - independent study guide on the AskSia Library. More UNSW Sydney subjects · Microeconomics across all universities