UNSW Sydney · FACULTY OF ELECTRICAL ENGINEERING

SOLA2540 Chap.1 System Design and Load Assessment

- one subject, every graph, every model, every mark
8 Chapters3-page Bible
Our own words - no uploaded lecturer files
Updated for this semester
Chapter 1 of 4 · SOLA2540

System Design and Load Assessment

Stand-alone PV design starts by defining the service and tracing the energy path. Unlike a grid-connected system, a stand-alone installation cannot rely on the network to absorb surplus or cover a shortfall.

The load assessment must therefore distinguish daily energy, credible maximum demand and start-up surge, identify critical and shiftable loads, separate seasonal cases, and state assumptions about future growth and acceptable outage.

Those quantities control different decisions: daily watt-hours feed array and storage work, simultaneous apparent power feeds inverter and cable checks, and surge feeds short-duration equipment capability. This chapter uses original scenarios to build an auditable load table and diagnose assumptions that can corrupt every later component size.

In this chapter

What this chapter covers

  • 01

    Grid-connected and stand-alone systems use different design philosophies because only the grid-connected case has network backup

  • 02

    The stand-alone energy path links array, controller, battery, direct DC loads, inverter and AC loads

  • 03

    Daily design energy is the sum of appliance count, power and operating time

  • 04

    AC and DC energy are calculated separately before AC demand is referred to the DC bus through inverter efficiency

  • 05

    Maximum demand uses credible coincidence, not an automatic sum of every nameplate

  • 06

    Surge demand is a short apparent-power event that may control inverter and battery selection

  • 07

    Seasonal variation, standby consumption, future growth and demand management belong in explicit scenarios

  • 08

    Critical and shiftable loads connect the numerical load table to the user's required level of service

Worked example · free

Build a load table for an original remote workshop

Q [4 marks]. A remote workshop has a 110 W communications unit running all day, four 12 W lights used for 7 hours, a 450 W refrigerator with measured use equivalent to 6 hours at rated power, and a 1,100 W pump used for 45 minutes. Find daily AC energy and one credible managed running-demand case. This practice weighting is not an official university assessment scheme.
Functional energy path.Functional energy path. The array supplies a controlled DC bus, the battery shifts energy through time, DC loads connect directly, and the inverter creates the AC supply. Protection and isolation are design functions, not optional accessories. PV arrayvariable DC source Controllercharge control Batteryenergy buffer DC loadsdirect supply InverterDC to AC ACloads Protection, isolation, metering and controls surround every branch.
Functional energy path. The array supplies a controlled DC bus, the battery shifts energy through time, DC loads connect directly, and the inverter creates the AC supply. Protection and isolation are design functions, not optional accessories.
  • +1Communications energy is 110 × 24 = 2,640 Wh/day and lighting energy is 4 × 12 × 7 = 336 Wh/day.
  • +1Refrigeration energy is 450 × 6 = 2,700 Wh/day and pumping energy is 1,100 × 0.75 = 825 Wh/day.
  • +1Total AC energy is 2,640 + 336 + 2,700 + 825 = 6,501 Wh/day before referring it through inverter efficiency.
  • +1If pumping is scheduled with lights off, a credible pump-period running total is 1,100 + 450 + 110 = 1,660 W before power-factor and surge adjustments.
The workshop uses 6,501 Wh/day of AC energy. A managed pump-period running case is 1,660 W when the pump, refrigerator and communications unit may coincide but lighting is scheduled off. This is not yet an inverter rating because power factor and start-up surge are missing.
Sia tip — Write the operating assumption beside each duration and coincidence case. A correct multiplication built on an unexplained duty cycle is not a defensible load assessment.
Glossary

Key terms

Stand-alone system
A power system not connected to a distributor network. It must meet the agreed service with local generation, storage, controls and any specified backup.
Daily design energy
The watt-hours consumed by the planned loads over a design day, calculated from appliance power, number and operating duration for a stated seasonal case.
Maximum demand
The credible simultaneous power of the highest-power load and other loads likely to operate at the same time under the stated management plan.
Surge demand
A short-duration apparent-power requirement produced by starting or another transient event. It can exceed the ordinary running demand by a large margin.
Demand management
Scheduling or controlling loads to lower maximum demand or shift energy use toward periods of strong renewable generation without losing the required service.
Critical load
A service that must remain available under the agreed reliability target and therefore cannot be shed as freely as a deferrable or shiftable load.
FAQ

System Design and Load Assessment FAQ

Why are daily energy and maximum demand different?

Daily energy accumulates appliance use over time and is measured in watt-hours. Maximum demand is a simultaneous power condition measured in watts or volt-amperes. A small motor can use little energy yet create the controlling surge, while a low-power communications load can dominate daily energy because it runs continuously.

Arrays and storage need the energy result, but inverters, batteries, conductors and protection also need demand and surge checks.

Should every appliance be added to maximum demand?

Only if every appliance can credibly operate at the same time. Build a scenario from the highest-power load plus the loads likely to coincide, then state any scheduling, interlock or user practice that prevents another load from joining it. A demand-management rule is valid only if the user can follow it and critical service remains available. Keep a separate adverse case when coincidence is uncertain.

How should seasonal loads be handled?

Create separate seasonal load cases rather than hiding heating, cooling or operating changes inside one annual average. Recalculate appliance hours and criticality for each relevant season, then compare those loads with the matching seasonal solar resource. The controlling design period can be caused by high demand, low resource or their combination, so the load and resource calendars must use compatible time periods.

What usually goes wrong in a load table?

Common errors include confusing rated power with energy, ignoring standby consumption, using traffic or active time instead of energised time, assuming every load coincides, treating motor surge as ordinary daily energy, and mixing AC energy with DC-bus energy before applying inverter efficiency.

The repair is to label units and boundaries, show each duration assumption, and maintain separate energy, running-demand and surge sections.

Study strategy

Assessment move

Build one original load table and keep it alive through the course. Start with counts, nameplate or measured power, operating hours, supply type, power factor, start duty, criticality and season. Calculate daily AC and DC energy separately, then refer the AC energy to the DC bus using the appropriate weighted inverter efficiency.

Draw a twenty-four-hour sketch to identify credible coincidence rather than summing all appliances. Add a start-up case for the largest motor and any load that may start with it. Next, change one assumption: move the pump into solar hours, add winter lighting, or introduce future growth. Explain which total changes and which component decision should respond.

For written answers, lead with the service requirement, show the calculation, and close with the missing compatibility check. Practise spotting category errors: watt-hours cannot directly size an inverter, running watts cannot replace apparent power, and a surge factor should not inflate the entire daily energy total.

Before using the result downstream, ask whether the demand-management plan preserves critical loads and whether the user has accepted the implied reliability.

Working through System Design and Load Assessment in SOLA2540? Sia is AskSia’s AI Electrical Engineering tutor — ask any SOLA2540 System Design and Load Assessment question and get a clear, step-by-step explanation grounded in how SOLA2540 is taught and assessed. Read this chapter free, then take your hardest questions to Sia.

A+Everything unlocked
Unlocks this Bible + all 100 of your UNSW Sydney subjects - and 1,000+ Bibles across every Australian university.
Sia - your SOLA2540 tutor, unlimited, worked the way the exam marks it
The full 3-page Bible + practice bank with worked solutions
Chrome extension - sync your LMS so Sia knows your deadlines
Bilingual EN / Chinese on every Bible and every Sia answer
$0.99 Trial
30-day money-back · cancel in one tap · how it works
SOLA2540 · Applied Photovoltaics - independent study guide on the AskSia Library. More UNSW Sydney subjects · Microeconomics across all universities